I was so the job was we were striping roads. There was trucks four big trucks. One was a paint truck. One was a truck for cones to put on the wet paint. So most of the time I would be on the back of the truck with the cones and I was the labor so I would put codes on all the wet paint from the road. And then there was times where I would do convoy where that means it was so hot that we would just sit in the truck and slowly paint the roads so I can drive big trucks as well, it was just a seasonal job so I had to put my two weeks and then leave. Pretty much was the labor and I drove a lot
Demonstrated strong problem-solving skills, resolving issues efficiently and effectively.
Utilized advanced technical skills and expertise to troubleshoot complex problems and implement solutions.
Maintained updated knowledge through continuing education and advanced training.
Promoted high customer satisfaction by resolving problems with knowledgeable and friendly service.
Operated equipment and machinery according to safety guidelines.
Managed inventory and supplies to ensure materials were available when needed.
Achieved cost-savings by developing functional solutions to problems.
Completed day-to-day duties accurately and efficiently.
Contributed innovative ideas and solutions to enhance team performance and outcomes.
Recognized by management for providing exceptional customer service.
Utilized various software and tools to streamline processes and optimize performance.
Completed routine maintenance and repair.
Updated and maintained databases with current information.
Prioritized and organized tasks to efficiently accomplish service goals.
Worked with cross-functional teams to achieve goals.
Managed household errands and other essential duties.
Painter Laborer
Km contracting
Wilmington, DE
02.2020 - 02.2024
It was a remodeling company. I was mostly the labor. I did all the demos from digging to tearing houses apart and then every time there was a paint job I would do the painting, but majority of my job was skilled labor and would help carpenters I would do all the demos and everything.
Cleaned up job site after work completion.
Attended safety meetings regularly to learn about new products, techniques or procedures related to painting jobs.
Transported ladders, scaffolding, drop cloths and other materials to the job site.
Applied primer on walls and ceilings prior to painting.
Installed drop cloths around furniture and fixtures prior to starting work.
Ensured proper ventilation while working with hazardous chemicals like paint thinner or stripper.
Inspected painted surfaces for defects such as cracks or blisters.
Calculated surface area of walls and ceilings accurately in order to estimate the amount of paint needed.
Removed old wallpaper from walls using steamers or scrapers.
Carried out minor repairs to damaged surfaces before painting them.
Mixed various paints according to specifications.
Adhered strictly to safety protocols when operating power tools like ladders, lifts.
Selected appropriate types of paints and finishes based on customer requirements.
Kept records of all supplies used during each job including paint colors, amounts and brands used.
Assisted in mixing large batches of paint using colorants, thinners and other additives.
Operated a variety of power tools such as paint sprayers, rollers and brushes.
Protected adjacent areas from accidental spills or splatters while painting.
Followed instructions given by supervisor regarding specific tasks that need to be performed.
Prepared surfaces for painting by washing, scraping and sanding them.
Used masking tape along edges where two different colors meet while painting trim or moldings.
Repaired cracks in drywall prior to painting it.
Identified surface to be covered and characteristics of finish to properly select roller, power sprayer and right size brush.
Mixed and applied paints, varnishes and sealants to promote lasting finish.
Performed series of surface preparation techniques to maximize paint durability.
Spread undercoats and finish materials using rollers and spray equipment.
Used power and hand tools safely and effectively.
Inspected work sites to measure dimensions, lay out work and estimate materials for each job.
Operated airless spray equipment and motorized lifts.
Chose correct brushes and materials for jobs and purchased from vendors.
Maintained thorough inventory of paint equipment and supplies by checking product levels.
Painted walls and other surfaces using traditional and sprayer methods and worked efficiently to complete jobs within required timeframes.
Recommended blending, harmonizing and contrasting color options to customers.
Documented progress and provided estimated completion time for clients.
Sprayed prepared surfaces with specified amounts of primers and finish coatings.
Smoothed and finished surfaces on walls, trim and cabinetry.
Applied paints, sealers and solvents to plaster, sheetrock, concrete and wood.
Performed repairs to defects in walls by patching holes and scrapes prior at project start.
Readied surfaces and surrounding areas for painting with sandpaper, tape and other materials.
Cleaned and smoothed surfaces prior to painting.
Prepared sheetrock, metal and wood surfaces for painting.
Selected, mixed and applied surface coatings to match and restore interior or exterior surfaces.
Mixed paints and solutions and monitored consistencies.
Cleaned and properly stored paint equipment and supplies at end of each workday.
Primed, smoothed and cleaned trim, walls and ceilings to prepare for painting tasks.
Performed minor plaster repair, blending newly renovated wall surfaces with existing plaster.
Completed high-volume weekly painting jobs with consistently positive customer feedback.
Constructed scaffolding and supports to complete work above ground-level.
Completed diverse repairs on commercial and residential buildings and equipment.
Smoothed surfaces using sandpaper, scrapers or sanding machines.
Filled cracks, holes or joints using caulking guns or putty knives.
Removed old finishes by stripping, sanding or using water or abrasive blasting.
Removed pictures, door knobs or electric switch covers prior to painting.
Mixed and matched paint, stain or varnish with oil or thinning and drying additives to obtain desired colors and consistencies.
Calculated amounts of materials and estimated cost based on surface measurements or work orders.
Monitored paint supplies, placing orders whenever needed and properly and safely disposed of old paint.
Applied primers or sealers to prepare bare wood or metal for finish coats.
Selected and purchased tools or finishes for surfaces to be covered.
Erected scaffolding or swing gates or set up ladders to work above ground level.
Covered floors before prepping, priming and painting walls and ceilings to protect them from chemicals and paint.
Calculated cost and quantities of required materials based on surface measurements or work orders.
Washed and treated surfaces with oil, turpentine or other preparations.
Gil Construction
Zmri gul
Newark , DE
07.2016 - 08.2020
This company was a small company. It was plumbing company so I did a lot of extra excavation and a lot of digging a lot of hard labor work for years I was apprentice for a plumber for three years pretty much all the hard labor work and I learned a lot about plumbing and construction in general.