Accomplished Lead ADAS Engineer with a proven track record at Stellantis and Fiat Chrysler Automobiles, specializing in integrating advanced sensor systems and enhancing vehicle automation. Expert in C, MATLAB, Java, and Python, demonstrating strong analytical and problem-solving skills. Achieved 95% on-time delivery for chassis components, showcasing exceptional project management and technical acumen.
Supported prototype group by coordinating the design, purchase, supplier delivery and
dispersal of chassis components for prototype/mule builds
Led chassis product development team to execute frame, cradle and suspension design
Directly managed procurement and delivery; achieved 95% on-time delivery (2018)
Successfully resolved major build delay for 2019 Heavy Duty Truck prototypes by working with
production buyers to resolve material shortages (high strength/lightweight steels)
Conducted root cause analysis to address vehicle build issues utilizing Eight Disciplines Problem
Solving (8Ds)
Solved structural clash/interference issues between chassis and all interfacing components,
i.e. powertrain, body, electrical routing, etc.
Communicated build issues to product development team to address inherent design flaws
and held supplier tiers accountable for quality
Participated in projects with the Plastics Pilot team which involved implementing new injection
molding and paint processes, for 2015 Toyota/Lexus vehicles
Rerouted travel path of Automated Ground Vehicles (AGVs) to integrate with new line layout by
learning and reprogramming AGV logic
Improved operator ergonomics of the 2015 Corolla instrument panel trim station by 30%;
project one sheet - https://www.slideshare.net/slideshow/embed_code/key/kkXaDFRkA8Ehio (MOVE INTO PROJECT SECTION)
Set up a Design of Experiments (DOE) with paint team for testing application of 2015 Lexus
colors on front and rear bumpers
Tested six colors and three spray-paint variables including atomizing air, shaping air, and
bell flow rate
Managed manufacturing programs for prototype engine cradles, including the planning of builds
and facilitating engineering design changes
Improved layout for a spot weld cell by reconfiguring weld robots and repositioning fixtures to
optimize cycle times
Communicated with line integrators and construction contractors to facilitate plant capital