I have a well rounded skill set in OSHA requirement and honed talents in safety awareness and electrical experience , making me an ideal fit for Solar electrical positions. Im an expert in communication and an communicative collaborator. My previous roles have strengthen my capabilities in leadership and observations including a keen attention to detail.
Overview
4
4
years of professional experience
Work History
Electrician Helper
Primoris Services Corp
Louisiana/Arkansas/Illinois/Texas
01.2022 - 12.2024
Pulled wire through conduits
Helped complete system installations, digging trenches, and running cable
Organized materials and tools in to maintain clean and neat work areas.
Run underground DC,Labeling each circuit correctly
Phase each circuit before terminating
Terminate LBD and Inverter DC
Strip cable to its exact measurement then add ground and Crimp and land on its busbar
Run underground MV/AC running each phase while color coordinated from Inverter to Inverter or Junction Box to Junction box or Inverter to Junction box
Install Cab-line,Making sure cab line is tensioned up correctly
Inverter Roughins , using the right conduit , cutting it to its measurement and making sure everything lands the way its supposed to
Motor terminations , terminating power and contorl, which controls how the panels will turn and power and communicate with the panels
Improved workplace organization by maintaining a clean and hazard-free environment for all team members during projects.
(MV Terminator helper)
gather kits , route cable , get your center mark , go 13 inches down from your center mark , get your mark then do your jacket cut ,strip the jacket to its ring cut , apply MAS tape , then ring all your concentrics down form nice and neatly and apply your 2nd layer of MAS tape, PHASE after , get your measurement from the top of the jacket cut to the semicon which is 2 inches and a half , measure your lug and use your big block to strip clean repetitively, chamfer the top of the insulation add lug and start to sheer the bolts , apply adapter and Tbody
Consistently followed safety procedures when operating power tools, minimizing risk of injury among team members.
Electrician Helper
Borrego Solar Systems
South Dakota
06.2021 - 11.2021
Gathered supplies, and tools to prepare for each workday or new task
Followed safety procedures to maintain a safe work environment.
Used hand and power tools to cut, bend and shape wires.
Ran underground DC and Fiber
Ran underground Mv/Ac
Terminated DC at the LBDs
Learned to be a team lead installing cable trays and forming the cables onto the tray to prep for terminations
Loaded and unloaded tools, materials and equipment from work trucks and storage containers.
Solar Panel Installer
Bechtel
Richmond Texas
03.2021 - 06.2021
Developed efficient installation techniques to decrease labor time.
Evaluated potential risks and challenges related to solar panel installations, implementing appropriate solutions to minimize issues.
install each panel by hand with a set of crew
torque each bold to its spec and torque mark at the end