Summary
Overview
Work History
Skills
Timeline
Generic

Kevin Gardner

Denham Springs,LA

Summary

Results-driven Pipefitter General Foreman with increasing degrees of responsibilities and job duties, having extensive experience in interpreting technical documentation and optimizing workflow processes. Proficient in leading large crews of skilled craftsmen while ensuring project completion within budget and on schedule. Collaborates effectively with Project Managers, Engineering, and Quality Control to uphold client satisfaction and regulatory compliance.

Overview

29
29
years of professional experience

Work History

Pipe Fitter General Foreman

The Shaw Group
06.1997 - Current
  • Read and interpreted specifications, diagrams and blueprints for job.
  • Observed safe work rules and utilized fall protection and PPE.
  • Threaded and installed pipe using pipe wrench and dies.
  • Fabricated and positioned screw pipe, socket weld pipe and stainless steel tubing.
  • Threaded pipes using specified machinery.
  • Managed movement of materials and equipment to different job sites.
  • Used welding and soldering equipment to join sheet metal components following blueprints and job specifications.
  • Filled piping systems with water and air to test for leaks.
  • Oversaw crew of pipefitters, answered questions and provided feedback on work.
  • Installed and repaired gas lines and hot and cold water lines.
  • Installed pipe assemblies, fittings and valves to complete plumbing systems for Oil, Gas, Chemical, and Power customers.
  • Performed rigging and forklift operations to maneuver parts and machinery.
  • Inspected worksites to determine presence of obstructions, unsafe conditions and crew errors.
  • Identified, removed and replaced worn components to maximize system functionality.
  • Performed emergency on-call work hours during evening, weekends and some holidays.

  • Applied specialized skills such as welding to complete high-quality piping work.
  • Modified piping systems with task-specific tools to complete preventive maintenance.
  • Installed piping systems in compliance with safety regulations and industry standards.
  • Interpreted blueprints and schematics to determine material requirements and layout specifications.

Skills

  • Piping specifications
  • Experienced with Machining equipment
  • Preparation of materials
  • Solid mechanical problem-solving skills
  • Understanding ISO technical drawings
  • Knowledge of ANSI, ASME, and PFI codes
  • Effective analytical thinker
  • Problem-solving skills
  • Planning
  • Pipefitting
  • Emergency repairs
  • Materials ordering
  • Project management
  • Construction management
  • Systems troubleshooting
  • Blueprint analysis
  • Diagram interpretation

Timeline

Pipe Fitter General Foreman

The Shaw Group
06.1997 - Current
Kevin Gardner