Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Luis Paredes

Raleigh,NC

Summary

Disciplined and focused Civil Engineer driving success for more than 5 years. Accomplished in various construction projects, including Dams, highways, commercial and industrial buildings. Looking to apply a wealth of talent with a great organization that appreciates a strong work ethic and a commitment to excellence.

In the recent years, Detailed Foreman skilled in planning, assigning and directing work tasks. Team-oriented professional with a strong commitment to maintaining safe, clean job sites. Dedicated to quality and clear communication.

Nowadays, a highly skilled bilingual Validation Engineer with comprehensive experience in developing and implementing testing protocols, quality assurance strategies, and validation procedures. Possess strong analytical skills, adept at identifying issues and providing effective solutions to ensure product compliance with industry standards. Demonstrated ability to lead cross-functional teams in executing complex projects, resulting in improved product reliability and efficiency.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Validation Engineer

Fresenius Kabi
Wilson, NC
02.2024 - Current
  • Provided continuous process improvement and preventive and corrective actions to facilitate operational efficiency.
  • Maintained accurate records of all tests performed throughout the entire life cycle of a product or system.
  • Scheduled validation testing with different departments and managers.
  • Developed protocols for validating products against internal and industry standards.
  • Investigated equipment failures, identified causes and initiated methods to resolve such issues.
  • Presented complex technical data in easily understood terms to individuals without engineering backgrounds.
  • Reviewed engineering drawings and specifications for accuracy in validation documentation.
  • Documented entire validation process and recorded all changes.
  • Participated in cross-functional teams to develop validation strategies.
  • Collected samples to validate against parameters using various approved tests.
  • Verified that all systems were functioning according to design parameters through testing and inspection.
  • Compiled summary reports from previous validations to use as reference material for future projects.
  • Collaborated with production team members to help team create and deliver high quality, cutting-edge products.
  • Developed validation protocols for process equipment and systems.
  • Authored and executed qualification protocols for clean utilities, HVAC, and manufacturing processes.
  • Provided technical support in the development of test plans, protocols, reports, SOPs.
  • Led training sessions on best practices for executing validation activities.
  • Contributed innovative ideas and solutions to enhance team performance and outcomes.
  • Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.

Sheet Metal Foreman

SE&M Constructors
Elm City, NC
10.2020 - 01.2024
  • Monitored processes for continuous improvement and implemented changes to promote quicker task completion.
  • Planned material and equipment needs to drive on-time delivery in concert with project schedule.
  • Managed sites by focusing on safety, operations and productivity.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Established expectations and motivated crews to consistently meet or beat goals.
  • Communicated with employees to demonstrate high standards and mitigate issues.
  • Planned and managed manpower and resource requirements to support project activities.
  • Monitored job site parts and equipment.
  • Managed workers at various experience levels in construction and restoration projects.
  • Checked project details to verify job site materials and equipment.
  • Conferred with senior management, owners, contractors and design professionals to discuss project goals and problem solve.
  • Complied with federal and company regulations to maintain high level of job site safety.
  • Inspected rigging and scaffolding for safety and reliability.
  • Rolled out new processes to achieve operational excellence.
  • Implemented budgets to support equipment and workforce requirements and successfully complete projects.

Sheet Metal Mechanic

P&H Mechanical Solutions
Burlington, NC
05.2020 - 09.2020
  • Fabricated and adjusted component parts with shop and on-site tools.
  • Built and installed complete systems according to standards and customer specifications.
  • Troubleshot problems with components to identify root causes of failures.
  • Aligned and balanced overall structures and component parts by using precision instruments.
  • Fabricated and altered parts with metal hammers, punches, drills and shears.
  • Interpreted blueprints and schematics to determine duct placement.
  • Demonstrated leadership by making improvements to work processes and helping to train others.

Sheet Metal Mechanic

GAB Labor solutions LLC
Wilson, NC
05.2019 - 04.2020
  • Fabricated and adjusted component parts with shop and on-site tools.
  • Aligned and balanced overall structures and component parts by using precision instruments.
  • Troubleshot problems with components to identify root causes of failures.
  • Modified standard designs to fit customers' unique needs.
  • Built and installed complete systems according to standards and customer specifications.
  • Interpreted blueprints and schematics to determine duct placement.

Sheet Metal Mechanic

All Around HVAC.
Houston, TX
03.2019 - 05.2019
  • Built and installed complete systems according standards and customer specifications.
  • Fabricated and altered parts with metal hammers, punches, drills and shears.
  • Troubleshot problems with components to identify root causes of failures.
  • Interpreted blueprints and schematics to determine duct placement.
  • Achieved maximum efficiency by working with large crews to install ductwork in existing and new builds.
  • Verified product quality by checking products for accuracy and completing necessary adjustments.

Bussines Manager

Global Sumiservis, C.A
Puerto Ordaz (VENEZUELA), Bolivar (VENEZUELA)
12.2013 - 12.2018
  • Greeted and encouraged feedback from customers to implement in-store operational changes.
  • Monitored supplier operations to verify quality, delivery schedule and conformance to contract specifications.
  • Collaborated with staff to maximize customer satisfaction, streamline procedures and improve bottom-line profitability.
  • Evaluated store performance by receiving, analyzing and incorporating feedback from store inspections to implement action plans for improvements.
  • Recruited and hired qualified candidates to fill open positions.
  • Trained employees on additional job positions to maintain coverage of roles at all times.
  • Facilitated exceptional sales and performance results by focusing on continuous improvement approaches and capitalizing on emerging market opportunities.
  • Opened and closed store by processing daily paperwork, balancing register drawers, producing staffing schedules and preparing deposits.

Assistant Civil Engineer

Odebrecht Venezuela
Puerto Ordaz (Venezuela), Bolivar (Venezuela)
02.2007 - 06.2012
  • Wrote technical reports documenting project progress and specifications.
  • Investigated project sites to determine suitability and viability for expansion or repurposing.
  • Drafted and submitted engineering change orders for review to enhance projects.
  • Organized engineering and construction plans.
  • Maintained project materials, including blueprints, schematics and specifications.
  • Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
  • Interpreted blueprints, schematics, and manuals.
  • Conducted onsite inspections and prepared takeoffs for engineering project costing.
  • Attended meetings and site locations to gather data for project work.
  • Computed loads and material stresses to determine optimal design specifications for foundations and bridge spans.
  • Conducted comprehensive inspections of precast structures and underground services.
  • Resolved conflicts between clients, team members and management in constructive and positive manner.
  • Created all construction schedules and detailed equipment and labor requirements in project instructions.
  • Measured load and grade specifications along with material stress factors, which enabled appropriate design conditions.
  • Estimated quantities and costs of all project materials for owner review.
  • Surveyed sites, collected measurements and assessed project conditions.
  • Composed various project proposals, including project specifications, cost estimates and schedules.
  • Aided other departments in development of plans and cost estimates on road, parking lot and drainage projects.
  • Prepared standard engineering computations, surveys and designs.
  • Delivered consistent support for document controls while reviewing, assessing and providing comments on contract documentation.

Education

Civil Engineer Degree - Civil Engineering

Universidad Gran Mariscal De Ayacucho
Puerto Ordaz, Bolivar - Venezuela
01.2019

Skills

  • Blueprint understanding
  • Job Planning
  • Workplace Safety
  • Problem-Solving
  • Teamwork and Collaboration
  • Schematics and Blueprints
  • Construction Management
  • Safety Procedures
  • Quality Control
  • Dedicated Work Ethic
  • OSHA Safety Requirements
  • Analytical and Critical Thinking
  • Spanish and English Fluency
  • Validation protocols
  • Process improvement
  • Cross-functional collaboration
  • Technical documentation
  • Equipment troubleshooting
  • Regulatory compliance
  • Test planning
  • Data analysis
  • Project management
  • Quality assurance
  • Root cause analysis
  • Effective communication
  • Team building
  • Problem-solving aptitude
  • Adaptability and flexibility
  • Multitasking Abilities
  • Team collaboration
  • Operations management
  • Analytical thinking
  • Data interpretation
  • Cross-functional team collaboration
  • Excellent communication
  • Decision-making

Certification

  • OSHA 30-Hour Construction Safety and Health November 2022
  • OSHA 10-Hour Construction Safety Awareness June 2019
  • EPA 608 Universal Certifications February 2021
  • Safe Handling of R-410A Certification February 2021
  • Power-Actuated Tools March 2021
  • Rigger and Signal Person (Hand and Radio) Qualification June 2022
  • Adult First AID / CPR AED May 2022
  • Lockout/Tagout March 23
  • Fire Extinguisher March 23

Timeline

Validation Engineer

Fresenius Kabi
02.2024 - Current

Sheet Metal Foreman

SE&M Constructors
10.2020 - 01.2024

Sheet Metal Mechanic

P&H Mechanical Solutions
05.2020 - 09.2020

Sheet Metal Mechanic

GAB Labor solutions LLC
05.2019 - 04.2020

Sheet Metal Mechanic

All Around HVAC.
03.2019 - 05.2019

Bussines Manager

Global Sumiservis, C.A
12.2013 - 12.2018

Assistant Civil Engineer

Odebrecht Venezuela
02.2007 - 06.2012

Civil Engineer Degree - Civil Engineering

Universidad Gran Mariscal De Ayacucho