Overview
Work History
Timeline
Generic

KADY SAWERS

Redondo Beach,CA

Overview

15
15
years of professional experience

Work History

PLANT OPERATOR

AIR PRODUCTS, LLC
04.2020 - 07.2022
  • Maintained logs and observed trends to identify possible failures and discrepancies leading to 95% less plant trips and component failures.
  • Monitored operability of fire protections systems, electrical equipment and associated instrumentation to maintain environmental compliance, leading to 4 verified safety systems engaging upon a plant trip.

NAVY NUCLEAR ELECTRICIAN'S MATE

US NAVY
07.2010 - 04.2020
  • Monitored all electrical equipment in the plant and controlled all electrical casualties within the reactor plant, ensuring safe operation and maintaining power at all times during 8-month deployment.
  • Coordinated the maintenance, testing, and routine operation of all reactor plant generators, switchboards, bus ties, transformers, load-centers, automatic and manual bus transfer devices, and electronics, increasing reliability of the plant by 85%.

INTERNSHIP

USDA Natural Resources Conservation Services
01.2025 - 08.2025
  • Assisted in research data collection and development of technical documents for wider agency use, including writing 2 new Plant Guides for the USDA Plants Database and updating 1 existing Plant Guide for publication on the USDA Plant Materials Center website.
  • Assisted PMC staff in data collection review and technical report writing for agency wide use and publication.
  • Plant Materials Center

Timeline

INTERNSHIP

USDA Natural Resources Conservation Services
01.2025 - 08.2025

PLANT OPERATOR

AIR PRODUCTS, LLC
04.2020 - 07.2022

NAVY NUCLEAR ELECTRICIAN'S MATE

US NAVY
07.2010 - 04.2020
KADY SAWERS