Summary
Overview
Work History
Education
Skills
Timeline
Generic

Marc Kehus

Staunton,VA

Summary

With a proven track record at Cleveland Cement Contractors Inc., I excel in leading sanitation practices and constructing durable concrete structures. Renowned for troubleshooting abilities and adept use of forklifts, my contributions have significantly enhanced project quality and efficiency. My expertise in delegating work and multitasking ensures high standards in both cleanliness and construction projects.

Overview

15
15
years of professional experience

Work History

Sanitation Lead Man

Doc
04.2018 - 01.2024
  • Led training in sanitation and cleaning practices.
  • Developed a strong understanding of company-specific requirements and standards for sanitation, leading to consistently high-quality results.
  • Increased team efficiency by providing training on proper sanitation practices to all staff members.
  • Played an integral role in passing industry inspections by maintaining rigorous sanitation standards throughout the facility.
  • Facilitated communication between the sanitation department and management teams on matters relating to hygiene or safety concerns affecting daily operations within the facility.

Rod Buster

Wwr Placment
04.2014 - 05.2016
  • Secured rebar using tie wire, increasing structural integrity of reinforced concrete structures.
  • Improved job site communication through effective collaboration with coworkers, engineers, and supervisors.
  • Conducted regular inspections of installed rebar to identify and address any issues before concrete pourings.
  • Laid out foundations accurately using measuring tapes and levels prior to beginning reinforcing work.
  • Operated various machinery such as power benders, cutting torches, and cranes for efficient construction processes.
  • Assisted in pouring concrete, ensuring proper coverage around rebar for optimal reinforcement.
  • Demonstrated adaptability by working on diverse construction projects such as bridges, tunnels, highways, buildings.
  • Installed steel cables to reinforce structures before tightening and reinforcing.

Form Carpenter

Cleveland Cement Contractors Inc.
10.2012 - 03.2014
  • Assisted in training new employees on proper use of tools and techniques, contributing to an efficient and knowledgeable workforce.
  • Increased efficiency on job sites by consistently meeting project deadlines and maintaining a clean, organized worksite.
  • Enhanced overall project quality by diligently following blueprints and ensuring precise measurements for accurate formwork construction.
  • Provided valuable input during pre-construction planning phases, offering expertise in estimating material requirements and labor costs for accurate project proposals.
  • Constructed durable formwork systems for various concrete structures including walls, columns, beams, stairs, and slabs, resulting in long-lasting builds.
  • Demonstrated versatility by adapting to new materials and methods for formwork construction as the industry evolved over time.
  • Coordinated movement of materials and equipment to job sites.
  • Safely operated electric cordless and hammer drills and cutting torches.
  • Operated forklifts and other heavy equipment.

Form Carpenter

English Const
01.2010 - 10.2011

project wastewater treatment plant .I have worked on at lest 5 of them

  • Constructed durable formwork systems for various concrete structures including walls, columns, beams, stairs, and slabs, resulting in long-lasting builds.
  • Ensured structural stability by following engineering specifications for reinforcement placement in concrete forms, contributing to high-quality building projects.
  • Earned recognition from supervisors for exceptional problem-solving abilities when faced with unexpected challenges during formwork construction.

Ironworker

Supper Erectors
09.2008 - 09.2009
  • Expedited construction timelines by effectively operating heavy equipment, such as cranes and forklifts.
  • Provided reliable support during rigging operations to ensure the safe lifting of heavy steel beams into place.
  • Placed and fastened iron rods and steel mesh together using wire and spot welds.
  • Maneuvered and positioned support structures before and after pouring concrete, often manipulating iron by cutting, welding, or bending.

Education

GED -

Yosemite High
Merced, CA
04-1978

Skills

  • Cleaning Protocols
  • Troubleshooting abilities
  • Custodial services skills
  • Delegating Work Assignments
  • Waste disposal
  • Chemical Handling
  • Operating lifts
  • Trash Collection
  • Sanitation expertise
  • Forklift use
  • Multitasking Abilities

Timeline

Sanitation Lead Man

Doc
04.2018 - 01.2024

Rod Buster

Wwr Placment
04.2014 - 05.2016

Form Carpenter

Cleveland Cement Contractors Inc.
10.2012 - 03.2014

Form Carpenter

English Const
01.2010 - 10.2011

Ironworker

Supper Erectors
09.2008 - 09.2009

GED -

Yosemite High
Marc Kehus