Assembly
8 MonthsDexter Axle | Albion, IN | 03.2026 - 11.2026
Completed kit assembly according to work orders and packing instructions for warehouse operations.
- Guided kit assembly completion with detailed instructions.
- Verified parts met applicable requirements before assembly work through standards reviews.
- Damage, missing-item, and assembly checks supported kit accuracy.
- Validated parts and assemblies to improve accuracy.
- Defect checks before assembly supported final product quality.
- Stage-by-stage quality checks confirmed accuracy of assembled kits.
- Checked visual and mechanical details against customer specifications.
- Addressed minor mechanical issues during assembly process.
- Maintained safe assembly operations through careful tool use and safety compliance.
- Kept work area clean and organized to support safety protocols at all times.
- Refuse removal and tool organization maintained a safe work environment.
- Managed supply control and workstation organization to maintain production flow.
- Shared process issues and concerns with supervisor during assembly operations.
- Trained coworkers on company-standard kit assembly methods.
- Strong onboarding support improved new assembly technician readiness on correct assembly methods and workflow expectations.
- Used item labels and location codes to select inventory and support accurate picking.
- Managed placement of materials and items to maintain organized storage flow.
Lighting Assembly
11 MonthsGroup Dekko | Garrett, Indiana | 03.2025 - 02.2026
- Produced wired harnesses and terminal connections from blueprints with accurate fit.
- Delivered assembled electrical components using hand and power tools.
- Produced tested assembled units using meters and test equipment.
- Reduced risk of future electrical failures by checking and testing finished installations.
- Supported quality control through detailed documentation of wiring installation tests.
- Maintained part quality by spotting defects and verifying proper fit.
- Restored defective units through replacement of faulty parts.
- Preserved specification compliance by isolating and removing defective parts.
- Protected team safety through strict use of electrical tools and equipment.
- Sustained production rates through technical and electrical expertise on each piece.
- Advanced new product development through close work with engineers from concept through completion.
- Kept inventory records accurate through component tagging and usage tracking.
- Drove process improvements by presenting production and problem-solving suggestions to supervisors.
Call Center Representative
1 MonthE-Collar Technologies | Garrett, IN | 01.2025 - 02.2025
Assembly Line Production Worker
1 MonthAutokiniton | Auburn, IN | 11.2024 - 12.2024
Painter
3 MonthsSamson Exhaust | Avilla, Indiana | 08.2024 - 11.2024
- Delivered exhaust component painting to Samson exhaust finish standards using shop spray equipment.
- Created ready-to-coat metal surfaces through sanding, cleaning, and masking.
- Matched paint color and texture requirements through careful mixing.
- Produced smooth coating mixtures by combining coatings and thinners correctly.
- Achieved quality paint coverage by inspecting parts for drips and surface defects.
- Followed manufacturer instructions for chemical mixing on special applications.
- Maintained spray guns, hoses, and painting area after each shift.
- Supported safe ventilation while working with solvents or oil-based paints.
- Reduced safety risks through careful handling of solvents, paint, and shop materials.
- Protected self with masks, respirators, gloves, and other protective clothing.
- Managed paint supplies, ordered replacements when needed, and disposed of old paint properly.
Assembly
2 MonthsParker Hannifan Corp. | Albion, IN | 06.2024 - 08.2024
Painter
10 MonthsRhinehart Finishing | Spencerville, Indiana | 11.2022 - 09.2023
- Delivered component painting to finish standards using shop spray equipment.
- Achieved quality paint coverage by inspecting parts for drips and surface defects.
- Maintained spray guns, hoses, and painting area after each shift.
- Supported safe ventilation while working with solvents or oil-based paints.
- Reduced safety risks through careful handling of solvents, paint, and shop materials.
- Protected self with masks, respirators, gloves, and other protective clothing.
- Apply primer and finish coats with precision.
Assembly Line Worker
2 Years 3 MonthsTRIN | Ashley, IN | 05.2020 - 08.2022