Summary
Overview
Work History
Education
Skills
Proven Work Skills
References
Timeline
Generic

Mark Stewart

Coeur D’Alene

Summary

Talented Superintendent offering 20+ years of experience supporting construction aspects of infrastructure projects. Successful at overseeing communication and operations between teams, vendors and design professionals. Focused on keeping projects on time and under budget using time management and prioritization skills.

Overview

19
19
years of professional experience

Work History

General Superintendent

Bechtel
01.2019 - 01.2021
  • In charge of cast-in-place and pre-cast full span methods and overseeing cast in place balance cantilever form traveler construction of new 200-meter cable stay bridge
  • Responsible for overseeing erection of full span precast segments with SPMT’s, cast-in place full spans and casting and advancing form travelers, sub structure and at-grade earthworks as well as sub structure temporary earthworks, Davies and Churchill station and South Portal Utility Complex construction
  • Oversaw installation of superstructure reinforcement and post tensioning materials
  • Overall project includes 30 pre-cast full spans, 14 cast-in-place full spans, 40 cast-in-place balance cantilever segments, 13 kilometers of rail, 11 stops and 2 stations.

Superintendent

Bechtel
01.2016 - 01.2018
  • In charge of cast-in-place balanced cantilever segmental box girder construction, launching gantries for pre-cast span by span segments and mobile lifters for pre-cast balanced cantilever construction
  • Responsible for overseeing assembly, erection, casting and advancing form traveler, launching gantries and mobile lifters for construction of cast in place and pre-cast superstructure
  • Oversaw installation of substructure and at-grade earthworks, superstructure/substructure reinforcement and post tensioning materials
  • Overall project includes over 6,700 precast segments, 63 kilometers of rail and 35 stations for line 1 and line 2.

Superintendent

Ames Construction, Inc.
01.2013 - 01.2016
  • In charge of cast-in-place balanced cantilever segmental box girder construction
  • Responsible for overseeing assembly, erection, casting and advancing form travelers for construction of balanced cantilever cast-in-place box girder superstructure
  • Oversaw installation of sub structure and at- grade earthworks for both east and west approaches, superstructure reinforcement and post tensioning materials
  • Overall project includes construction of two new 2,600 ft
  • Long bridges spanning the Mississippi River
  • Bridges include multiple units consisting of cast-in-place balanced cantilever, cast-in-place on falsework and pre-stressed girder spans.

Traveler Foreman

Tutor-Saliba Corporation
01.2012 - 01.2013
  • Supervising construction of a new 5 span, 1,900 ft
  • Long cast-in-place box girder bridge over the Sacramento River arm of Shasta Lake
  • Responsible for assembly, erection, casting and advancing of form travelers for construction of balanced cantilever cast-in-place box girder superstructure
  • Oversaw installation of superstructure reinforcement and post tensioning materials
  • Unique challenges included maintaining geometry control for superstructure constructed on a 1-mile radius with a 4% cross slope and a 6% profile grade.

Carpenter Foreman

Walsh Construction Company/PCL Joint Venture
01.2011 - 01.2012
  • During construction of a new 1,000 ft
  • Long three span extradosed cast-in-place box girder main channel crossing over the Quinnipiac River
  • Responsible for installation and removal of pier table falsework, pier table construction and assembly, erection, daily operations and removal of form travelers
  • Form traveler configuration included a 105-ft
  • Wide cantilevered four horse, five cell arrangement.

Carpenter Foreman

Obayashi/PSM Joint Venture
01.2005 - 01.2011
  • During construction of 1,900 ft
  • Long open spandrel concrete arch bridge over the Colorado River
  • Responsible for construction of footing, substructure, arch skewback and starter segments
  • Supervised assembly, erection, casting, launching and removal of form travelers for cast-in-place cantilever arch construction
  • Temporary construction support for the cast-in-place arch consisted of a full cable stay bridge with two sets of temporary towers.

Carpenter Foreman

Washington Group
01.2003 - 01.2005
  • During the construction of the Interstate 11/Interstate 515/US93/US95 interchange in Henderson Nevada
  • Responsible for various areas of the project including cast in place concrete, erection of falsework, setting up Bidwell, erecting MSE walls and construction of retaining and sound walls.

Carpenter Foreman

Granite Construction
01.2002 - 01.2003
  • In charge of Station’s concrete
  • Responsible for all concrete at the Sahara, Hilton, Las Vegas Convention Center and MGM Grand stations.

Education

Apprenticeship
01.1996

Redmond High School
01.1988

Skills

  • Quality Assurance
  • Labor Management
  • Construction Supervision
  • Training and Development
  • Cost Estimation
  • Schedule Management
  • Blueprint Reading
  • Infrastructure Planning
  • Environmental Compliance
  • Key Decision Making

Proven Work Skills

  • Scheduling Manpower with employer
  • Scheduling materials for delivery
  • Project planning
  • Payroll, Timesheets, Payroll distribution
  • Safety-Run daily/weekly meetings and keep record for file
  • Hire/Fire, Determine Manpower Needs, Evaluate Performance and Terminations
  • Customer Relations and Change Order Documentation
  • Manage work to meet Production Goals
  • Cost Control, Tracking of LB/MH daily and Monthly Consumable Costs
  • Small Tool and Equipment Management, Responsible for Inventory and Condition of Rigging and Company Tools and Trucks
  • Technical Understanding of the work
  • Integrated Shop Drawings
  • Industry Standards
  • ACI. Placement Tolerances
  • FHWA/AASHTO Construction Specifications
  • ASBI. Segmental Bridge Construction Practices
  • PTI. Installation Methods
  • Safety Training
  • OSHA 30 Hour Training
  • Subpart R Training
  • Forklift Operator /Competent Person Training
  • Personal Man Lift Certification
  • CPR Certified
  • High Line Rescue Training
  • Scaffold Certified

References

Available upon request

Timeline

General Superintendent

Bechtel
01.2019 - 01.2021

Superintendent

Bechtel
01.2016 - 01.2018

Superintendent

Ames Construction, Inc.
01.2013 - 01.2016

Traveler Foreman

Tutor-Saliba Corporation
01.2012 - 01.2013

Carpenter Foreman

Walsh Construction Company/PCL Joint Venture
01.2011 - 01.2012

Carpenter Foreman

Obayashi/PSM Joint Venture
01.2005 - 01.2011

Carpenter Foreman

Washington Group
01.2003 - 01.2005

Carpenter Foreman

Granite Construction
01.2002 - 01.2003

Apprenticeship

Redmond High School
Mark Stewart