Summary
Overview
Work History
Education
Skills
Timeline
Generic

SAMUEL MIRANDA PEREGRINO

Gaffney,Sc

Summary

PROFESSIONAL SUMMARY PROFESSIONAL SUMMARY PROFESSIONAL SUMMARY PROFESSIONAL SUMMARY

Overview

14
14
years of professional experience

Work History

Electrical Technician

Airadingm solutions.
New Hampshire, Ohio
10.2024 - Current
  • Check with the customer. Make sure all the equipment is working and make any repairs as need it. Replace it. Exhaust fan and supply fan add new sensors and temperature sensors for Energy efficiency. Make sure the customer signed for a Finish complete job
  • 208V three phase and single phase provide for the equipment, and replace it all the breakers on the panel to meet the requirements for inspection.

Electrical Supervisor

Dematic Corporation
Grand Rapids, Michigan
11.2018 - 09.2024
  • Supervisor
  • Management all people and budget According to the time and deadlines to get the project done on time.
  • Read blueprints and get with the engineering. If any red lines or any update has to be done before the job starts and make sure Material is ready when I get to the job site.
  • Pull wires
  • Install all DCP / BIO / E-stop / disconnectors/ EZT's
  • Run 8 inches Cable tray for the 480 Power to the panel
  • Panel termination Based on a blueprints
  • Run 6 inch cable tray for that 24 low voltage
  • Run 8 inch cable tray for all the ethernet cables
  • Run ethernet cables base on a blueprint
  • Lead 11 people based on a job need
  • Inventory at a daily material need
  • Drive forklift, scissor lift, and boom lift
  • Panel installation
  • Provide my own equipment lead
  • Safe travel
  • OSHA 30
  • Inventory Company Material back to the Trailer Daily
  • Run 1/2, 3/4 and 1 inc ENT conduit

Electrician

Griffin Electric
Charlote, NC
03.2018 - 11.2018
  • Run ENT conduit IP TO 3 inch
  • Pull wire
  • Connect outlets and switches
  • Read blueprints and layout
  • Lead six people based on a job need
  • Fire alarm
  • Terminations low and high voltage
  • Troubleshoot
  • Drive scissor lift
  • Drive a boon lifts and forklift

Electrician

Gaylor electrician
07.2016 - 02.2018
  • Run cable 6-8-10-12-14-16-18 Pipe fitting
  • Termination low and high Voltage
  • Travel safe and have my own tools need & testing tools
  • Run cable tray, Basket tray
  • Run pipe ENT and Rigit conduit
  • Pull wires
  • Osha 30
  • Read blueprints
  • Planned project work based on blueprints
  • Run Fire alarm
  • Regular in emergency lights
  • Drive a forklift, boom lift and scissor lift

Electrician

MMR group
03.2014 - 06.2016
  • Read blueprints and technical documentation to correctly install and repair electrical systems
  • Diagnosed and repaired problems with equipment and related electrical components
  • Evaluated electrical systems to check maintenance, design, and performance
  • Reviewed designs to identify solutions for common and advanced electrical problems
  • Directed and trained workers to install, maintain, and repair electrical wiring, equipment, and fixtures
  • Planned project work based on blueprint
  • Laid out wiring, boxes and other components to efficiently install new systems
  • Running pipe
  • Basket tray, cable tray installer
  • Install panel, low voltage terminations
  • Travel safely have my own tools
  • Blueprints read in installing
  • Operate forklift, boom lift, scissor lift safely
  • Have my OSHA 30

Electrician

Fluor
07.2011 - 11.2014
  • Running cables, running conduit, wire pulling, pull cable 750/500 run
  • Cable tray, run pipe ENT & Rigit conduit, travel safe
  • I have my own tools needed electrician Tools and testing tools
  • Read blueprints in Installing what is needed
  • Operate scissor lift, boom lift, forklift
  • OSHA 30
  • Supervisor assistant

Education

COMPUTER DEGREE - computer program

Tecnológico ceci
Mexico, Ver
09.1998

Skills

  • Bilingual Spanish and English
  • Self starter
  • Forklift operator
  • Scissor lift operator
  • Boom lift operator
  • Blueprint reading
  • Low voltage
  • High voltage
  • Pull wires
  • Panel installation
  • Cable tray
  • Basket tray
  • Terminations
  • Rigid conduit
  • ENT conduit
  • Install equipment
  • Layout wiring
  • Follow blueprints
  • Verbal communication
  • Vehicle operation
  • IO system
  • PLC cabling
  • Bending fight
  • Troubleshooting
  • Motor and switch gearbox
  • Fire alarm
  • Emergency lights
  • Regular lights

Timeline

Electrical Technician

Airadingm solutions.
10.2024 - Current

Electrical Supervisor

Dematic Corporation
11.2018 - 09.2024

Electrician

Griffin Electric
03.2018 - 11.2018

Electrician

Gaylor electrician
07.2016 - 02.2018

Electrician

MMR group
03.2014 - 06.2016

Electrician

Fluor
07.2011 - 11.2014

COMPUTER DEGREE - computer program

Tecnológico ceci
SAMUEL MIRANDA PEREGRINO