Summary
Overview
Work History
Education
Skills
Timeline
Generic

Morrell Stewart

Cabot,AR

Summary

Proficient Installer offering 2 years of experience focused on customer satisfaction. Strong mechanical and technical skills with good eye for detail. Versed in diagnosing and repairing issues and installing new systems.

Overview

8
8
years of professional experience

Work History

Installer

Razorback Air Conditioning
West Memphis, AR
04.2022 - Current
  • Wired both line and low voltage to heating and cooling equipment.
  • Serviced units to residential and commercial heating and air conditioning customers.
  • Unloaded and loaded truck supplies and equipment using proper hoisting techniques to avoid accidents and injuries.
  • Maintained safe working environment with proper execution of HVAC guidelines and usage of PPE equipment.

Concrete Finisher/Construction Framer

Farco
West Memphis, AR
03.2020 - 05.2022
  • Used numerous types of power tools and other equipment daily.
  • Finished surfaces by troweling, floating and brushing following project requirements and specifications.
  • Poured concrete into forms using pump hose and leveled.
  • Positioned wire mesh and rebar to reinforce concrete.

Rough Framer

Adrian Gomez Construction
West Memphis, AR
03.2019 - 04.2022
  • Assembled cut lumber into wall sections or floor frames on the job site.
  • Maintained a safe work environment at all times by following safety protocols.
  • Loaded tools, equipment, and supplies onto trucks before heading out to jobsites.
  • Cut studs, joists, rafters, and other framing members to size using power saws.
  • Organized tools and supplies in preparation for upcoming projects in order to save time.
  • Ensured that all construction activities were carried out in accordance with local codes and regulations.
  • Secured siding material onto building exteriors with nails or screws.
  • Inspected completed work for accuracy before moving on to the next task.
  • Constructed staircases from scratch according to blueprints provided by architects.
  • Drilled holes in wood for electrical wiring installations.
  • Repaired damaged framing components due to weather conditions or mishandling of materials.
  • Assisted other team members when needed with heavier tasks that required additional manpower.
  • Fitted insulation between studs of interior walls prior to drywall installation.
  • Supported heavy beams during installation process using chains or ropes.
  • Installed headers, trimmers, and cripples in walls and ceilings.
  • Set windows and doors in place within frames according to level measurements.
  • Measured and marked cutting lines on lumber for rough framing.
  • Cleaned up debris from worksite upon completion of project using shovels and brooms.
  • Attached sheathing material to exterior walls with nails or staples.
  • Erected roof trusses and installed roofing materials such as shingles or tiles.

Rough Framer

Smiths Construction
Earle, Arkansas
04.2016 - 03.2019
  • Assembled cut lumber into wall sections or floor frames on the job site.
  • Maintained a safe work environment at all times by following safety protocols.
  • Loaded tools, equipment, and supplies onto trucks before heading out to jobsites.
  • Cut studs, joists, rafters, and other framing members to size using power saws.
  • Drilled holes in wood for electrical wiring installations.
  • Constructed staircases from scratch according to blueprints provided by architects.
  • Organized tools and supplies in preparation for upcoming projects in order to save time.
  • Secured siding material onto building exteriors with nails or screws.
  • Inspected completed work for accuracy before moving on to the next task.
  • Repaired damaged framing components due to weather conditions or mishandling of materials.
  • Assisted other team members when needed with heavier tasks that required additional manpower.
  • Fitted insulation between studs of interior walls prior to drywall installation.
  • Set windows and doors in place within frames according to level measurements.
  • Measured and marked cutting lines on lumber for rough framing.
  • Cleaned up debris from worksite upon completion of project using shovels and brooms.
  • Attached sheathing material to exterior walls with nails or staples.
  • Erected roof trusses and installed roofing materials such as shingles or tiles.

Education

High School Diploma -

West Memphis High School
West Memphis, AR
05-2006

Skills

  • Construction knowledge
  • Safety Procedures
  • Inventory Accountability
  • Product Inspection
  • Taking precise measurements
  • Customer Service
  • Time Management
  • Equipment Operation
  • Attention to Detail
  • Emergency Procedures
  • Equipment Installation
  • Customer Relations
  • Equipment Repair
  • Customer Satisfaction
  • HVAC Systems
  • Power Tool Operation
  • Commercial construction experience
  • Flooring
  • Installation expertise
  • Positive Attitude
  • Worksite preparation

Timeline

Installer

Razorback Air Conditioning
04.2022 - Current

Concrete Finisher/Construction Framer

Farco
03.2020 - 05.2022

Rough Framer

Adrian Gomez Construction
03.2019 - 04.2022

Rough Framer

Smiths Construction
04.2016 - 03.2019

High School Diploma -

West Memphis High School
Morrell Stewart