Fast adjusting Estimator with over 15 years of experience in the scope of work who is able to work with others well. Able to develop strong relationships with members in the field as well as clients to come up with unique solutions the the problems that present themselves on the job. Detail oriented and self driven to minimize costs while at the same time maximizing potential profits. Great with organization and successful with managing multiple tasks both in a remote and in house settings.
Overview
29
29
years of professional experience
Work History
Estimator
Erico Utility Construction
10.2017 - Current
Used specialized software to create estimates quickly and accurately and make estimates easily understandable and shareable.
Established a reputation for delivering reliable and accurate estimates, resulting in increased client trust and repeat business opportunities.
Gathered cost and material data for accurate and up-to-date information on material and labor costs.
Calculated labor hours accurately based on trade-specific productivity rates, leading to more realistic project timelines and work plans.
Coordinated with those in the field on a more personal level to assess what costs on the job arise and how I can fit those costs into my future bids.
Used my previous experience in the field to adjust how I bid jobs to have a more accurate representation of materials needed and what can be done in the field to stay under budget in a safe and legal manor.
participated in pre bid meetings and coordinated with those doing the on-site precon meetings to understand the scope of work and the potential issues that may arise when the projects are being completed
Lead Estimator/Cross Connect Technician
Pearce Services
10.2007 - 10.2017
Improved client relations through clear communication of project costs and expectations during negotiations.
Optimized resource allocation with thorough analysis of labor and material requirements.
Enhanced proposal presentation quality by incorporating visually engaging graphics and concise summaries of key points.
Maintained up-to-date knowledge of industry trends, ensuring accurate estimations based on current market conditions.
As a field tech, I repaired PFPs, Cabinets, worked on Cell sites, and did copper cable locating as the job required.
Used my knowledge gained from my Field experience to understand what the jobs I was bidding actually took to come to completion.
Very active in the planning process, working with engineers for various contractors to better learn more effective ways to complete jobs under our time limit and under budget
Mentored junior estimators in best practices, fostering a collaborative work environment focused on continuous improvement.
Forman
Price Plastering
06.1995 - 10.2007
Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
Maintained a safe working environment through adherence to safety protocols and regular site inspections.
Ensured timely completion of projects with effective time management and prioritization of tasks.
Checked equipment to determine if maintenance was required.
Spent my time learning the tricks of the trade to develop a fantastic product within an effective time frame
skills in this job included texture work, scaffold building, mixing, and safe worksite management
Education
Tower Climbing Certification - Tower Climbing And Safety
Tower Climbing School
Sacramento, CA
08.2010
High School Diploma -
Atascadero High School
Atascadero, CA
06.1995
Skills
Cost Estimation
Multi Level Coordination
Estimate Preparation
use of a multitude of estimating software
developing good relationship with vendors
Project planning
Networking on a multitude of levels
Knowledge of scope of work
Cost Analysis and reporting
Timeline
Estimator
Erico Utility Construction
10.2017 - Current
Lead Estimator/Cross Connect Technician
Pearce Services
10.2007 - 10.2017
Forman
Price Plastering
06.1995 - 10.2007
Tower Climbing Certification - Tower Climbing And Safety