Summary
Overview
Work History
Education
Skills
Timeline
Generic

KEITH FOLLWEILER

Winter Garden

Summary


Professional controls engineer with strong emphasis on automation, system integration, and process optimization. Proven ability to enhance operational efficiency through innovative solutions and rigorous quality standards. Known for exceptional teamwork, adaptability to evolving project requirements, and delivering results-driven performance. Highly skilled in PLC programming, HMI development, and control system design, ensuring reliability and precision in complex environments.

Overview

15
15
years of professional experience

Work History

Attractions Senior Controls Engineer

Walt Disney World
10.2022 - Current
  • Led troubleshooting efforts of ride and show electrical systems during attraction downtimes.
  • Provided diagnostics and long-term solutions for recurring faults and downtime drivers within the park.
  • Worked closely with Engineering Services partners to improve and implement maintenance Job plans
  • Created and updated electrical drawings and documentation in according with Disney and industry standards.
  • Performed acceptance testing for attraction enhancements.


Attractions Senior Controls Engineer

Walt Disney World
05.2018 - 10.2022
  • Led troubleshooting efforts of textile equipment & water park attractions during downtimes.
  • Provided diagnostics and long-term solutions for recurring faults and downtime drivers throughout both disinclines.
  • Support installation of new textile equipment and gathering necessary production data.
  • Created and updated electrical drawings and documentation in according with Disney
  • Performed annual waterpark rehab return to service test plans.


Control Systems Engineer 3

Dematic Corporation
07.2011 - 05.2018
  • Created hardware and software functional specifications specific to each customer project
  • Designed control system schematics, layout drawings and panel layouts using AutoCADE
  • Develop, program, and troubleshoot Allen Bradley PLC's and HMI applications
  • Perform project commissioning and start up support
  • Trained end users on their conveyor systems how to identify and correct issues

Hardware Engineering Intern

Motorola Inc
06.2010 - 08.2010
  • Reviewed schematics of Cable Modems and performed second sourcing of various parts
  • Measured the Return Loss of a Cable Modem using a Network Analyzer
  • Performed testing on the batteries used inside the Cable Modems

Education

Bachelor of Science - Electrical Engineering

Wilkes University
Wilkes-Barre, PA
01.2011

High School Diploma -

Salisbury Senior High School
Allentown, PA
01.2007

Skills

  • Project Management
  • Electrical control design
  • Hands-on experience with project commissioning
  • Experienced with Microsoft Office Suite
  • Integration of Control Systems
  • Electrical schematics
  • System troubleshooting
  • Variable frequency drives
  • AutoCAD electrical
  • PLC (Allen Bradley, Siemens) Programming
  • HMI (Factory Talk View) Programming
  • Industrial networking protocols

Timeline

Attractions Senior Controls Engineer

Walt Disney World
10.2022 - Current

Attractions Senior Controls Engineer

Walt Disney World
05.2018 - 10.2022

Control Systems Engineer 3

Dematic Corporation
07.2011 - 05.2018

Hardware Engineering Intern

Motorola Inc
06.2010 - 08.2010

High School Diploma -

Salisbury Senior High School

Bachelor of Science - Electrical Engineering

Wilkes University
KEITH FOLLWEILER