Seeking a position where my technical training and experience, problem solving abilities, and communication skills will be utilized within the company.
Overview
25
25
years of professional experience
Work History
Regional Sales Manager
FleetGenius LLC
09.2024 - Current
Work closely with a wide range of customers using my background to help ensure customers get the right products for their needs and wants
Director of Engineering
FleetGenius LLC
01.2021 - 09.2024
Managed a small product engineering team
Fully converted team over to 3-D Solidworks from AutoCad and paper sketches
Created and implemented a data management system
Implemented proper revision control process
Create and monitor budget plans
Verify product costs
Verify labor efficiencies
Reduce and control inventory levels
Worked with a team to implement an ERP/MRP system
Created part numbers for all purchased parts, make parts, and assemblies
Created BOM's
Worked on creating routing and material requirements for all parts
Work on product improvements to reduce costs through part consolidation and ease of manufacturing
Create and build prototypes for new products
Production Supervisor
FleetGenius LLC
06.2020 - 01.2021
Manage 40 associates
Keep track of everyone's production points
Manage the department's production schedule
Work on increasing better process flow and throughput
Designer
Altec Industries
01.2016 - 01.2020
Work with other Altec facilities engineering teams, inside and outside sales, and customers to design utility truck beds for service and power companies
Work with suppliers and our materials team to find required products for the truck beds
Participate in rapid continuous improvement events, DFM's, and cost saving events
Production Planner
Altec Industries
01.2009 - 01.2016
Implementation and maintenance of the part distributing processes
Maintain documents that define the rules for distributing time to all piece parts and assemblies through all the different processes they need to go to and through the facility
Set up new process flows as needed
Reduced the time of this process to an average of 1 hour per job
Work side by side with manufacturing engineering to keep accurate time and labor for every process in each department
Fab Staging Line Lead
Altec Industries
01.2008 - 01.2009
Ensured proper staging of parts on appropriate production carts
Work with Fab and Assembly Supervisors to ensure proper WIP was maintained as needed for assembly
Fab Associate
Altec Industries
01.2007 - 01.2008
Ran multiple machines in Fabrication: Plasma, SG, as well as cross trained on Laser, EB, and Press breaks
Ecoat Associate
Altec Industries
01.2007 - 01.2008
Load and unload bodies into Ecoat
Run sample titrations to monitor chemical levels in baths
Run wastewater system and test discharge to ensure met regulated levels
Quality Final Inspection
Galion LLC
01.2000 - 01.2007
Inspection of product between all required machining operations
Coordinate with a government QAR inspector for shipment approvals
Maintain metrology lab
Run titrations to monitor chemical levels in baths