Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Michael Davis

Lexington,United States

Summary

Dedicated Surveyor with strong organizational skills and experience in site layouts. Motivated to advance to Chief Surveyor role and expand knowledge. Experienced in managing field operations, ensuring precise measurements using advanced techniques and equipment. Diligent Chief Surveyor with expertise in surveying, site measurement, data collection accuracy, team leadership, and communication skills.

Overview

8
8
years of professional experience

Work History

Survey Party Chief

Fluor Heavy Civil LLC
03.2023 - Current


  • Ensure adherence to safety protocols, resulting in zero accidents during field operations.
  • Reduce potential errors by performing regular equipment calibration checks and by checking the field layout data from other surveyors on the project.
  • Organize and delegate daily tasks to subordinate crew members.
  • Create Surface models, line-work, and data points to be used for field layouts.
  • Process as-build, and topographic data to assist other departments
  • Participate in daily operation meetings, to coordinate survey layouts with other departments.

Surveyor Party Chief

JD Abrams LP
08.2020 - Current
  • Used Trimble Robotics, GPS Systems and Trimble Business Center to complete field surveys.
  • Used Trimble Business Center for project models, as well as models for machine control.
  • Ran bridge calculations, and created spreadsheets for foam fills.
  • Made KMZ files, and utilized Trimble to digitize cross sections and georeference images to determine accuracy of data.
  • Took active role in departmental meetings, discussing geospatial needs and project updates to proactively identify and resolve concerns.

Surveyor Party Chief

OHL NA
09.2017 - 08.2020
  • Compiled information necessary to stake projects for construction using engineering plans.
  • Trained, mentored and assigned work to subordinate crew members.
  • Performed field calculations to complete assessments.
  • Identify errors in the field, as well as engineering plans.
  • Organize and report data collected from the field.

Education

High School Diploma -

Lexington ISD
05.2016

Skills

  • On-site data acquisition
  • Trimble Business Center proficiency
  • Skilled in creating 3D models
  • Bridge design calculations
  • Overseeing daily task delegation
  • Construction staking
  • Task prioritization
  • Quality management
  • Quickly adjusting to change
  • Quality improvement initiatives

References

Kent Burris

Phone Number: 512-430-0374


William Byerly

Phone Number: 254-410-053


Bryan Mayeux

Phone Number: 512-948-0835



Timeline

Survey Party Chief

Fluor Heavy Civil LLC
03.2023 - Current

Surveyor Party Chief

JD Abrams LP
08.2020 - Current

Surveyor Party Chief

OHL NA
09.2017 - 08.2020

High School Diploma -

Lexington ISD