PROFESSIONAL SUMMARY PROFESSIONAL SUMMARY PROFESSIONAL SUMMARY PROFESSIONAL SUMMARY
Overview
14
14
years of professional experience
Work History
Electrical Technician
Airadingm solutions.
New Hampshire, Ohio
10.2024 - Current
Check with the customer. Make sure all the equipment is working and make any repairs as need it. Replace it. Exhaust fan and supply fan add new sensors and temperature sensors for Energy efficiency. Make sure the customer signed for a Finish complete job
208V three phase and single phase provide for the equipment, and replace it all the breakers on the panel to meet the requirements for inspection.
Electrical Supervisor
Dematic Corporation
Grand Rapids, Michigan
11.2018 - 09.2024
Supervisor
Management all people and budget According to the time and deadlines to get the project done on time.
Read blueprints and get with the engineering. If any red lines or any update has to be done before the job starts and make sure Material is ready when I get to the job site.
Pull wires
Install all DCP / BIO / E-stop / disconnectors/ EZT's
Run 8 inches Cable tray for the 480 Power to the panel
Panel termination Based on a blueprints
Run 6 inch cable tray for that 24 low voltage
Run 8 inch cable tray for all the ethernet cables
Run ethernet cables base on a blueprint
Lead 11 people based on a job need
Inventory at a daily material need
Drive forklift, scissor lift, and boom lift
Panel installation
Provide my own equipment lead
Safe travel
OSHA 30
Inventory Company Material back to the Trailer Daily
Run 1/2, 3/4 and 1 inc ENT conduit
Electrician
Griffin Electric
Charlote, NC
03.2018 - 11.2018
Run ENT conduit IP TO 3 inch
Pull wire
Connect outlets and switches
Read blueprints and layout
Lead six people based on a job need
Fire alarm
Terminations low and high voltage
Troubleshoot
Drive scissor lift
Drive a boon lifts and forklift
Electrician
Gaylor electrician
07.2016 - 02.2018
Run cable 6-8-10-12-14-16-18 Pipe fitting
Termination low and high Voltage
Travel safe and have my own tools need & testing tools
Run cable tray, Basket tray
Run pipe ENT and Rigit conduit
Pull wires
Osha 30
Read blueprints
Planned project work based on blueprints
Run Fire alarm
Regular in emergency lights
Drive a forklift, boom lift and scissor lift
Electrician
MMR group
03.2014 - 06.2016
Read blueprints and technical documentation to correctly install and repair electrical systems
Diagnosed and repaired problems with equipment and related electrical components
Evaluated electrical systems to check maintenance, design, and performance
Reviewed designs to identify solutions for common and advanced electrical problems
Directed and trained workers to install, maintain, and repair electrical wiring, equipment, and fixtures
Planned project work based on blueprint
Laid out wiring, boxes and other components to efficiently install new systems
Running pipe
Basket tray, cable tray installer
Install panel, low voltage terminations
Travel safely have my own tools
Blueprints read in installing
Operate forklift, boom lift, scissor lift safely
Have my OSHA 30
Electrician
Fluor
07.2011 - 11.2014
Running cables, running conduit, wire pulling, pull cable 750/500 run
Cable tray, run pipe ENT & Rigit conduit, travel safe
I have my own tools needed electrician Tools and testing tools