Served as Carpenter Foreman and lead builder on high-profile commercial construction projects involving complex architectural and engineering requirements. Recognized as a go-to resource for specialized framing and finish work.
Led highly specialized acoustic ceiling installations, custom framing, and other precision commercial construction scopes, ensuring compliance with stringent design specifications and architectural intent.
Directed off-site pre-manufacturing of complex framing systems in a warehouse environment, coordinating fabrication, logistics, and crane-set installation on active job sites. Successfully translated engineered drawings into buildable, real-world solutions.
Managed end-to-end modular framing projects — from detailed planning and prefabrication through field assembly — resolving fitment challenges and sequencing issues to achieve seamless on-site integration with minimal adjustments.
Demonstrated strong problem-solving and spatial reasoning by anticipating field conditions, coordinating trades, and delivering projects that fit and performed as designed, resulting in smooth installations and high client satisfaction."I worked as a Carpenter Foreman and lead builder specializing in complex commercial construction projects. I was frequently the go-to person for jobs with demanding engineering and architectural requirements. My experience includes highly specialized framing, custom acoustic ceiling systems, and other precision finish work.
One of my key strengths is managing sophisticated prefabricated framing solutions. On several projects, we built intricate framing assemblies in a warehouse, shipped them to the site, and set them by crane. I was responsible for organizing the entire process — ensuring accurate fabrication, proper sequencing, and flawless field fit. This required close coordination with engineers, architects, and the installation crew, along with the ability to anticipate and solve real-world challenges before they reached the job site. These projects went together smoothly and met the high tolerances required."
Managing materials
Worksite safety
Crew oversight
Project management
Task delegation
Workload planning
Site monitoring
Site coordination
Construction scheduling
Report writing
Task prioritization
Building codes
Quality controls
Company safety policies
OSHA trained
Change orders
Reviewing timesheets
Materials management
Value engineering
Specification reading
Construction software-procore
Meeting schedule deadlines
Checking equipment
Materials coordination
Construction quality assurance
Crew leadership
Decision-making
Teamwork and collaboration
Commercial construction experience
Attention to detail
Employee training
Work Planning and Prioritization
Led highly specialized commercial framing and architectural projects as the go-to carpenter foreman.
Managed prefabrication and installation of complex framing systems for Ozark Innovative Dental, overseeing the entire shop build before shipping and crane-setting the structure on site. Served as shop manager directing fabrication, logistics, and field coordination.
Directed specialized framing and high-performance acoustic ceiling installation for Nixa Junior High Auditorium, delivering precision acoustical work designed for live performances. This project received recognition in industry publications.
Also led the technically demanding framing scope for Wonderworks, executing intricate architectural framing to meet strict engineering requirements.