Develop and design transmission line systems (12.47kV to 69kV), including layout, routing, and specifications to ensure efficiency and compliance with industry standards using PLS-CADD and AutoCAD.
Perform structural, wire, galloping, and other various analysis to ensure stability and reliability of transmission systems.
Collaboration with cross-functional teams, including project managers and clients to facilitate project execution.
Ensure all designs and operations comply with local, state, and federal regulations, as well as industry standards (e.g., NESC, IEEE).
Prepare comprehensive technical reports, detailed documentation, and professional presentations to effectively communicate project status and findings to clients.
Manufacturing Engineer CO-OP
The Raymond Corporation
06.2022 - 12.2022
Assisted in the development, planning, testing, and modification of manufacturing processes and systems within a Toyota Production System (TPS) environment.
Collected data and developed information to establish or improve manufacturing processes and procedures.
Analyzed data to determine machine and process capacity, worker utilization, and process capability.
Participated in interdepartmental teams to specify, design, develop, and apply manufacturing aids for improved ergonomics and increased efficiency.
Construction Internship
Zaepfel Development Co Inc
05.2020 - 08.2020
Assisted in various aspects of commercial and residential construction projects including demolition, planning and constructing wall and door frames, and installation of drywall.
Participated in coordination of 330,000 square foot warehouse clearance; including logistical planning to assure time and cost efficiency of process.
Assisted in planning and completion of materials recycling process to create a more environmentally-friendly work environment.
Education
Bachelor's Degree - Mechanical Engineering
Clarkson University
12-2023
Skills
PLS-CADD
PLS-POLE
PLS-TOWER
Auto-CAD
Solid Works
MatLab
Project Management
Creo Parametric
Project Highlights
69kV Transmission line for Versant Power. Project involved the design of 4.2 miles of new line to replace existing line. Modeled to support existing conductors and new conductors.
46kV Transmission line for Twin Rivers Paper. Project involved the design of 1.2 miles of new line to replace an aging line.
Personal Project: Electric Longboard, Created a custom electric longboard for personal use. Designed battery enclosure and battery pack to fit the constraints of selected longboard.
GRB Newman Designs Canoe Paddle Analysis, Conducted research on different styles of canoe paddles to determine which paddle is more effective. Altair SimLab was used to calculate drag coefficients.