Summary
Overview
Work History
Skills
Timeline
Generic

Mike Hardiman

Goshen,OH

Summary

Talented professional considered knowledgeable leader and dedicated problem solver. Brings 22 years of valuable expertise to forward company objectives. Attentive to detail with experience in coordinating projects, programs and improvements.

Overview

22
22
years of professional experience

Work History

Project Manager

Carter Site Development LLC
10.2001 - 11.2023
  • Managed commercial construction projects by working effectively with general contractors, subcontractors, engineers and architects.
  • Directed day-to-day operational aspects of project and scope and monitored progress of construction activities.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Operated range of heavy equipment on regular basis with advanced skill.
  • Trained in diverse pieces of equipment and useful attachments to handle team needs.
  • Adjusted soil levels and grade land for construction projects.

Pipefitter Foreman

Carter Site Development LLC
10.2001 - 11.2023
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

Lead Pipe Layer

Carter Site Devlopment LLC
10.2001 - 11.2023
  • Moved pipe into trenches and layered pipe in trenches to help initial backfill.
  • Installed and repaired wet and dry utility pipe, sanitary and storm water sewer structures and pipe systems.
  • Utilized appropriate materials and tools to connect pipe pieces and seal joints.
  • Assembled pipes to pass required pressure tests.
  • Monitored fellow workers to promote safety and productivity.
  • Assembled and installed underground pipe, fittings and valves of various sizes.
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.

Skills

  • Project Management
  • Advanced Problem Solving
  • Reading Blueprints
  • Construction Equipment Operation
  • Equipment Maintenance
  • Storm Drain Piping
  • Pipe Laying

Timeline

Project Manager

Carter Site Development LLC
10.2001 - 11.2023

Pipefitter Foreman

Carter Site Development LLC
10.2001 - 11.2023

Lead Pipe Layer

Carter Site Devlopment LLC
10.2001 - 11.2023
Mike Hardiman