Overview
Work History
Education
Timeline
Assembly

Ruth Sarasien

Dexter Axle
Auburn,IN
7
years of professional experience

Work History

Assembly

8 Months
Dexter Axle | Albion, IN | 03.2026 - 11.2026

Completed kit assembly according to work orders and packing instructions for warehouse operations.

  • Guided kit assembly completion with detailed instructions.
  • Verified parts met applicable requirements before assembly work through standards reviews.
  • Damage, missing-item, and assembly checks supported kit accuracy.
  • Validated parts and assemblies to improve accuracy.
  • Defect checks before assembly supported final product quality.
  • Stage-by-stage quality checks confirmed accuracy of assembled kits.
  • Checked visual and mechanical details against customer specifications.
  • Addressed minor mechanical issues during assembly process.
  • Maintained safe assembly operations through careful tool use and safety compliance.
  • Kept work area clean and organized to support safety protocols at all times.
  • Refuse removal and tool organization maintained a safe work environment.
  • Managed supply control and workstation organization to maintain production flow.
  • Shared process issues and concerns with supervisor during assembly operations.
  • Trained coworkers on company-standard kit assembly methods.
  • Strong onboarding support improved new assembly technician readiness on correct assembly methods and workflow expectations.
  • Used item labels and location codes to select inventory and support accurate picking.
  • Managed placement of materials and items to maintain organized storage flow.

Lighting Assembly

11 Months
Group Dekko | Garrett, Indiana | 03.2025 - 02.2026
  • Produced wired harnesses and terminal connections from blueprints with accurate fit.
  • Delivered assembled electrical components using hand and power tools.
  • Produced tested assembled units using meters and test equipment.
  • Reduced risk of future electrical failures by checking and testing finished installations.
  • Supported quality control through detailed documentation of wiring installation tests.
  • Maintained part quality by spotting defects and verifying proper fit.
  • Restored defective units through replacement of faulty parts.
  • Preserved specification compliance by isolating and removing defective parts.
  • Protected team safety through strict use of electrical tools and equipment.
  • Sustained production rates through technical and electrical expertise on each piece.
  • Advanced new product development through close work with engineers from concept through completion.
  • Kept inventory records accurate through component tagging and usage tracking.
  • Drove process improvements by presenting production and problem-solving suggestions to supervisors.

Call Center Representative

1 Month
E-Collar Technologies | Garrett, IN | 01.2025 - 02.2025

Assembly Line Production Worker

1 Month
Autokiniton | Auburn, IN | 11.2024 - 12.2024

Painter

3 Months
Samson Exhaust | Avilla, Indiana | 08.2024 - 11.2024
  • Delivered exhaust component painting to Samson exhaust finish standards using shop spray equipment.
  • Created ready-to-coat metal surfaces through sanding, cleaning, and masking.
  • Matched paint color and texture requirements through careful mixing.
  • Produced smooth coating mixtures by combining coatings and thinners correctly.
  • Achieved quality paint coverage by inspecting parts for drips and surface defects.
  • Followed manufacturer instructions for chemical mixing on special applications.
  • Maintained spray guns, hoses, and painting area after each shift.
  • Supported safe ventilation while working with solvents or oil-based paints.
  • Reduced safety risks through careful handling of solvents, paint, and shop materials.
  • Protected self with masks, respirators, gloves, and other protective clothing.
  • Managed paint supplies, ordered replacements when needed, and disposed of old paint properly.

Assembly

2 Months
Parker Hannifan Corp. | Albion, IN | 06.2024 - 08.2024

Painter

10 Months
Rhinehart Finishing | Spencerville, Indiana | 11.2022 - 09.2023
  • Delivered component painting to finish standards using shop spray equipment.
  • Achieved quality paint coverage by inspecting parts for drips and surface defects.
  • Maintained spray guns, hoses, and painting area after each shift.
  • Supported safe ventilation while working with solvents or oil-based paints.
  • Reduced safety risks through careful handling of solvents, paint, and shop materials.
  • Protected self with masks, respirators, gloves, and other protective clothing.
  • Apply primer and finish coats with precision.

Assembly Line Worker

2 Years 3 Months
TRIN | Ashley, IN | 05.2020 - 08.2022

Education

High School Diploma

Dekalb High School | Waterloo, IN | 06-2009

Timeline

Assembly

Dexter Axle
03.2026 - 11.2026Read More

Lighting Assembly

Group Dekko
03.2025 - 02.2026Read More

Call Center Representative

E-Collar Technologies
01.2025 - 02.2025Read More

Assembly Line Production Worker

Autokiniton
11.2024 - 12.2024Read More

Painter

Samson Exhaust
08.2024 - 11.2024Read More

Assembly

Parker Hannifan Corp.
06.2024 - 08.2024Read More

Painter

Rhinehart Finishing
11.2022 - 09.2023Read More

Assembly Line Worker

TRIN
05.2020 - 08.2022Read More

Dekalb High School

High School Diploma
Read More
Ruth Sarasien