Talented professional considered knowledgeable leader and dedicated problem solver. Brings 22 years of valuable expertise to forward company objectives. Attentive to detail with experience in coordinating projects, programs and improvements.
Overview
22
22
years of professional experience
Work History
Project Manager
Carter Site Development LLC
10.2001 - 11.2023
Managed commercial construction projects by working effectively with general contractors, subcontractors, engineers and architects.
Directed day-to-day operational aspects of project and scope and monitored progress of construction activities.
Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
Operated range of heavy equipment on regular basis with advanced skill.
Trained in diverse pieces of equipment and useful attachments to handle team needs.
Adjusted soil levels and grade land for construction projects.
Pipefitter Foreman
Carter Site Development LLC
10.2001 - 11.2023
Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
Followed safe work practices, which included fall protection and personal protective equipment.
Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
Installed new systems and connected piping to existing components by welding, bolting and threading.
Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
Lead Pipe Layer
Carter Site Devlopment LLC
10.2001 - 11.2023
Moved pipe into trenches and layered pipe in trenches to help initial backfill.
Installed and repaired wet and dry utility pipe, sanitary and storm water sewer structures and pipe systems.
Utilized appropriate materials and tools to connect pipe pieces and seal joints.
Assembled pipes to pass required pressure tests.
Monitored fellow workers to promote safety and productivity.
Assembled and installed underground pipe, fittings and valves of various sizes.
Handled all repairs for sanitary and storm water sewer structures and pipe systems.
Skills
Project Management
Advanced Problem Solving
Reading Blueprints
Construction Equipment Operation
Equipment Maintenance
Storm Drain Piping
Pipe Laying
Timeline
Project Manager
Carter Site Development LLC
10.2001 - 11.2023
Pipefitter Foreman
Carter Site Development LLC
10.2001 - 11.2023
Lead Pipe Layer
Carter Site Devlopment LLC
10.2001 - 11.2023
Similar Profiles
Lisa AdamsLisa Adams
Controller at Watkins Site Development, LLCController at Watkins Site Development, LLC