Pipe Fitter Helper/ Welder Helper
TKS
Tesla Austin TX
04.2024 - Current
Measured, cut, threaded and assembled new pipe to place assembled pipe in hangers or other supports.
Improved pipefitting efficiency by assisting in the assembly, installation, and maintenance of piping systems.
Followed safe work practices, which included fall protection and personal protective equipment.
Enhanced safety measures by following proper procedures when handling hazardous materials during pipe installations.
Collaborated with experienced pipefitters to learn advanced techniques and improve personal skills in the field.
Tested piping systems for leaks by increasing pressure in pipes and observing gauges attached to pipes for indication of leaks.
Facilitated effective communication between team members, contributing to successful project outcomes.
Mounted brackets and hangers on walls and ceilings to hold pipes in place.
Streamlined workflow by maintaining a clean work environment and ensuring all tools were properly stored after use.
Contributed to timely project completion through efficient cutting, threading, and hammering of pipes as per specifications.
Maintained high standards in workmanship, resulting in consistently positive feedback from supervisors and clients.
Demonstrated versatility in skill set by adapting to different types of pipe materials such as steel, plastic, copper, amongst others while assisting on various projects.
Ensured proper alignment of pipes through precise leveling and positioning during installation processes.
Supported seamless construction projects by preparing and organizing tools and materials for pipefitters.
Assisted in accurate measurements and marking of pipes for cutting or threading using various measuring instruments.
Reduced material waste by accurately calculating required lengths of pipes before cutting them.
Increased productivity with careful attention to detail during the assembly of piping components.
Aided in the prevention of leaks or other complications through thorough inspection of installed piping systems before final approval from supervisors.
Installed valves, hangers, supports, and flanges inside piping systems.
Selected type and size of piping required for each project.
Ran stainless, aluminum, steel and PVC piping.
Assisted in troubleshooting issues encountered during the installation process, applying problem-solving skills to resolve challenges promptly.
Threaded pipes using piping machines.
Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
Fabricated, assembled, installed and maintained piping systems.
Coordinated movement of materials and equipment to job sites.
Reduced downtime with timely repair and replacement of damaged or worn-out pipes, valves, and fittings.
Removed trash and excess materials to clean up work areas.
Fetched materials, equipment, and tools for welding professionals.
Supported welders with precise measurements, cutting, and fitting of metal components for accurate assembly.
Chipped off excess weld, slag, and spatter using hand tools.
Kept positive attitude focused on learning new processes and techniques.
Ensured high-quality welds through pre-weld joint preparation, including cleaning surfaces and removing debris.
Demonstrated adaptability by quickly learning new processes, techniques, or equipment as required for different projects or assignments.
Field Safety Technician
WCR Energy
ExxonMobil Baytown, TX
12.2023 - 04.2024
Improved workplace safety by conducting regular inspections and identifying potential hazards.
Worked closely with Human Resources to ensure new hires received proper orientation on company safety policies.
Maintained detailed records of all safety-related activities, ensuring documentation was readily available when needed.
Evaluated new/ used tools and or harnesses for their potential impact on worker safety before implementation.
Collaborated with management to develop effective safety policies and procedures for the company.
Regularly reviewed equipment maintenance logs to ensure that all machinery was functioning safely and efficiently.
Examined credentials, licenses and permits for compliance with licensing requirements.
Monitored safety and assessed risk levels and mitigation strategies at jobsite.
Updated contract, project and crew leaders with daily status reports on observations and incidents.
Directed recordkeeping and paperwork preparation in line with OSHA requirements.
Morning meetings with all employees.
Making sure everyone had the proper ppe if not we'll handed to them.
Scaffold Builder
WCR Energy
ExxonMobil Baytown, TX
05.2023 - 04.2024
Adhered to strict quality control standards, guaranteeing the reliability and stability of built scaffolding structures.
Displayed strong physical stamina, consistently fulfilling demanding labor requirements throughout long workdays onsite.
Fill out JSA with all my crew.
Scope work area, for potential hazards.
Scope work area to analyze new, demo or modify any existing scaffolds.
Make sure we are 100% tie off to proper anchor points.
Make sure I use proper tools to perform any job.
Make sure to use proper communication with coworkers to get a better understanding of procedure, and work more effectively.
Participated in regular safety meetings, contributing to ongoing improvement efforts for job site practices.
Displayed adaptability when faced with inclement weather or other delays, adjusting schedules as necessary without compromising quality or safety standards.
Assembled, erected and dismantled scaffolding structures to meet project needs.
Worked in team-focused environment to collaboratively complete projects on time.
Verified all scaffolding materials were stored safely and securely.
Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
Followed OSHA regulations and safety standards when installing and working with scaffolding.
Safely installed and dismantled scaffolding.
Pass down/up material hand to hand, making a chain line to make sure material gets to proper person or scaffold rack.
Handling material properly.
Make sure to have proper work permit for proper work area.
Having to open permit before each job is performed and make sure the permit was closed when shift ended.
Tightening/ loosening all material with proper tools.
Maintained a clean work environment, organizing materials and tools for efficient scaffold construction.
Supported coworkers during scaffold assembly, providing necessary assistance to guarantee project success.
Followed strict safety protocols while working at heights, minimizing risk of accidents on the job site.
Reduced project completion time by quickly adapting to different types of scaffolding systems and setups.
Utilized problem-solving skills to address challenges encountered during scaffold assembly or disassembly processes effectively.
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Assisted with tying off and securing scaffolding to building structures to optimize safety.
Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
Built custom scaffolding structures to specifications for diverse needs.
Inspected scaffolding for safety and structural integrity before each use.
Repaired and replaced broken or worn-out wooden components in buildings.
Assisted in loading and unloading scaffolding materials, ensuring proper transportation to and from job sites.
Collaborated with team members to efficiently dismantle scaffolding when projects were completed.
Planned each job with appropriate safety measures, addressing weight limits and fall protection.
Facilitated clear communication among team members, resulting in improved coordination and efficiency during scaffold assembly.
Inspected scaffold erections for condition and compliance with standards.
Maintained accurate inventory of materials, ensuring timely delivery to job sites and minimizing downtime.
Scaffold Builder /Field Safety Technician
Brand Safway Solutions
Exxon Mobile (Baytown)
03.2021 - 05.2023
Adhered to strict quality control standards, guaranteeing the reliability and stability of built scaffolding structures.
Displayed strong physical stamina, consistently fulfilling demanding labor requirements throughout long workdays onsite.
Enhanced job site safety by assembling and dismantling safe, secure scaffolding structures.
Reduced workplace accidents with proper inspection and maintenance of scaffold components.
Improved team productivity through effective collaboration and clear communication with coworkers and supervisors.
Carried materials and equipment weighing up to [Number] pounds onto job sites in various climates and weather conditions.
Participated in regular safety meetings, contributing to ongoing improvement efforts for job site practices.
Maintained compliance with OSHA regulations, ensuring a safe work environment for all personnel onsite.
Contributed to cost savings initiatives by identifying opportunities for material reuse or recycling whenever possible.
Increased overall project efficiency by managing inventory levels of scaffold materials and components accurately.
Displayed adaptability when faced with inclement weather or other delays, adjusting schedules as necessary without compromising quality or safety standards.
Erected scaffolding for [Number] jobs from [Type] projects to [Type].
Assembled, erected and dismantled scaffolding structures to meet project needs.
Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
Followed OSHA regulations and safety standards when installing and working with scaffolding.
Inspected scaffolding for safety and structural integrity before each use.
Trained new employees on proper safety procedures for working on scaffolding.
Managed inventory of tools, supplies and equipment.
Shaped or cut materials to specified measurements using hand tools, machines and power saws.
Demonstrated adaptability in responding to varied work conditions including extreme heights or tight spaces while maintaining high performance standards.
Verified all scaffolding materials were stored safely and securely.
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Pass down material hand to hand, down a chain line, making sure all material is stack properly into scaffold racks.
Properly handle material.
Improved workplace safety by conducting regular inspections and identifying potential hazards.
Maintained detailed records of all safety-related activities, ensuring documentation was readily available when needed.
Ensured compliance with OSHA regulations by conducting thorough audits of work sites.
Provided ongoing support and guidance to employees, fostering a culture of safety awareness and prevention.
Identified workforce safety violations and issued violations to maintain integrity of safety program.
Reduced incident rates by implementing comprehensive safety training programs for employees.
Scaffold Carpenter
Brock Industrial
ExxonMobil Beaumont, Tx
11.2020 - 03.2021
Identify safety risks and precautions required to eliminate those.
Make a detailed list of materials required to complete scaffolding.
Use all required PPE.
Discuss and fill out JSA (Job Safety Analysis) with the crew.
Good communication with coworkers.
Assemble and fasten material together to metal frame work using proper tools.
Performed various cleanup activities
Sign and receive permits from operators
Always using safety guidelines
Looking out for coworkers.
Putting harnesses the correct way, always making sure me and colleagues are 100% tied off to proper anchor points.
Cutting wood (plywood, 2x4’s) making sure always using proper tools.
When putting or nailing wood, always re-check that everything is correct.
Passing up/down material (hand to hand)
Closing permits daily and on time.
Promoted a strong teamwork environment by actively participating in group problem-solving sessions concerning complex designs or difficult installations.
Doing LPO’s
Enhanced scaffold safety by conducting thorough inspections and addressing potential hazards.
Contributed to project success by adapting scaffolding structures to accommodate unique building shapes and features.
Reduced worksite accidents through diligent maintenance of scaffolding systems, replacing damaged or worn parts as needed.
Maintained a safe working environment by adhering to OSHA guidelines and company safety procedures.
Assembled, erected and dismantled scaffolding structures to meet project needs.
Followed OSHA regulations and safety standards when installing and working with scaffolding.
Carried materials and equipment weighing up to [Number] pounds onto job sites in various climates and weather conditions.
Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
Erected scaffolding for [Number] jobs from [Type] projects to [Type].
Shaped or cut materials to specified measurements using hand tools, machines and power saws.
Cut and shaped materials to meet outlined measurements.
Upheld quality standards throughout the duration of projects with meticulous attention to detail in all aspects of scaffold assembly.
Increased project efficiency by assembling and disassembling scaffolding systems in a timely manner.
Displayed strong physical stamina, consistently fulfilling demanding labor requirements throughout long workdays onsite.
Demonstrated adaptability in responding to varied work conditions including extreme heights or tight spaces while maintaining high performance standards.
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Facilitated harmonious working relationships with crew members to prevent problems and conflicts.
Scaffold Carpenter
Brock Group
ExxonMobile (BOP)Baytown, Tx
10.2019 - 03.2020
Select tools, equipment and or material and transported to the work area
Cutting any wood needed by size(plywood, 2x4’s)
Assemble and fasten material together to metal frame work using proper tools.
Pass up/down material,( Hand to hand) Putting 9-wire to tie down toe boards, making sure everything was properly secured down
Putting clamps, legs, bars, braces, ladders, & boars(metal or wood), as building the scaffold.
Taking measurements for new scaffolds to be built (small scaffolds)
Performed various cleanup activities
Identify safety risks and precautions required to matigate those risks.
Sign and receive permits from the operator
Use all required PPE
Make a detailed list of material needed to complete scaffolding
Good communication with coworkers.
Discuss and fill out JSA( Job Safety Analysis )with the crew.
Checking harnesses, making sure there were no rips, making sure lanyards retracted properly, making sure it was color coded, and not damaged.
Closing permits daily and on time.
Always working safely.
Always using safety guidelines.
Enhanced scaffold safety by conducting thorough inspections and addressing potential hazards.
Upheld quality standards throughout the duration of projects with meticulous attention to detail in all aspects of scaffold assembly.
Increased project efficiency by assembling and disassembling scaffolding systems in a timely manner.
Reduced worksite accidents through diligent maintenance of scaffolding systems, replacing damaged or worn parts as needed.
Ensured proper material usage with accurate measurements, cutting, and fitting of scaffold components.
Promoted a strong teamwork environment by actively participating in group problem-solving sessions concerning complex designs or difficult installations.
Adhered to strict quality control standards, guaranteeing the reliability and stability of built scaffolding structures.
Enhanced job site safety by assembling and dismantling safe, secure scaffolding structures.
Reduced workplace accidents with proper inspection and maintenance of scaffold components.
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Improved team productivity through effective collaboration and clear communication with coworkers and supervisors.
Worked around live machinery and ongoing operations to complete [Number] scaffolding projects on-time and under budget.
Carried materials and equipment weighing up to [Number] pounds onto job sites in various climates and weather conditions.
Participated in regular safety meetings, contributing to ongoing improvement efforts for job site practices.
Maintained compliance with OSHA regulations, ensuring a safe work environment for all personnel onsite.
Maintained safety and operational procedures for [Number] projects at heights of up to [Number] feet.
Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
Scaffold Helper/ Scaffold Carpenter
Brand Safeway
BASF Port Arthur
06.2017 - 10.2019
Selecting tools, material and or equipment and transported to the working area
Identify safety risks and precautions required to mitigate those risks.
Putting barricades in my work area.
Discuss and fill out JSA( Job Safety Analysis) with the crew
Make a detailed list of materials needed to complete scaffolding.
Sign and receive permits from operators
Used all required PPE.
Good communication with coworkers. Performed various cleanup activities.
Helping in the chain line, passing up and or down material (hand to hand)
Assembled and fastened material together to a metal framework using proper tools.
Nailing wood, making sure there were no gaps on deck.
Helping cut any wood(plywood & 2x4’s)using the right tool.
Putting netting around the deck, making sure it was neat and placed correctly, no gaps.
Putting 9- wire, making sure all toe boards were safely secured to the deck.
Always working safely..
Always using safety guidelines.
Assisted in loading and unloading scaffolding materials, ensuring proper transportation to and from job sites.
Provided essential reinforcement for scaffolds by installing cross braces and guardrails as needed.
Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
Assisted with tying off and securing scaffolding to building structures to optimize safety.
Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
Repaired and replaced broken or worn-out wooden components in buildings.
Followed OSHA regulations and safety standards when installing and working with scaffolding.
Shaped or cut materials to specified measurements using hand tools, machines and power saws.
Fireproofing helper
Brock Industrial
Orascom (Natgas) Beaumont, TX
05.2016 - 06.2017
Putting corner beads on the structure
Performed various cleanup activities
Helping cut Mesh wire, making sure we helped each other
Helping Q.C with the inspection of the progress
Making sure our corner beads were straight, the cement was all leveled out
Helping the Insulation department with collecting rosters from foreman’s and updating everyday progress into the system
Helped in the paint department, painting pipes, and valves with brush and roll
Helped with Scaffold Data Entry, entering all updates of demos
Always working safely
Used all required PPE
Good communication with colleagues
Discuss and fill out JSA ( Job Safety Analysis ) with the crew
Select tools and material and transport them to the working area
Identify safety risks and precautions required to eliminate those risks
Always using safety guidelines.
Performed manual labor and random jobs to help teams accomplish goals.
Followed supervisor instructions to complete tasks on time.
Cleaned and straightened work areas to maximize productivity and safety.
Maintained a clean and organized workspace, reducing accidents and increasing overall productivity.
Set up ladders and other access equipment.
Operated variety of power tools and hand tools.
Supported skilled workers with tasks such as measuring, cutting, and assembling materials for successful project completion.
Operated various hand and power tools to complete general tasks.
Contributed to a safe work environment by maintaining cleanliness and order in the workspace.
Education
High School Diploma -
North Shore Senior High School
Houston, TX
05.2007
Skills
Highly communicative, with a team oriented mentality and commitment to safety Plants/Refinery experiences for 7 years Scaffold, fireproofing and safety department Skilled at working safely Eager to learn new skills and advance knowledge with hand-on experience Bilingual & fast learner