Summary
Overview
Work History
Skills
Certification
Projects
Roles And Responsibilities
Timeline
Generic

Kiana Terry

Norfolk,VA

Summary

Safety-focused Commissioning Foreman with expertise in electrical testing and renewable energy commissioning. Skilled in interpreting electrical drawings, implementing LOTO procedures, and leading multi-disciplinary teams. Experienced in delivering projects on time and within scope while adhering to OSHA standards and quality assurance protocols.

Overview

12
12
years of professional experience
1
1
Certification

Work History

Commissioning Foreman

Commissioning Foreman
04.2024 - Current
  • Led commissioning efforts for over 300 MW of utility-scale solar energy projects across the Midwest.
  • Supervised team of 10+ commissioning technicians, ensuring compliance with procedures and documentation standards for successful project execution.
  • Coordinated pre-functional and functional testing, system energization, and performance verification in compliance with project specs and safety standards.
  • Collaborated with engineering, construction, and client teams to resolve commissioning issues and streamline turnover.
  • Managed punch list closure and compiled final turnover packages, ensuring timely client acceptance.
  • Supported commissioning activities on renewable energy projects, including utility-scale wind farms and battery storage systems.
  • Developed commissioning plans, ITPs, and test procedures; conducted site inspections and equipment start-ups.
  • Worked directly with OEMs and utility partners during energization and system handover.
  • Created daily progress reports and coordinated commissioning schedules with Primavera P6 to track project milestones.
  • Supported startup and troubleshooting for energized systems; participated in pre-commissioning inspections.

Program Manager (Additional Duties)

United States Navy
Norfolk
02.2021 - 12.2023
  • Coordinated and oversaw complex projects, ensuring adherence to timelines, budgets, and quality standards.
  • Developed project plans, allocated resources, and monitored project progress.
  • Collaborated with cross-functional teams to achieve project objectives.
  • Conducted risk assessments and implemented mitigation strategies.
  • Prepared regular reports and briefings for senior leadership.
  • Successfully managed many projects with a combined value of 100 million dollars.

Construction Electrician

United States Navy
04.2014 - 12.2023
  • Led a team of 8 personnel in the safe and efficient completion of electrical construction and maintenance projects.
  • Installed, repaired, and maintained electrical systems, including wiring, circuits, lighting, and equipment.
  • Conducted routine inspections to ensure compliance with electrical codes and safety regulations.
  • Diagnosed and resolved electrical problems to minimize downtime and ensure mission readiness.
  • Collaborated with engineers and project managers to plan and execute electrical installations on various Navy facilities.
  • Trained and mentored junior electricians in technical skills, safety procedures, and equipment operation.
  • Managed electrical inventory and ensured proper maintenance of tools and equipment.
  • Received multiple commendations for outstanding leadership, dedication, and technical expertise.

Skills

  • Electrical systems
  • Electrical testing
  • Electrical drawing interpretation
  • Troubleshooting techniques
  • Renewable energy systems
  • Safety compliance
  • Risk assessment
  • Project management
  • Team leadership
  • Material handling
  • Problem-solving
  • Attention to detail
  • Client communication

Certification

  • NFPA 70E Arc Flash Safety
  • CPR/First Aid Certified
  • OSHA 30-Hour Construction Safety
  • Lockout/Tagout (LOTO) Qualified

Projects

  • 600 MW Solar Farm – Texas
  • 260 MW Solar Farm/BESS – Wisconsin
  • 300 MW Solar Farm- Arizona
  • 125 MW Solar Farm- Arizona
  • 500 MW Solar Farm/BESS- Arizona

Roles And Responsibilities

  • Review Project Documentation: Thoroughly examine design documents, contract specifications, and utility requirements to understand project.
  • Develop Lock Out/Tag Out (LOTO) Procedures: Assist in creating site-specific LOTO procedures, communicate plans to field personnel, and ensure adherence to safety.
  • Resource Coordination: Collaborate with the Commissioning Principal to plan and allocate resources and equipment.
  • Commissioning Planning: Prepare detailed weekly and daily commissioning work plans, identifying each device and system to be tested, and monitor overall.
  • Supervision and Safety Oversight: Supervise testing activities, ensuring compliance with site risk assessments and daily work plans.

Timeline

Commissioning Foreman

Commissioning Foreman
04.2024 - Current

Program Manager (Additional Duties)

United States Navy
02.2021 - 12.2023

Construction Electrician

United States Navy
04.2014 - 12.2023
Kiana Terry