Work Preference
Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
LANGUAGES
EQUIPMENT OPERATOR
Timeline
Generic

Robert Perez Velasquez

Tucson,AZ

Work Preference

Desired Job Title

Construction ManagerAssistant construction manager

Work Type

Full Time

Location Preference

On-Site
Location: Tucson, AZ, US
Open to relocation: Yes

Salary Range

120000/yr - 150000/yr

Important To Me

Career advancementWork-life balanceCompany CulturePersonal development programsHealthcare benefitsPaid time offTeam Building / Company RetreatsPaid sick leave401k matchStock Options / Equity / Profit Sharing

Summary

Competent construction manager, proficient in overseeing quality and keeping all work in strict compliance with applicable codes and standards. Observant and detail-oriented in identifying and correcting work problems. Excellent time management and multitasking abilities are useful in a fast-paced environment, with over 10 years of experience successfully managing front-line solar operations. Safety is my priority for all employees. seeking a full-time position, offering excellent communication and good judgment. Hardworking and passionate job seeker, ready to help the team achieve company goals.

Overview

1
1
Certification
14
14
years of professional experience

Work History

Agave AZ600 battery storage
10.2024
  • Started the construction of AZ600b4 for the APS electric company. Responsibilities on my side include accurate quantities of Logistics delivery, overseeing the civil part construction of the battery pad, overseeing the installation of underground conduit for multiple voltage sizes, MV, DC, LVIAC, overseeing the construction of concrete piers for battery storage, and concrete pads for PCS, helping and overseeing the activity of cable pull for multiple voltage such as MV, DC, LV/AC and Fiber Optic.

DEPCOM POWER
11.2022 - Current
  • Supervised a team of 200+ construction workers to maintain productivity and quality of work. Communicated daily with vendors to keep the project fully operational. Developed and implemented a quality control plan to guarantee the highest standards of workmanship. Kept sites compliant with OSHA, state, and local regulations to prevent unnecessary risks. Established and maintained relationships with vendors to source affordable and high-quality materials and equipment for construction projects.
  • Assisting the project manager and construction manager in keeping the 400MW battery station on track with the schedule and maintaining a steady and safe work environment.

Construction Manager

TX100 / 400b4 / sub-station
06.2025 - 05.2026
  • As the construction manager, my roles and responsibilities are to conduct a Pre-construction schedule feasible to work and meet the MC date, along with SC and FC. working side-by-side with the Project Manager, the Director of Construction, and the Assistant Construction Managers, 740 Acres of land to be designated for construction purposes, $380,000,00 project. Responsible for making sure Safety as a priority and Quality is first in line, day-to-day communication with El Paso Electric owner representatives, and daily weekly progress updates to senior management and owners, maintaining control of site manpower budget as well as material and equipment, and responsible for continuing stability of the construction site.

Assistant construction manager

DEPCOM POWER
02.2025 - 06.2025
  • Roles and responsibilities were to help the site team complete the installation of the last layer of civil to sub-grade, and start underground conduit installation. Helped with the ground grid perimeter and internal installation, overseeing the sub-contractor with the concrete forming and pouring for Battery Piers and pads for PCS installation.

Road runner AZ800b4
02.2024 - 08.2024
  • Overseeing the pre- construction with Senior management of a $180,000,00 construction, assisting with civil construction with civil sub-contractors, assisting with the underground construction of Medium Voltage to DC, LVIAC conduit installation, contribute to the receiving and installation of Battery Cells and Inverters ( PCS ). Working side by side with the Owner representatives for QA and installation with TEP standard and codes. Assisting with the pre-construction of the TEP substation for both Roadrunner 1 and 2.

Mechanical Superintendent

MYR-Energy Services
07.2020 - 09.2022
  • Provided emergency response to handle urgent breakdowns. Coordinated mechanical repair and maintenance activities for the solar job site. Developed standard operating procedures to encourage consistency of work from team members and contractors. Delegated team assignments, reviewed work, and set schedules to maintain optimal coverage of all mechanical needs. Evaluated existing procedures and made proactive adjustments to meet changing demands.

General Foreman

Mortenson Construction
10.2012 - 06.2019
  • Completed final walkthrough at job sites to close out projects. Worked alongside the team to accomplish work goals according to the schedule. Reviewed blueprints, specifications, and drawings to fully understand project scope ahead of time. Kept teams properly supplied with materials, tools, plans, and supplementary assistance to meet project deadlines. Planned each job with appropriate safety measures, addressing weight limits and fall protection. Performed job safety analysis daily to mitigate risks for all workers and visitors to job sites. Ordered necessary supplies and materials required for the installation of new work and remodeling of existing systems.
  • Prepared daily timecards and assisted in the preparation of estimates and scope of work statements. Delivered project updates to the superintendent and detailed issues that could halt work progress. Maintained cost-effective inventory of spare parts to help achieve production goals. Adhered to US Occupational Health and Safety Administration mandates requiring the use of gloves and insulating blankets for the installation of high-voltage equipment. Utilized heavy equipment to excavate, install, and backfill. Analyzed blueprints to determine where to run wires, install electrical outlets, and connect wires to central circuit panels.

Construction Foreman

Mortenson Construction
04.2015 - 11.2017
  • Supervised field crews to maximize quality and work efficiency. Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets. Coordinated materials to maintain a steady flow and meet productivity objectives. Maintained heavy equipment, tools, and machinery. Asserted control over material usage and contractor man-hours to keep projects in line with budgetary restrictions. Inspected work for compliance with applicable regulations and job specifications. Delegated assignments based on plans, project needs, and knowledge of individual team members. Verified and submitted team timesheets. Initiated an on-site safety program and properly trained team members to decrease injuries. Evaluated team member strengths and assigned tasks based on expertise and background. Handled issues with relative ease by implementing best practices and applying critical thinking skills to find the best solutions. Evaluated incoming materials for quality and amounts ordered. wrote weekly and 3-week look-ahead, also adjusting a comprehensive 90-day look-ahead production reports to help senior leadership make accurate operational plans and decisions.

Quality Control Inspector

Mortenson Construction
02.2013 - 03.2014
  • Communicated with production team members about quality issues. Performed visual inspections. Reported repeated issues to supervisors and other departments, collaborating to identify issue roots and rectify problems. Evaluated components and final products against quality standards and manufacturing specifications. Monitored performance and generated reports detailing the quality of the product and defect rates. Created and deployed best practices to improve efficiency and reduce defects. Monitored production processes to gain an understanding of problematic steps and rectify issues. Streamlined QA processes by working closely with development teams and staying abreast of changing product demands. Noted trends in product quality and functionality to determine problem areas and plan for improvements to processes. Studied blueprints and design specs to uphold best-in-class knowledge of solar products. Used hand tools, instruments, gauges, and equipment to complete accurate measurements and noted results for official records. Located and investigated production concerns and helped management implement corrective actions. Disposed of unsound and unsafe materials, products, and equipment to prevent inappropriate reuse.

Education

Project Management associate -

University of Arizona
05-2026

GED - undefined

Tucson Unified
Tucson, AZ
11-2006

Skills

  • Workforce Efficiency, Materials, and Labor Costing
  • Quality Control Programs: Hand and Power Tool Operation
  • Job Prioritizing Worker Training
  • Mechanical Assembly, Tool and Parts Inventory Oversight
  • Tool and Equipment Maintenance: Daily progress reports
  • Mechanical Drawings: Dependable and Consistent

Accomplishments

  • Managed a construction budget of more than $350,000,000 to $126,000,000
  • Managed the construction of a 750+ acres of Photovoltaic solar sites and Battery storage /W substations.
  • Used Microsoft Excel to develop inventory tracking spreadsheets.

Certification

OSHA10, OSHA30, FIRST AID AND CPR. STORMWATER POLLUTION PREVENTION PLAN CERTIFIED. NFP70E

LANGUAGES

Spanish English
Native or Bilingual Native or Bilingual

EQUIPMENT OPERATOR

  • Skidsteer w/ bucket or forks teleskid
  • 5k forklift
  • 10k , 12k , 15k , 30k forklift
  • Post install equipment such as VERMEER'S, ORTECO'S
  • Backhoes, Ganon's, excavators, loaders, etc.

Timeline

Construction Manager

TX100 / 400b4 / sub-station
06.2025 - 05.2026

Assistant construction manager

DEPCOM POWER
02.2025 - 06.2025

Agave AZ600 battery storage
10.2024

Road runner AZ800b4
02.2024 - 08.2024

DEPCOM POWER
11.2022 - Current

Mechanical Superintendent

MYR-Energy Services
07.2020 - 09.2022

Construction Foreman

Mortenson Construction
04.2015 - 11.2017

Quality Control Inspector

Mortenson Construction
02.2013 - 03.2014

General Foreman

Mortenson Construction
10.2012 - 06.2019

GED - undefined

Tucson Unified

Project Management associate -

University of Arizona
Robert Perez Velasquez