Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Replaced 650 ton chillers at WVDC and ARMC.
Added 1000 & 500 Kw generator at WVDC, concrete pads and electrical
Replaced underground HW lines between Boiler Plant at CDC and Fontana Courts.
Installed 10 ton HVAC unit and ducking at data center.
Rebuilt cooling towers WVDC.
Replaced 1400 BTU boiler at Fontana Courts.
Installed a humidification system into HVAC system at Redlands Museum.
Installed 38 HVAC units between 4 - 10 ton at Probation Training Center.
Installed JCI system controls for 38 HVAC units.
Installed three HVAC units and replaced ductwork at Forestation.
Installed two 1000 boiler/water heaters at WVDC