Summary
Overview
Work History
Education
Skills
Timeline
Generic

Juan Maldonado

Fort Worth,TX

Summary

Experienced with managing batch plant operations in a safely timely manner. Pour the most amount of yards in the past 9 years. Brings positive attitude and commitment to learn and grow in organizations.

Overview

8
8
years of professional experience

Work History

Batch Plant Operator

PSC
05.2025 - Current


  • Monitored equipment for safety compliance and operational efficiency.
  • Operated batch plant equipment to ensure consistent quality and efficient production processes.
  • Ran Liberty System on MC 11 Erie Strayer Batch Plant to produce concrete.
  • Maintenance on Batch Plant fixing worn out parts.
  • Placed orders for materials.
  • Assisted on setting up Batch Plants


Batch Plant Operator

Zachry Construction Corporation
08.2021 - 05.2025
  • Ran Liberty System on Erie Strayer MC 12
  • Ran command alkon on vance hagen batch plant
  • Monitored equipment for safety compliance and operational efficiency.
  • Operated batch plant equipment to ensure consistent quality and efficient production processes.
  • Maintenance on batch plant fixing worn out parts.
  • Placed orders for materials.
  • Assisted on setting up batch plants

CNC Operator

Irwin Steel
03.2018 - 08.2021
  • Ran voortman and peddinghaus
  • Took in inventory
  • Read architectural blue prints to program CNC machines to cut material that was needed.
  • Learned how to fabricate/weld

Education

High School Diploma -

Brewer High School
Fort Worth, TX
06.2017

Skills

  • Leadership Skills
  • Mechanical Skills
  • Heavy equipment operation(Man Loader, Skeed Steer, Man Lift, Back Hoe, Mini X, Sky trak/JLG)
  • Fast at batching
  • Reliability
  • Time management

Timeline

Batch Plant Operator

PSC
05.2025 - Current

Batch Plant Operator

Zachry Construction Corporation
08.2021 - 05.2025

CNC Operator

Irwin Steel
03.2018 - 08.2021

High School Diploma -

Brewer High School