Develop and design transmission line systems (12.47kV to 69kV), including layout, routing, and specifications to ensure efficiency and compliance with industry standards using PLS-CADD and AutoCAD.
Conduct field surveys and assessments to determine optimal locations for new transmission lines, considering environmental and regulatory factors.
Perform structural, wire, galloping, and other various analysis to ensure stability and reliability of transmission systems.
Collaboration with cross-functional teams, including project managers and clients to facilitate project execution.
Ensure all designs and operations comply with local, state, and federal regulations, as well as industry standards (e.g., NESC, IEEE).
Prepare comprehensive technical reports, detailed documentation, and professional presentations to effectively communicate project status and findings to clients.
Manufacturing Engineer
The Raymond Corporation
06.2022 - 12.2022
Assisted in the development, planning, testing, and modification of manufacturing processes and systems within a Toyota Production System (TPS) environment
Collected data and developed information to establish or improve manufacturing processes and procedures
Analyzed data to determine machine and process capacity, worker utilization, and process capability
Participated in interdepartmental teams to specify, design, develop, and apply manufacturing aids for improved ergonomics and increased efficiency
Provided regular work updates to Lead Engineers and the department supervisor/manager
Construction Internship
Zaepfel Development Co Inc
05.2020 - 08.2020
Assisted in various aspects of commercial and residential construction projects including demolition, planning and constructing wall and door frames, and installation of drywall
Participated in coordination of 330,000 square foot warehouse clearance; including logistical planning to assure time and cost efficiency of process
Assisted in planning and completion of materials recycling process to create a more environmentally-friendly work environment
Utilized industrial equipment to ensure optimum efficiency
Robotics, Created a 120lb weight class robot for battle bots. Used AutoCAD, Solid Works and various machinery to create robot. My primary objective in the group was to create the shell of the robot to withstand impacts from opponents.
Electric Longboard, Created a custom electric longboard for personal use. Designed battery enclosure and battery pack to fit the constraints of selected longboard.
GRB Newman Designs Canoe Paddle Analysis, Conducted research on different styles of canoe paddles to determine which paddle is more effective. Altair SimLab was used to calculate drag coefficients.
Leadership Experience
President, Clarkson University's Ski Club, Lead the club in creating and running events. Developed inclusive budgeting plan to enable participation in activities and trips for all members. Senior Year
Vice-President, Clarkson University's Ski Club, Assisted President of club in planning and executing events and fundraisers. Junior Year
Gas Reimbursement Manager, Ski Club, Managed disbursement of reimbursal for student drivers. Worked at different events held by the ski club. Sophomore Year