Achieved a notable reduction in workplace accidents at Belco Elecnor Electric Inc by enforcing safety regulations and employing innovative construction techniques. Excelled in construction supervision and labor management, enhancing project efficiency and stakeholder communication. Mentored staff, fostering professional development and ensuring project alignment with strategic goals.
Overview
1
1
Certification
Work History
General Superintendent
Belco Elecnor Electric Inc
14320 Albers Way Chino Ca 91710
2016 - Current
Ensured compliance with safety regulations, resulting in a significant reduction of workplace accidents.
Facilitated effective communication between stakeholders, maintaining transparency throughout project phases.
Consistently met deadlines by prioritizing tasks and closely monitoring progress throughout the project lifecycle.
Mentored junior staff members, contributing to their professional growth within the organization.
Improved project efficiency by implementing detailed scheduling and resource allocation strategies.
Implemented innovative construction techniques to increase overall productivity on job sites.
Evaluated risks associated with various projects, ensuring proper mitigation strategies were in place.
Reviewed plans and inspected ongoing construction to keep work in line with project goals.
General Foreman
Ferreira Construction Co
Chino Ca
2014 - 2016
Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
Delivered project updates to superintendent and detailed issues that could halt work progress.
Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
Collaborated with subcontractors for seamless coordination of work scopes, ensuring smooth project execution from start to finish.
Conducted thorough risk assessments before commencing projects, identifying potential challenges and developing contingency plans accordingly.
Ensured compliance with all relevant regulations and industry standards during the execution of assigned tasks, mitigating potential legal issues or penalties.
Documented construction and extraction workers' hours, wages and other pertinent information.
General Foreman
Flatiron Electric
2011 - 2014
Managed major Caltrans along with Citywide transportation systems improvement projects
Managed the installation of mainline duct bank systems to include large underground vault installations
Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.
Liaised between field engineers and trade workers align construction projects with drawings and specifications.
Conducted thorough risk assessments before commencing projects, identifying potential challenges and developing contingency plans accordingly.
Created and implemented plans to maximize efficiency of workers.
Assisted in recruiting and hiring new construction and extraction workers.
Electrical Foreman
Moore Electric
2002 - 2011
Read complex schematics and blueprints to install smart transportation electrical systems.
Oversaw installation, maintenance and repair of power lines, electrical systems, fixtures and Traffic Signal communication systems.
Evaluated job scope and determined necessary supplies, timelines, and projected expenses.
Maintained accurate documentation related to project requirements, change orders, and progress for clear communication with project managers.
Planned, assigned, scheduled and supervised work of electricians and other assisting personnel, to include heavy equipment operators, Laborers and subcontractor personnel.
Ensured projects adhered to local, state, and national electrical codes.
Heavy Equipment Operator / Electrician
Paul Gardner Corp.
1994 - 2002
Operated excavators, Skid steer and boom crane along with dump trucks to transport heavy materials, practicing safety measures.
Demonstrated versatility in skillset by operating multiple types of heavy machinery to accommodate project needs.
Enhanced site safety by rigorously following operational protocols and conducting regular equipment inspections.
Installed, tested and modified circuit breakers, controls, fuses, safety lights.
Performed electrical system installation of conduit, wire, power distribution.
Installed complex electrical systems for new construction projects while adhering to strict deadlines without compromising quality or safety standards.
Ensured compliance with local, state, and national electrical codes by staying up-to-date on industry changes and implementing them into daily work practices.
Worked as an operator electrician on large Caltrans and city wide transportation traffic signal systems installations.
Install mainline duct bank systems for various utility companies.
Laborer / Pipe Fitter
Shacklett Construction Company
State St. Pomona Ca
1986 - 1994
Supported construction projects by assisting with heavy equipment operations and manual labor tasks.
Assisted in digging, trenching and backfilling trenches and foundations.
Dug trenches, backfilled holes and compacted earth to prepare for new construction.
Installed watermain systems, mainline duct bank bank for SCE and various communication agencies
Installed large manhole vaults utilizing large shoring boxes along with the use of trench shoring safety jacks along the excavated trench line.