Onsite Project Managment
Overseeing Projects from inception to Finish
Overseeing Day to Day Operations
Coordinating Subcontractors
Scheduling and handling inspections with Local Municipalities
Maintaining a safe Jobsite
30 Hr OSHA Certification
CPR Certificate
Florida Stormwater Certification
Scaffolding Competent Person Certification
Excavation Competent Person Certification
Fall Protection Competent Person
Defensive Driving Certification
Primrose School Of Estero Started 2018. Completed August 2019
Approximately 12111 Square Feet.
With Playground. Project included Full infrastructure with underground utilities and Full Buildout.
Primrose School Of Lakewood North 2019- 2020 15000 square feet Building With Playground and full infrastructure
This Project I had to take over mid Project during the Covid Epidemic to Completion due to the Superintendent that was onsite lost confidence of the Leadership
The Pointe at Founders Square
Start 2020 finished 2021
40000 Square Foot Building With all Exterior finishes and Interior Fire Walls. This Project included Complete Infrastructure with underground utilities and several Grease Traps in Concrete service area in the rear of the building. We worked closely with Greater Naples Fire to complete this project.
Estero Crossings
2021 to 2022
12000 Square Feet of White Shell Building With Firewalls. Two Separate Buildings with corresponding permits No Infrastructure or Utilities all done by Developer
The Plaza at Founders Square
2022-2023
7000 Square Feet of White Box and Firewalls. With complete Infrastructure and Utilities This was an unusual job for me due to I had to build the building side by side with PBS which was building an Ace Hardware adjacent to ours and I had to Tie all our infrastructure to that building.
Beeline Bar
2024 -2025
4000 Square Feet Retofit
This was a Partial Demo and complete Retrofit In the Mercado of Naples with High end Wood Finishes and Full 60 foot serpentine Bar. With Specilizd Lighting and 4 Chan Control System.
Pine Island Retail
May 2025 January 2026
4000 Square Foot Building With 2500 Square Feet of Shell.
1500 SF Buildout Cali Coffee
With Full Infrastructure and Utilities while keeping the Adjacent Dollar General open even as we demo and install Storm Structures in their parking lot
January 2026- March 2026
Marine Max Naples
Redoing and Raising Electrical Service to above Flood Elevation