Summary
Overview
Work History
Education
Skills
Certification
Home renovations, Landscaping, RV camping, Bicycling
Timeline
Generic

Michael A. Wallace

San Antonio,TX

Summary

Seasoned Superintendent offering 30+ years experience supporting construction aspects of various projects. Successful at managing work operations, material testing, vendors and design professionals. Detail and "zero punch list" focused with proven time management and prioritization skills. Goal oriented for on-schedule and on-budget delivery. Successful at coordinating diverse resources and satisfying tough clients according to demanding timelines.

Overview

22
22
years of professional experience
1
1
Certification

Work History

Superintendent

W4 CONSTRUCTION GROUP
09.2023 - Current
  • Design-Build project for Active Vehicle Barriers at Scott Gate; $2.6M
  • Ensured timely completion of projects by closely monitoring schedules and proactively addressing potential delays.
  • Contributed to weekly progress meetings with USACE officers and construction team.
  • Developed strong relationships with clients, enhancing positive review.

Superintendent/QC Manager/SSHO

W4 CONSTRUCTION GROUP
09.2021 - 09.2023
  • Design-Build renovation of 47 yr. old barracks; 47,000 s.f.; $12.2M
  • Reviewed design plans & specifications for accuracy, during design phase
  • Reviewed product submittals and managed register
  • Monitored safe work practices and conducted Site Safety Meetings
  • Collaborated with MEP Subcontractor Superintendent to schedule timely delivery and installation of equipment

Superintendent

W4 CONSTRUCTION GROUP
08.2021 - 08.2021
  • Superintendent; Collaboration with professional Dive Team Subcontractor: $137,700
  • Cleaning water Intake cribs on 36" pipes for fresh water supply intake, to Water Treatment Plant #12
  • Assisted Subcontractor submitting final study report on condition of other water intake cribs

Superintendent

W4 CONSTRUCTION GROUP
05.2021 - 08.2021
  • Collaboration with Electrical Subcontractor; Replace Centralized Uninterruptible Power Supply (UPS); $561,100
  • Critical operations continued while protecting critical systems & expensive Govt property during change out
  • Provide study and report of electrical distribution system at Navy Drug Screening Lab, Bldg 5501; $70,500

Superintendent/SSHO/QC Manager

CCI Energy & Construction
02.2020 - 04.2021
  • Replaced Aerobic Septic Sewers. Install 4,500 L.F gravity sanitary sewer, and Force Main to local treatment plant from 2 ea. 20 ft deep Lift Station wet wells
  • Reviewed plans and inspected ongoing construction
  • Implemented safety protocols with critical trench safety

Superintendent/SSHO

CCI Energy & Construction
04.2018 - 01.2020
  • Supervised Dorms Get Well Program; $6,984,000
  • Led construction team renovating 1,185 Navy Dorm Rm Showers, Toilets and common areas at two fully occupied dormitories
  • Provided progress reports and updated schedules at weekly Owner's meetings

Construction QC Manager

AMIDON, INC.
06.2017 - 04.2018
  • Historical Cannon Caisson Bldg. Renovation of 7,000 sq, ft. historical bldg.
  • Developed effective communication with Architect during design and construction
  • Played instrumental role in achieving required historical certification with Ft. Sam Historical Society, that contributed positively to company's reputation

Superintendent/QC Manager

BLACKHAWK VENTURES / FMS
04.2016 - 05.2016
  • Managed final phases of work and Commissioning/Close-out at multi-bldg facility, achieving LEED Certified Gold.

Superintendent

BLACKHAWK VENTURES / FMS
12.2015 - 12.2015
  • Managed close-out of renovation; HVAC, Plumbing, Fire Alarm systems, Interior finishes, etc. included, allowing Customer to resume timely re-occupation

Superintendent

BLACKHAWK VENYURES / FMS
06.2015 - 07.2015
  • Managed Subcontractor to complete new TPO Roof at fully operational 6ea Bldg 120,000 sq. ft. facility
  • Relocated and installed existing rooftop equipment

Project Manager

G.W. MITCHELL
11.2006 - 11.2008
  • Demolition of Historic Walgreens store and Construction of new Walgreens, Offices & Basement Parking Downtown San Antonio.
  • Played integral role in development and implementation safe work for protecting pedestrians and vehicles

Project Engineer

LINBECK
07.2002 - 09.2003
  • Project Engineer managing Subcontractors' submittal and work; Landscaping, Masonry, Drywall and Interior finishes.
  • Site Safety monitoring safe work practices, reporting to the Superintendent and the Project Manager

Construction QC Manager

AMIDON, INC.
05.2017 - 06.2017
  • Remove exist. tar/gravel roof and 8 arrays of Solar Panels and hardware, to be re-installed upon new TPO roof system at active 111,000 sq. ft. Facility Mgmt. and Soldier Barracks.
  • Documented inspection results by completing logs.
  • Conducted audit inspections and independent checks to verify parts and materials.
  • Joined team late in project and served as point of contact for individuals seeking roof warranty information and worked to resolve customer conflicts and product issues.
  • Oversaw corrective action plans for non-conforming products, ensuring timely resolution of issues to minimize impact on customers.

Superintendent

BLACKHAWK/FMS
  • USACE Hangar 45 Renovations, Little Rock AFB: On-site Rep
  • Meting with the Contracting Officer, pushing Subcontractors' completion of work, punch list and required Contract Close-Out.

Construction Coordinator & Asst. Superintendent

GILBANE
  • New Bus Shelters throughout the Houston service area.

Project Engineer

LINBECK
08.2000
  • TX Heart Institute at St
  • Luke's Hospital, Houston Medical Center.

Superintendent

AUTOBUILDERS, Inc.
04.2012 - 05.2013
  • Superintendent for Penske Automotive Group dealerships, Round Rock, TX: -Honda Dealership - remodel & new roof: new showrooms, reconfigured offices, Toilet Rms., Customer waiting and Lounge spaces, new HVAC & Plumbing systems, TPO Roof, Interior wood doors & new H/W, metal framed/glass storefront and exterior overhead doors and hardware, interior finishes and furniture packages.

Superintendent

BLACKHAWK/FMS
03.2009 - 04.2012
  • Superintendent, Construction QC & Project Manager for Texas Army National Guard @ JBSA Ft
  • Sam Houston - Superintendent: Remodeled a 5,500 sq
  • Ft., 45 yr.old Shooting Range into a Secured Compartmented Information Facility (SCIF), complying to CD/ICS 705 Standards.

Superintendent/CQC Manager/SSHO

OPENNA GROUP
04.2011 - 03.2012
  • Superintendent/CQC Manager/SSHO at USACE Lake Somerville Headquarters, Somerville, TX; Onsite managing of Subcontractors', Vendors' and labor staff construction activities
  • Included were Asbestos abatement and demolition of existing facility, while construction of new facility was built at same property.

Asst. Project Manager

W.G YATES
11.2003 - 08.2006
  • City of San Antonio New Fire Fighting Training Academy.

Construction Coordinator & Asst. Superintendent

GILBANE
- 07.2000
  • West Orem Rd
  • Improvements for METRO Transit, including new pavement, underground utilities, Wastewater sewer system & Lift Station, Roadway bridge and Traffic Control markings and structures.

Education

Some College (No Degree) - Architecture Design

Texas Tech University
Lubbock, TX

Skills

  • Certified USACE Construction Quality Manager
  • RMS 3
  • Procore
  • Bluebeam Revu
  • OSHA 30 Certified
  • Site Safety Health Officer
  • Scheduling Coordination
  • Environmental awareness
  • Subcontractor Management
  • Site Inspection
  • Relationship building and management

Certification

  • USACE CQM Certified
  • USACE Construction Quality Management (USACE & NAVFAC)
  • OSHA 30 Hr.
  • First Aid/CPR

Home renovations, Landscaping, RV camping, Bicycling

DIYer.  Built two level deck, covered by a pergola & rock paver steps and landing leading lawn.  A fire pit area is nearby. 

Landscaping is an ongoing hobby and source of relaxation.  We enjoy RV camping. 

Timeline

Superintendent

W4 CONSTRUCTION GROUP
09.2023 - Current

Superintendent/QC Manager/SSHO

W4 CONSTRUCTION GROUP
09.2021 - 09.2023

Superintendent

W4 CONSTRUCTION GROUP
08.2021 - 08.2021

Superintendent

W4 CONSTRUCTION GROUP
05.2021 - 08.2021

Superintendent/SSHO/QC Manager

CCI Energy & Construction
02.2020 - 04.2021

Superintendent/SSHO

CCI Energy & Construction
04.2018 - 01.2020

Construction QC Manager

AMIDON, INC.
06.2017 - 04.2018

Construction QC Manager

AMIDON, INC.
05.2017 - 06.2017

Superintendent/QC Manager

BLACKHAWK VENTURES / FMS
04.2016 - 05.2016

Superintendent

BLACKHAWK VENTURES / FMS
12.2015 - 12.2015

Superintendent

BLACKHAWK VENYURES / FMS
06.2015 - 07.2015

Superintendent

AUTOBUILDERS, Inc.
04.2012 - 05.2013

Superintendent/CQC Manager/SSHO

OPENNA GROUP
04.2011 - 03.2012

Superintendent

BLACKHAWK/FMS
03.2009 - 04.2012

Project Manager

G.W. MITCHELL
11.2006 - 11.2008

Asst. Project Manager

W.G YATES
11.2003 - 08.2006

Project Engineer

LINBECK
07.2002 - 09.2003

Project Engineer

LINBECK
08.2000

Superintendent

BLACKHAWK/FMS

Construction Coordinator & Asst. Superintendent

GILBANE

Construction Coordinator & Asst. Superintendent

GILBANE
- 07.2000

Some College (No Degree) - Architecture Design

Texas Tech University
Michael A. Wallace