Dynamic Senior Production Supervisor with a proven track record at Niagara Bottling, excelling in quality assurance and process optimization. Achieved a 50% reduction in line rejection rates through effective team leadership and continuous improvement initiatives, enhancing operational efficiency and fostering a culture of accountability across departments.
Overview
36
36
years of professional experience
Work History
Senior Production Supervisor/Manager
Niagara Bottling
Middleburg
01.2018 - Current
Continuous improvement in the areas of quality, cost, safety and housekeeping.
Implemented procedures and fostered teamwork across plant support departments.
Resolved issues and implemented corrective measures to enhance operational efficiency.
Implemented self-directed work teams (coordinate quality, area problems, logistics, and maintenance).
Reduced changeover time.
Led hiring, training, and disciplinary processes for reporting personnel.
Maintained quality assurance processes to enhance product reliability.
Production Supervisor
Pennsylvania Transformer Technology Inc.
01.2018 - 12.2018
Ensured compliance with quality assurance protocols to maintain product integrity.
Reduced in-line rejection rate by improving quality control measures.
Continuous improvement in the areas of quality, cost, safety and housekeeping.
Implemented procedures and applied teamwork with all plant support departments.
Managed hiring and training processes, enforcing disciplinary actions for reporting personnel to enhance team accountability.
Reduced changeover time.
Managed supply orders for the team.
Implemented self-directed work teams to coordinate quality, resolve area problems, manage logistics, and oversee maintenance.
Provided safety talks daily.
Department Head
Leed's
Pittsburgh
01.2016 - 12.2018
Improved line performance by implementing targeted enhancements.
Coordinated new product launches to expand market offerings.
Oversaw the integration of new equipment and tooling.
Focused on ongoing improvements in quality, cost, safety, and housekeeping.
Implemented procedures and applied teamwork with all plant support departments.
Reduced changeover time, boosting production efficiency.
Managed the hiring, training, and disciplinary processes for reporting personnel.
Reduced in line rejection rate.
Implemented self-directed work teams (coordinate quality, area problems, logistics, and maintenance).
Senior Supervisor
Pittsburgh Glass Work
Pittsburgh
01.2010 - 12.2016
Oversaw the operations of a high-speed automotive glass windshield production line.
Optimized safety, manpower, machinery, and materials to consistently meet or exceed quality, speed, and yield requirements.
Led continuous improvement initiatives in quality, cost, safety, and housekeeping.
Managed hiring, training, and disciplinary processes for reporting personnel to enhance team effectiveness.
Implemented procedures and applied teamwork with all plant support departments.
Decreased in-line rejection rate by implementing stricter quality control measures.
Minimized equipment changeover time to enhance production efficiency.
Implemented self-directed work teams (coordinate quality, area problems, logistics, and maintenance).
Resolve issues and Implement corrective measures.
Technical Supervisor
Continental Powertrain Division
Newport News
01.2005 - 12.2009
Managed personnel and resources to meet customer quality, cost, and delivery requirements.
Applied continuous improvement strategies to optimize operations.
Implemented procedures and facilitated cross-functional teamwork with plant support departments.
Coordinated self-directed work teams to address quality, area problems, logistics, and maintenance.
Minimized changeover duration during production processes.
Lowered in-line rejection rates through quality control measures.
Provided overall second level Line Management direction and accountability for all production.
Manufacturing Engineer
Valeo Clutches and Transmissions
Hampton
01.1995 - 12.2005
Led product launches by coordinating cross-functional teams and managing project timelines.
Managed new equipment installations and tooling development.
Improved production line efficiency through targeted enhancements.
Provided process sheet and control plans.
Coordinated initial customer samples and prepared necessary documentation.
Production Manager
Valeo Clutches and Transmissions
Hampton
01.1990 - 12.1995
Managed personnel and resources to meet customer quality, cost, and delivery requirements, supporting $60 million in annual sales.
Led continuous improvement team through six projects, resulting in 40% reduction in floor space utilization, 80% reduction in process material, 50% reduction in line rejection rates, and 15% improvement in productivity.
Reduced in line rejection rate from 200 parts per million to 12 parts per million.
Reduced changeover time from 1 hour to 15 minutes.
Developed self-directed work teams to coordinate quality, area problems, logistics, and maintenance.
Managed the hiring process, conducted training sessions, and executed disciplinary actions for reporting personnel.
Implementation and training in the use of Statistical Production Control (SPC) Team problem solving.
Provided overall second level Line Management direction and accountability for all production area with three shifts.