Summary
Overview
Work History
Education
Skills
Work Availability
Quote
Timeline
Receptionist
Robert Williams

Robert Williams

Painter
Hattiesburg,MS

Summary

Adaptable Lead Painter with proven track record of completing jobs on time and under budget. Focused leader willing to give clear, concise directions to others. Motivated Painter driven to provide high-quality work. Adept at working quickly without sacrificing results. Ready to bring Number years' experience to new position with long-term potential. Dependable worker dedicated to completing projects on time and surpassing quality expectations. Skillfully uses variety of tools and machinery for addressing unique installation and repair requirements. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level Job Title position. Ready to help team achieve company goals.

Overview

17
17
years of professional experience

Work History

Lead Painter

Bryan Johnson
Sumral, MS
03.2005 - 02.2017
  • Primed, painted, varnished and lacquered walls and surfaces.
  • Inspected completed work for adherence to very strict guidelines and highest quality standards.
  • Provided supervisor with daily status report on all job tasks and workers' duties.
  • Executed work orders for painting team as part of larger project schedule.
  • Corrected surface imperfections by filling cracks, holes and joints.
  • Trained new staff on initial setup routines and continual work monitoring procedures.
  • Conducted final work check to assess quality and make corrections if necessary.
  • Used airless sprayers, rollers, brushes and other painting tools to accomplish job tasks.
  • Selected appropriate type of paint and other materials for specific surfaces.
  • Interacted with clients to report progress and verify timetable for completed work.
  • Performed regular preventive maintenance on tools and equipment to support best quality of work.
  • Mixed paint, varnish, shellac and lacquer to desired consistencies.
  • Calculated accurate amounts of materials and estimated time for planned jobs.
  • Prepared surfaces for painting or staining by removing old paint and applying primers.

Professional Painter

John Kavanagh Construction
Hattiesburg, MS
03.2003 - 04.2005
  • Removed fixtures such as pictures, doorknobs, lamps, and electric switch covers prior to painting.
  • Selected premixed paints or mixed required portions of pigment, oil and thinning and drying substances to prepare paint to match specified colors.
  • Used brushes, spray guns and paint rollers to paint surfaces.
  • Used sandpaper to scrape walls and other surfaces to remove old paint.
  • Completed interior and exterior painting for variety of residential and commercial clients.
  • Met with clients to discuss color and finish options and other design details.
  • Mixed, matched and blended colors to produce desired effects.
  • Trained new staff on initial setup routines and continual work monitoring procedures.
  • Used airless sprayers, rollers, brushes and other painting tools to accomplish job tasks.

Painter

Grover Painting
Purvis , MS
01.2000 - 02.2003
  • Repaired wall holes and scrapes.
  • Painted surfaces using brushes, spray guns, and paint rollers.
  • Prepared surfaces and surrounding areas for painting using sandpaper, tape, and other materials.
  • Protected surfaces from damage and spills by using drop cloths prior to and during painting.
  • Worked holidays and weekends depending on shifting needs of project.
  • Operated power sprayers and hand tools to prepare and paint large areas.
  • Prepared trim, walls and ceilings for painting by cleaning, smoothing, and priming.
  • Climbed scaffolding, staging, ladders, and planks to reach work area surfaces and observed safety protocols to prevent falls.
  • Applied putty, wood filler, spackling, and caulks to prep uneven surfaces and fill in holes.
  • Painted indoor areas such as hallways, bathrooms, and lobbies.
  • Applied primer, paints, varnishes and lacquers to walls and surfaces using traditional and sprayer methods.
  • Evaluated completed work for quality and adherence to standards and client requirements.
  • Calculated amount of paint and other materials needed for each job accurately.
  • Calculated accurate amounts of materials and estimated time for planned jobs.

Education

Hattiesburg High School
Hattiesburg, MS
06.1999

Skills

  • Site Safety
  • Surface Preparation
  • Spot Painting Techniques
  • Interior Painting
  • Crew Oversight
  • Safety Rules
  • Written and Verbal Instructions
  • Project Deadlines
  • Daily Progress Reports
  • Spray Finishing Techniques
  • Heavy Lifting
  • Paint Viscosity
  • Surface Repair
  • Paint Application
  • Hole Cleaning
  • Material Disposal
  • Painter Assistance
  • Daily Audits
  • Power Washer
  • Material Inventory
  • Procedure Preparation
  • Commercial Property
  • Scaffold Installation
  • Team Supervision
  • Color Matching
  • Service Calls
  • Painting Procedures
  • Proper Equipment Usage
  • Hazardous Materials Management
  • Inspecting Completed Work
  • Protective Equipment Knowledge
  • Finish Sanding
  • Commercial Projects
  • Job Assignments
  • Production Planning
  • Ventilation Systems
  • Customer Project Planning
  • Maintaining Clean Work Areas
  • Fixture Removal and Attachment
  • Hydro and Sandblasting
  • Drywall Installation and Taping
  • Faux Finishing
  • Structural Painting
  • Respirator Operation
  • Sponging and Ragging
  • Caulk Application
  • Defect Repair
  • Color and Pattern Coordination
  • Stucco Patching
  • Special Coating Application
  • Industry Trends
  • Wood Sealing
  • Wallpaper Installation and Alignment
  • Surface Smoothing
  • Venetian Finishes
  • Primer Application
  • Aerial Lift Rigging

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Quote

Every day of our lives we are on the verge of making those changes that would make all the difference.
Mignon McLaughlin

Timeline

Lead Painter

Bryan Johnson
03.2005 - 02.2017

Professional Painter

John Kavanagh Construction
03.2003 - 04.2005

Painter

Grover Painting
01.2000 - 02.2003

Hattiesburg High School
Robert WilliamsPainter