Competent Installation Supervisor adept at coordinating diverse resources to accomplish objectives under tight deadlines. Ready to bring [Number] years of experience and advanced project management skills to a challenging new role with room for growth and advancement.

Overview

12
12
years of professional experience
1
1
Certification

Work History

Installation Supervisor/Site Manager

M/s Hitachi Energy Technology Services Pvt ltd.
04.2020 - Current
· Installation supervision and testing of primary equipment’s in FACTS. · Installation of Control and Protection cubicles, Electrical yard equipment’s, power and control cable laying/termination and testing of fiber cable, installation of reactors & capacitor filter units, distribution panels and switchgears. · Knowledge of Protection relays and Control System (SCMS / SCADA). · Coordinate with design engineering teams, Sub-contractors, consultants, suppliers and customers and ensure the Installation activities are carried out smoothly and meeting the time schedule. Project – 1 LINXON Sea green Onshore substation, Scotland (Greenfield project) Installation supervision for the 3 no’s of +/- 185MVar STATCOM Dynamic reactive compensator (DRC) equipment’s like IGBT’s, Pump Skid, Cooling towers, external cooling system piping and all the Outdoor equipment’s related to DRC.
Project – 2 Los Pelambres Mining company – Chile (Greenfield project) Installation supervision for the 1 no’s of +/- 185MVar STATCOM Dynamic reactive compensator (DRC) equipment’s like IGBT’s, Pump Skid, Cooling towers, external cooling system piping and all the Outdoor equipment’s related to DRC.
Project – 3 Electricity and water Authority (EWA) – Bahrain (Greenfield project) Installation supervision for the 3 no’s of +/- 200MVar STATCOM Dynamic reactive compensator (DRC) equipment’s like IGBT’s, Pump Skid, Cooling towers, external cooling system piping and all the Outdoor equipment’s related to DRC.
Project – 4 Tata BSL SVC-Q Angul,Odhisa: 2nd and 3rdHarmonic filter bank erection and the related connections for SVC-Q(Industry)project.
Project – 5 PGCIL Ranchi-India (Retrofit project): Responsible for the replacement of equipment’s such as Capthor’s in the existing Fixes series capacitor banks followed by gas filling in the 400/220KV PGCIL Substation-Ranchi. By inserting the Series capacitor banks into the grid network, PGCIL can transmit extra 240 MW in the existing transmission line.

Some of the Major PQS tenders handled: 1 Henderson SC budgetary tender 2 Piracicaba, Brazil SVC-Q Control Upgrade 3 Fingrid-OSU Upgrade 4 NanKe STATCOM 5 Aries STATCOM 6 Saudi Bids - Al-Ula and Riyadh STATCOMs 7 Caño Limon SVC-U Control & protection Upgrade, CO 8 Henderson SC Firm tender


TransnetBW Enhanced (Wendlingen & Oberjettingen) - Enhanced STATCOM of BIGT Gen5 technology and super capacitor storage racks. 10 2*300MVAr STATCOM, 4*125MVAr MSC & 2*125MVAr MSR at Fatehgarh-3 & Ramgarh, India 11 KPS1 600MVAr STATCOM & KPS3 300MVAr STATCOM, India
I have been awarded Team excellence award in the Townhall meeting for contribution to the Fatehgarh tender which turned out to be a project awarded to Hitachi energy.
  • Conducted thorough post-installation inspections to verify adherence to design specifications and client expectations.

Deputy Manager

M/s ILFS ENERGY 1200MW Capacity
08.2018 - 03.2020

Sr. Engineer

M/s ILFS ENERGY 1200MW Capacity
05.2012 - 08.2018

Education

Post Graduate Diploma - Thermal Power Plant Engineering

National Power Training Institute (NPTI)
Neyveli, Tamil Nadu
02.2012

Bachelor of Engineering - Electrical & Electronics

Velammal Engineering College, Anna University
Chennai, Tamil Nadu
04.2010

Skills

  • Project Management
  • Site Management
  • Installation
  • Troubleshooting
  • Project budgeting
  • Planning and Schedule management
  • Subcontractor management
  • Cost estimation & Risk management

Accomplishments

  • Supervised team of [Number] staff members.

Certification

  • CCNSG Safety passport - ECITB (U.K), United Kingdom
  • Person in charge of works-PICW-INWCH448

Area Of Expertise

  • Project Management
  • Planning
  • Scheduling & Monitoring
  • Site Management
  • Execution
  • Client coordination
  • Design
  • Survey
  • Installation/Erection
  • Testing and Commissioning
  • Purchase
  • Supply chain Management
  • Vendor development & Sourcing
  • Quality Monitoring
  • Inspection
  • EHS & Safety audit

Projectshandled

  • LINXON Sea green Onshore substation, Scotland (Greenfield project), Installation supervision for the 3 no's of +/- 185MVar STATCOM Dynamic reactive compensator (DRC) equipment's like IGBT's, Pump Skid, Cooling towers, external cooling system piping and all the Outdoor equipment's related to DRC
  • Los Pelambres Mining company - Chile (Greenfield project), Installation supervision for the 1 no's of +/- 185MVar STATCOM Dynamic reactive compensator (DRC) equipment's like IGBT's, Pump Skid, Cooling towers, external cooling system piping and all the Outdoor equipment's related to DRC
  • Electricity and water Authority (EWA) - Bahrain (Greenfield project), Installation supervision for the 3 no's of +/- 200MVar STATCOM Dynamic reactive compensator (DRC) equipment's like IGBT's, Pump Skid, Cooling towers, external cooling system piping and all the Outdoor equipment's related to DRC
  • Tata BSL SVC-Q Angul,Odhisa, 2nd and 3rd Harmonic filter bank erection and the related connections for SVC-Q(Industry) project
  • PGCIL Ranchi-India (Retrofit project), Responsible for the replacement of equipment's such as Capthor's in the existing Fixes series capacitor banks followed by gas filling in the 400/220KV PGCIL Substation-Ranchi. By inserting the Series capacitor banks into the grid network, PGCIL can transmit extra 240 MW in the existing transmission line

Additionalskillsachievements

  • Basic fire safety, Basic life support certification and training completed - Training - from USHA Fire Safety Equipment's Pvt Ltd.
  • ECITB(UK), CCNSG safety Passport course completed - Training - from Pivotal training institute Glasgow, United Kingdom Expires - 07/15/24
  • Lean six sigma Yellow Belt
  • 100% Implementation of IMS Standards
  • Successful implementation of ISO9001:2015, ISO14001:2015, OSHAS 18001:2007
  • Successful implementation of SAP PM
  • Successful approval of certification from CEA & renewal, CEIG & renewals
  • Achieved 100% Plant Safety & 100% Equipment operational availability/uptime
  • Inventory Management & Spare raised worth over 8 Crores INR
  • Energy saving of 1 Crores/Annum by analyzing & correcting the possibilities in Lighting System, HVAC, Compressor System
  • Digsi 4.1
  • Electrical CAD-CPLR
  • SAP- Maintainace aspects
  • Certified O&M engineer of electrical equipment's

Additionallanguages

  • English
  • Hindi
  • Tamil

Computerknowledge

MS Projects, MS Office (word/excel,ppt)

Personal Information

  • Passport Number: Z6567473
  • Passport Expiry Date: 01/10/32
  • Date of Birth: 11/23/88
  • Nationality: Indian
  • Marital Status: Married

Languages

English
Full Professional

Timeline

Installation Supervisor/Site Manager

M/s Hitachi Energy Technology Services Pvt ltd.
04.2020 - Current

Deputy Manager

M/s ILFS ENERGY 1200MW Capacity
08.2018 - 03.2020

Sr. Engineer

M/s ILFS ENERGY 1200MW Capacity
05.2012 - 08.2018

Post Graduate Diploma - Thermal Power Plant Engineering

National Power Training Institute (NPTI)

Bachelor of Engineering - Electrical & Electronics

Velammal Engineering College, Anna University
  • CCNSG Safety passport - ECITB (U.K), United Kingdom
  • Person in charge of works-PICW-INWCH448