Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Kelly James Gallagher

New Braunfels

Summary

Kelly Gallagher has over 20 years' experience in the construction industry from starting out drawing blueprints in AutoCad and has moved his way into the field and becoming a Lead Superintendent. His knowledge base revolves around the structural make up of each structure and communication with the field team and creating schedules. He is proficient in plan review and translating detail-orientated design into reality efficiently, effectively and on time.

Overview

8
8
years of professional experience
1
1
Certification

Work History

Lead Superintendent

The Reserve
Seguin
10.2023 - 03.2025
  • Company Overview: $30 million garden-style project consisting of 199 units in six buildings. Clubhouse, leasing, pool, and amenities are all located in Seguin, TX.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Coordinated with subcontractors and vendors to ensure timely completion of projects.
  • Inspected buildings to determine quality of work and need for corrections to meet project standards.
  • Inspected sites before and after construction projects.
  • Documented change orders issued during a given project's timeline.
  • Maintained electronic inventory of project paperwork, schedules and permits.
  • Verified work compliance with applicable regulations, codes and specifications.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.

Lead Superintendent

Solms Landing
New Braunfels
02.2023 - 10.2023
  • Company Overview: $45 Million 349 Unit Garden Style type of product containing 9 buildings and a Clubhouse / Leasing / Fitness Center located in New Braunfels Texas
  • Maintaining a safe jobsite and safe work environment
  • Communicating with the home office located in Houston Texas
  • Creating a complete schedule and adhering to it
  • Completing Daily reports, Pre-construction meetings, subcontractor scheduling, safety orientations, site safety management, reviewing plans, quality control on the job, Owner acceptance walks, 3rd party inspections, State and Local inspections
  • $45 Million 349 Unit Garden Style type of product containing 9 buildings and a Clubhouse / Leasing / Fitness Center located in New Braunfels Texas

Superintendent

Block 36
Austin
10.2020 - 02.2023
  • Company Overview: $52 Million 249 Unit Double wrap podium with 1.5 floors of underground parking located below the 4 story super structure Located Downtown Austin Texas
  • Maintaining a safe jobsite and safe work environment
  • Creating a complete schedule and adhering to it
  • Completing Daily reports, Pre-construction meetings, subcontractor scheduling, safety orientations, site safety management, material delivery scheduling, reviewing plans, quality control on the job, Owner acceptance walks, 3rd party inspections, State and Local inspections
  • $52 Million 249 Unit Double wrap podium with 1.5 floors of underground parking located below the 4 story super structure Located Downtown Austin Texas

Superintendent

Double Creek
Austin
04.2019 - 10.2020
  • Company Overview: $34 Million 372 Unit, 12 Apartment Buildings (3 story), Clubhouse, Garage and Carports located in South Austin set of almost 18 acres of land
  • Maintaining a safe jobsite and safe work environment
  • Creating a complete schedule and adhering to it
  • Completing Daily reports, Pre-construction meetings, subcontractor scheduling, safety orientations, site safety management, material delivery scheduling, reviewing plans, quality control on the job, Owner acceptance walks, 3rd party inspections, State and Local inspections
  • $34 Million 372 Unit, 12 Apartment Buildings (3 story), Clubhouse, Garage and Carports located in South Austin set of almost 18 acres of land

Assistant Superintendent

Arnold 2 (Candela)
Austin
05.2018 - 04.2019
  • Company Overview: $21 Million 119 unit, 2 stories of subterranean garage, 5 stories of wood framing above, multi-use, high density, apartment project with 99,572 net rentable square footage, located on 0.73 acres in Austin, Texas
  • Pre-construction meetings, subcontractor scheduling, safety orientations, site safety management, material delivery scheduling, reviewing plans, quality control on the job, Owner acceptance walks, 3rd party inspections, State and Local inspections
  • $21 Million 119 unit, 2 stories of subterranean garage, 5 stories of wood framing above, multi-use, high density, apartment project with 99,572 net rentable square footage, located on 0.73 acres in Austin, Texas

Assistant Superintendent, Superintendent

Studio Eastside (Indie)
Austin
04.2017 - 05.2018
  • Company Overview: $14 Million 139 unit, 3 stories of subterranean garage, 5 stories of wood framing above, multi-use, high density, podium style, studio apartment project with 57,610 net rentable square footage, located on 0.5 acres, in Austin, Texas
  • Pre-construction meetings, subcontractor scheduling, safety orientations, site safety management, material delivery scheduling, reviewing plans, quality control on the job, Owner acceptance walks, 3rd party inspections, State and Local inspections
  • $14 Million 139 unit, 3 stories of subterranean garage, 5 stories of wood framing above, multi-use, high density, podium style, studio apartment project with 57,610 net rentable square footage, located on 0.5 acres, in Austin, Texas

Education

Associates Degree - Architectural Drafting and Design

New England Technology Institute

Skills

  • Project management
  • Contract management
  • Design review
  • Building codes
  • Safety management
  • Construction documentation
  • Time management

Certification

  • OSHA 30
  • CPR - First Aid Certified
  • Forklift and Vertical Lift Certifications

Timeline

Lead Superintendent

The Reserve
10.2023 - 03.2025

Lead Superintendent

Solms Landing
02.2023 - 10.2023

Superintendent

Block 36
10.2020 - 02.2023

Superintendent

Double Creek
04.2019 - 10.2020

Assistant Superintendent

Arnold 2 (Candela)
05.2018 - 04.2019

Assistant Superintendent, Superintendent

Studio Eastside (Indie)
04.2017 - 05.2018

Associates Degree - Architectural Drafting and Design

New England Technology Institute
Kelly James Gallagher