Overview
Work History
Education
Skills
Timeline
Generic

Richard Chavez

San Antonio,TX

Overview

8
8
years of professional experience

Work History

Supervisor

Faith Construction
San Antonio, Tx
01.1996 - 01.2001
  • Meet at Warehouse
  • Drive and Take materials to job site
  • Line guys out and show production.

Crew Leader

Executive Framers
Atlanta, Georgia
07.1993 - 01.2001
  • Pick up guys in the morning
  • Square up slab
  • Line out the guys and make sure house gets done on schedule

Sunset Station
San Antonio, Tx
01.1995 - 01.1996
  • Break down and set up events
  • Tear down tables.and chairs
  • Put up equipment microphone lights ect.

Concrete Finisher

Different Contractors
San Antonio, Tx
01.1993 - 01.1995
  • Straight edge slab Wreck the form boards and Make sure slab is good
  • Make sure equipment is clean and ready for next one.

Assistant Head custodian and Head Custodian

NISD School district
San Antonio, Tx
  • Make sure areas are clean and Sanitized
  • Finish when were suppose to
  • Make sure everything is locked and alarm is armed
  • Set up for events and break down what has to be put back

Siding Installer

F&R Painting
San Antonio, Tx
  • Change and replace all rotten wood
  • Install new siding
  • Take Debris with us.

Remodeler and Installer

MPS Construction and Design
San Antonio, Tx
  • Remodeled hospitals
  • Renovate O.R
  • Sheetrock Tape and float paint.Whatevers necessary to get job done on time

Site Coordinater

Arch-Con Houston
Texas
  • Make sure everything is being done with Safety
  • Get with GC and see whatever he needs
  • Change out Trash bags and drain out water pools

Framer

Halo Construction
San Antonio, Tx
  • Frame up metal walls
  • Put up sheetrock Tape and float and paint
  • Pop lines

Field Installer

Madera Millwork
Shertz, Tx
  • Get and Take everything we need on the field to get job done.

Drywall Hanger

Ernest CAstilleja Construction
San Antonio, Tx
  • Install Insullation
  • Install Soundboard
  • Install drywall

Education

Skills

  • Remodeling
  • Residential
  • Commercial
  • Industrial

Timeline

Supervisor

Faith Construction
01.1996 - 01.2001

Sunset Station
01.1995 - 01.1996

Crew Leader

Executive Framers
07.1993 - 01.2001

Concrete Finisher

Different Contractors
01.1993 - 01.1995

Assistant Head custodian and Head Custodian

NISD School district

Siding Installer

F&R Painting

Remodeler and Installer

MPS Construction and Design

Site Coordinater

Arch-Con Houston

Framer

Halo Construction

Field Installer

Madera Millwork

Drywall Hanger

Ernest CAstilleja Construction

Richard Chavez