Summary
Overview
Work History
Education
Skills
Additional Information
Languages
Timeline
Generic

Mark Pleffner

Pembroke Pines,Florida

Summary

In my 36 years I have obtained skills pertaining to building from concept to construction, as an intricate part of the BIM design team, Pre-con, Value engineering, design build, to conventional construction. I have been a part of this for high end clients. Hands on I have learned from some of the industries smartest electricians, and businessmen combined I learned the Art of running work. Everything we do has its own art form. Taught the Skill of controls has helped me in processing and resolving problems in the field and personnel keeping the project moving in the right direction. Understanding how to properly cycle your Labor, Load to peak as the project does and unload as it winds to a close. Managing materials, and equipment complimenting the your crew structure's needs, without overloading the project, combined with having the right information available for the foreman and their crews.

Overview

32
32
years of professional experience

Work History

General Foreman

FISK ELECTRIC COMPANY
05.2023 - Current
  • General Foreman at the BLOCK G county apartment facility 40 story building.
  • University Of Miami Health Cancer research Center, 12 story new construction.

General Foreman

Tri-City Electric Co., Inc.
08.2012 - 05.2023
  • My primary function is to mitigate problems and give directives that efficiently build buildings, substations, & or roadway systems mostly in the health care industry, pari-mutuel's, Arenas, Stadiums, utilities & mass transit
  • My Responsibilities entailed in several projects along the way
  • Miami Dolphins new Training Camp throughout the pandemic opening on time, UM Knight recital Hall, Miami Metro Mover New Fiber Back bone from the 111 building throughout down town Miami installing new equipment at every station house installing new pathways from mover rail to station houses, and surveillance systems at every Platform, Miami Cancer Institute for Baptist Health CEP & Proton building, Port of Miami we relocated the existing FPL, and Communication infrastructure and roadways to allow the new Royal Caribbean Cruise terminal to be built including entrance and roadway
  • Jackson Health Systems Main Campus installed new infrastructure while keeping the facility on-line new 4,160-volt cabling form building to building & submersible gear tied to existing buildings Equipment, also re arranged existing infrastructure to allow the demolition of the rehabilitation buildings, CEP expansion for Baptist Health West Kendal
  • All Medium Voltage Emergency service and repairs for all Health Care, Pari-Mutuel's, & Private client systems.

Qualifier, Managing Member

Paramount Group Enterprises LLC.
11.2005 - 08.2012
  • I ran the office including the estimating, payroll, and day to day operation
  • We built custom homes for the Seminole Tribe, Boys & Girls club and miscellaneous
  • Relocation of infrastructure for the new cancer building Joe DiMaggio Memorial health
  • We installed all new street lighting on 35th avenue from Johnson street to Taft street & Park Road, and FPL underground conduit systems removing overhead lines for new bridge, Also installed new Traffic signal master communication from Park Rd to 35th avenue on Johnson street
  • Marlins Ballpark Sports lighting package and operating systems for lighting, The Clevelander Bar Pool and associated equipment, Optical Fiber for the Satellite equipment
  • AT&T Equipment services, directional bore and install conduit and metering equipment
  • Miscellaneous construction contracts and services, Sage Mont Upper school Auditorium, Miami Gardens Business center, Boca Raton office buildouts, City of Opa-locka CDC Housing.

Qualifier

Florida Power Specialist
01.2006 - 01.2008

Supervised field operations

General Foreman

Tri-City Electric Co., Inc.
10.1998 - 11.2005
  • Discovery Channel headquarters, Super Bowl XXXIII temporary show power & festivities buildout, Joe Robby Stadium remodel 100 level & Suite Level, American Airlines Arena Signs and Sound System rapid defrost for ice floor and Party suites re-work, Rick case Honda Dealership, Pro Player Stadium new sound system, Palm meadows Thoroughbred training center in Boynton Beach Fl
  • Complete infrastructure and 40 stables 3 ancillary buildings 3- dorm buildings from Fire Alarm to communications 25 KV medium voltage system, 5 story tilt building, Gulfstream Race Park full demo and remodel while maintaining a temporary facility for the races during construction, Miami Dolphins Training Facility new gear generators and covered field 'The Bubble'.

Journeyman

Phase Masters
01.1998 - 10.1998
  • Built pump/ lift station 5 pumps controls and power, reworked main original bus duct, built all new main electric room for the Harbor House

General foreman

Bennett Electric/ Besco Utilities
04.1992 - 01.1998
  • Industrial construction in manufacturing plants and Utility infrastructure underground and pole installations, sports lighting systems
  • Barry University, new science labs, new baseball sports lighting system, all maintenance
  • Baxter Medical Manufacturing buildouts to maintenance
  • City of Miami Parks and recreation new park lighting systems and ancillary buildings multiple parks
  • North West Christian Academy Sports Complex Baseball & Football
  • Movie Co., Pompano and Pembroke Pines/Davie Infrastructure for the movie house and shopping centers and site lighting
  • Pepsi Co
  • Energy management systems and new area lighting in all south Fl Subsidiaries KFC, TACO BELL, PIZZA HUT
  • Service on private and public buildings.

Education

MasterElectrician - Electrician

NJATC Local Union 349
Miami, FL

Skills

  • 36 years in the industry, I have truly been blessed to work with brilliant men who taught me a great living State of Florida Unlimited Electrical Master, Certified EV charger installation, Level 3 traffic signal Tech, Traffic signal Bench certified, medium voltage splicer, Osha 30, LOTO certified, Six Sigma, IBEW Journeyman Wireman Local Union Miami 349

Additional Information

In my years they're so many other amazing facilities I have had the pleasure of building, remodeling, or repairing along the way. From an apprentice to journeyman, all the way to achieving my unlimited electrical masters, learning some Six sigma to the Traffic signal certifications, the most amazing thing is I am still learning daily, and that is exciting and humbling.

Languages

Spanish
Limited Working

Timeline

General Foreman

FISK ELECTRIC COMPANY
05.2023 - Current

General Foreman

Tri-City Electric Co., Inc.
08.2012 - 05.2023

Qualifier

Florida Power Specialist
01.2006 - 01.2008

Qualifier, Managing Member

Paramount Group Enterprises LLC.
11.2005 - 08.2012

General Foreman

Tri-City Electric Co., Inc.
10.1998 - 11.2005

Journeyman

Phase Masters
01.1998 - 10.1998

General foreman

Bennett Electric/ Besco Utilities
04.1992 - 01.1998

MasterElectrician - Electrician

NJATC Local Union 349
Mark Pleffner