Managed time efficiently in order to complete all tasks within deadlines.
- Fabricated piping pieces and components in line with design specifications for each system.
- Read and interpreted blueprints and schematics to determine locations, quantities, and sizes of materials required.
- Planned pipe system layout, installation and repair according to specifications.
- Interpreted blueprints to determine locations, quantities, and sizes of materials required.
- Cut and drilled holes in walls to permit passage of pipes.
- Secured rising mains and boiler piping to structural supports in new construction and remodeling projects.
- Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
- Measured, threaded, and cut materials to correct angles.
- Filled pipe systems with water and air to determine location of leaks.