Good skills, aptitude and training in Mechanical and Electronic troubleshooting. A good degree of competency in Digital electronics. Quick grasp of new procedures and process. Works well with people, and will present an excellent image of a company. Strong ability to work with minimal supervision, very reliable.
Field service professional with proven track record in managing and optimizing field operations. Strong focus on team collaboration and adapting to changing needs to achieve objectives. Skilled in troubleshooting, customer service, and operational efficiency. Reliable leader with results-driven mindset, known for fostering teamwork and ensuring high performance standards.
Experienced with managing field service operations and leading diverse teams to success. Utilizes strong problem-solving skills and effective communication to ensure high-quality service delivery. Track record of fostering teamwork and adapting to dynamic operational needs.
Work History
Field Service supervisor
2 Years 6 Months
FEI/Thermo Fisher Scientific | 01.2023 - 07.2025
Oversaw daily field service operations for 9 FSEs, approved expense reports, and scheduled training sessions.
January 2023 to current
Supervised field service engineers, coordinating installation, maintenance, and repair activities for analytical instrumentation.
Tracked service cases, parts usage, and work orders in CRM and ERP systems.
Resolved escalations by prioritizing customer issues and dispatching technicians to site.
Remote Service Engineer
1 Year 3 Months
Thermofisher | 10.2021 - 01.2023
Assisted customers via phone for Thermo Fisher services nationwide
October 2021 to Jan 2023
Installed analytical instruments and verified system performance for laboratory customers.
Diagnosed equipment faults and restored functionality through targeted troubleshooting.
Performed preventive maintenance, calibration, and routine service checks.
TEM Field service supervisor
1 Year 3 Months
07.2020 - 10.2021
Having 12 FSE’s that report to me
July 2020 to October 2021
FSE
9 Years 10 Months
09.2010 - 07.2020
Been to Eindhoven for company service training
September 2010 to July 2020
Covering service calls in Virginia, and DC and Maryland
Field service engineer
1 Year
Qiagen | 09.2009 - 09.2010
Primary covering Virginia and Maryland working on robotic medical equipment
3 Years
Applied Materials-DR SEM Vision with FIB | 03.2006 - 03.2009
Perform the maintenance and emergency functions within 7 by 12 on call compressed shift. Repair and install of automation equipment that pneumatic controls solenoid valves, PC interface controls. Troubleshoot mechanical and electrical failures down to component level by reading schematics or mechanical drawings. Installation and configuration servers, workstations, and interfaces by the use of 10 base networks. Worked with co-workers in product upgrades and modifications. Responded to fab issues by communicating with other engineers and participated in escalation conference calls. Applied diagnostic techniques for quick repairs. Used training and experience to identify process, software or hardware related system problems. Complied with all customer safety procedures and consistently valued safety. Worked all overtime and requested all training available for tool set.
1 Year
Shibatec | 07.2005 - 07.2006
Hired as Site Manager for a year long tool evaluation at Micron CDE 300 backside etch, worked with set-up crews with install schedule to meet Microns time line. Worked with Japanese engineers in establishing a training system for the USA engineers. Trained Micron personnel and after not meeting Micron’s process requirements, coordinate with move-out crews.
6 Months
Tokyo Electron | 01.2005 - 07.2005
Factory trained to troubleshoot and repair of CVD tools at Micron in Manassas,VA Worked on shift work with team under the supervision of a lead and reported to a business unit manager. Utilized PM calls and customer training to reinforce positive company and product image.
2 Years
01.2001 - 01.2003
CD-SEM Metrology Division, Assistant East Coast Manager Maintained and repaired TOPCON CD-SEM Machines. On call for Micron Semiconductor in Manassas Va. Trained all technicians and was first call for all service calls. Shibatec took over for Topcon Technologies on 10-1-2001
Shibatec
Assistant Site Manager
5 Years
Topcon Technologies, Inc. | 01.1996 - 01.2001
Worked with main design group in creating service manuals for all employees and was used as service guideline. In charge of all tool installs and maintenance. Worked with Topcon Japan in future tool orders for USA. First call for all technicians during their call shift. Responsible for tool at ASTC-Fishkill NY IBM Facility
Field Service Engineer
7 Years
Topcon Technologies, Inc. | 01.1989 - 01.1996
Troubleshoot down to component level for many tool types all while covering 38 states. Installed, maintained and repaired Topcon TEM/SEM analytical ultra-high resolution electron microscopes. Ensured fast on-site response time for customer problems. Utilized PM calls and customer training to reinforce positive company and product image Provided telephone assistance and diagnostics. Assisted with set-up and take-down of equipment at trade shows. Kept management informed with timely service reports, site surveys, inventories, expense accounts, and customer information. Trained other service technicians, assisted sales department.