Component Maintenance Optimization Manager
TVA Watts Bar Nuclear Plant
05.2018 - Current
Lead team of Managers, Engineers, and Maintenance Specialists to safely optimize plant equipment performance by using predictive/preventative technologies in parallel with facilitating maintenance reliability programs
Manage service, repair, replacement, and testing of critical safety related equipment through Appendix B qualified sources
Support site in multiple management outage roles to help safely and effectively complete refuel and forced outages
Fill in for site maintenance director as needed
Serve in a duty rotation role as maintenance director and emergency response Operations Support Center manager
Component Engineer
TVA Watts Bar Nuclear Plant
12.2014 - 05.2018
Served as a nuclear qualified engineer in Component Maintenance Optimization (CMO) to lead equipment reliability programs for electric motors, circuit breakers, steam turbines, and generators
Responsible for developing and maintaining quality maintenance procedures for plant equipment
Served as WBN interim CMO department manager (in temporary D-level Engineer position)
Actively participated in industry component user groups and other industry events
Performed offsite vendor observations to ensure quality repair of WBN components
Maintenance Manager
TVA Kingston Power Plant
10.2012 - 12.2014
Managed all aspects of facility and equipment maintenance of a 1520 MW, 9 unit, coal fired power plant
Provided leadership to build consistent employee engagement and to improve safety culture to achieve solid human performance results with top quartile plant reliability
Managed 118 management and union represented employees and all site support contractors
Managed $20M yearly budget to within .2% of fiscal year target
Filled in as Plant Manager
Served as the first TVA multisite maintenance manager for Kingston and Bull Run power plants
Operations Manager
TVA Kingston Power Plant
10.2010 - 10.2012
Managed all aspects of safe operation of a 1520 MW, 9 unit, coal fired power plant
Managed $18M annual budget within 0.3% annually
Coordinated all emergency response activities for Kingston Plant as Emergency Response Director
Represented TVA in community meetings s as a part of ash spill recovery and plant start up
Proceduralized, staffed, and successfully brought new FGD scrubbers, sludge dewatering, and dry fly ash evacuation facilities into commercial operation to meet environmental compliance requirements
Filled in as Plant Manager
Maintenance Manager
AEP Philip Sporn Plant
08.2007 - 10.2010
Safely managed all aspects of instrument, environmental, electrical, planning, and mechanical departments and contractor personnel at 1100 MW, 5 unit, coal fired power plant facility
Managed maintenance department $13M budget within 0.5% of target each year
Selected as in accelerated development leader and completed program
Completed three-year term on the “Open Mike” employees in bi-monthly meetings with CEO Michael Morris as a selected delegate to communicate employee concerns with CEO and help cast CEO vision with employees
System Owner Senior
AEP Conesville Plant
04.2006 - 08.2007
Lead project team to redesign and rebuild flue gas SO2 scrubbers and associated equipment that increased S02 removal efficiency from 92% to 99% at a cost of approximately $5.5M
Worked with budgeting personnel to allocate proper funding and associated spend for FGD processes which averaged $12M/year
Served as Clearance System Administrator at Conesville Plant by managing eSOMS software to ensure system integrity and employee compliance
Operations Team Leader (Shift Manager)
AEP Conesville Plant
10.2004 - 04.2006
Made critical safety, environmental, operational, reliability, and personnel decisions as sole on-shift operations manager for the 2000 MW, 6 unit, power plant
Safely and efficiently managed five exempt supervisors and associated hourly, union represented, employees on energy production rotating team
Coordinated and managed all substation switching with transmission operations
Production Support Leader (Supervisor)
AEP Conesville Plant
04.2000 - 10.2004
Performed all leadership duties in role of First Line Supervisor in Electrical and Instrument Maintenance
Safely and effectively managed and developed Instrument and Electrical and Instrument Control Technicians
Managed maintenance online and outage work schedules
Plant Engineer
AEP Conesville Plant
01.1997 - 04.2000
Managed maintenance along with Capital and O&M projects for all plant equipment including motors, pumps, circuit breakers, transformers, & cables
Supported plant equipment on a 24/7 emergency callout basis
Served as project manager to mechanically rebuild and electrically upgrade three 2.5 MW diesel generators to enable successful ‘black start' capability for three generating units
Education
Masters of Business Administration (MBA) -
University of Phoenix
2007
Bachelor of Science - Electrical Engineering
Ohio University
1995
Skills
Passionate about Health and Safety and active with associated programs and processes
Unwavering commitment to personal and corporate ethical behavior to consistently do the right things for the right reasons
Effective in building strong relationships across organizations
Experienced with managing engineering, maintenance, and operational professionals
Solid presenter and communicator to local, corporate, public and government personnel
Exceptional technical ability to learn regulations, procedures, equipment, and processes
Well trained and experienced in safety, finance, technical, and environmental issues
Community focused and involved with activities to "give back"
Timeline
Component Maintenance Optimization Manager
TVA Watts Bar Nuclear Plant
05.2018 - Current
Component Engineer
TVA Watts Bar Nuclear Plant
12.2014 - 05.2018
Maintenance Manager
TVA Kingston Power Plant
10.2012 - 12.2014
Operations Manager
TVA Kingston Power Plant
10.2010 - 10.2012
Maintenance Manager
AEP Philip Sporn Plant
08.2007 - 10.2010
System Owner Senior
AEP Conesville Plant
04.2006 - 08.2007
Operations Team Leader (Shift Manager)
AEP Conesville Plant
10.2004 - 04.2006
Production Support Leader (Supervisor)
AEP Conesville Plant
04.2000 - 10.2004
Plant Engineer
AEP Conesville Plant
01.1997 - 04.2000
Masters of Business Administration (MBA) -
University of Phoenix
Bachelor of Science - Electrical Engineering
Ohio University
Similar Profiles
William LinkWilliam Link
Lead Licensed Operator Instructor at TVA Sequoyah Nuclear PlantLead Licensed Operator Instructor at TVA Sequoyah Nuclear Plant