Hardworking and detail-oriented management professional with several years of hands-on experience overseeing construction projects from start to finish. Skilled in managing teams of up to 10 individuals and ensuring that projects are completed on time and on budget. Proven track record of successful project completion with minimal errors.
Work History
Senior Mechanical Technician
1 Year 5 Months
KENTECH | 12.2024 - 05.2026
Operated and maintained mechanical systems for diverse projects at KENTECH.
Inspected equipment to ensure compliance with safety and quality standards.
Collaborated with engineering teams to troubleshoot mechanical issues effectively.
Documented maintenance activities and equipment performance for reporting purposes.
Assisted in the development of standard operating procedures for mechanical tasks.
Provided technical support to other departments as needed.
Adhered to safety protocols while working with hazardous materials.
Evaluated existing processes for efficiency improvements.
Implemented quality control procedures to ensure high-quality products are produced efficiently and safely.
Performed preventive maintenance and troubleshooting on mechanical systems, equipment, and components.
Communicated effectively with customers regarding service issues or concerns.
Inspected, tested, adjusted, calibrated, and repaired mechanical systems and components.
Maintained a clean work environment by properly disposing of waste material generated from repairs.
Conducted repair work to restore functionality of mechanical systems and components.
Analyzed test results to determine root cause of system malfunctions.
Demonstrated expertise in the use of hand tools such as wrenches, pliers, screwdrivers.
Tested newly installed machines prior to their implementation into production.
Repaired or replaced defective parts as necessary.
Maintained accurate records of all repairs performed.
Diagnosed mechanical problems and determined solutions to correct concerns.
Trained junior technicians on proper maintenance techniques for various machines.
Developed technical drawings for new or modified designs using CAD software.
Installed new machinery and equipment according to manufacturer's specifications.
Operated pressure pumps, air electrical equipment and mechanical equipment.
Collaborated with team members, lending mechanical expertise to meet team goals.
Fabricated mechanical components consistent with engineering specifications for efficiency.
Supported continuous improvement efforts to improve efficiency and productivity of maintenance technicians.
Troubleshot, diagnosed, and repaired engineering equipment.
Generated failure reports and corrective measures on incidents to decrease and prevent failures.
Pipe and Mechanical Consultant
5 Months
OCI-Global | 07.2024 - 12.2024
Organized meetings between stakeholders to discuss project details and timelines.
Developed and implemented customized strategies to meet client needs.
Created comprehensive reports on project progress and results for clients.
Provided advice on operational processes, business development initiatives, organizational changes and other areas of improvement.
Collaborated with clients to develop action plans to address specific challenges and objectives.
Advised senior management on strategic planning, financial forecasting, budgeting, operations optimization, organizational design, process reengineering .
Superintendent
6 Months
State Service | 06.2023 - 12.2023
Overseeing hydro and pneumatic testing on compressor stations.
Pipeline hydro testing.
Planned, managed and coordinated construction activities to ensure timely completion of projects.
Supervised staff including subcontractors and laborers on assigned projects.
Reviewed project proposals, estimates, schedules and contracts related to the project.
Ensured that all subcontractors are in compliance with contract documents by conducting regular inspections of their workmanship.
Coordinated material procurement processes with suppliers while ensuring timely delivery of materials at job sites.
Startup Commissioning Supervisor
10 Months
Yates Construction | 06.2022 - 04.2023
Maintained up-to-date records of all work performed related to commissioning process
Provided training to personnel on proper use of newly commissioned systems and equipment
Coordinated activities between various departments involved in the commissioning process
Implemented preventive maintenance programs for newly commissioned systems and equipment
Conducted root cause analysis on technical issues in order to identify and resolve problems quickly
Inspected completed installations prior to start-up in order to verify quality assurance requirements were met
Created detailed documentation outlining project progress, results, and any corrective actions taken
Setup and verify correct boundaries for high pressure testing using p&ids
Pressure test piping
Developed and implemented comprehensive test plans for multiple projects
System flushes
Commissioning Technician
2 Months
Zachry Industrial | 04.2022 - 06.2022
Worked closely with engineers, land surveyors, and other key stakeholders on different infrastructure projects
Read blueprints and schematics to interpret building plans
Determined building materials needed for projects
Skilled at working independently and collaboratively in a team enviroment
Self-motivated, with a strong sense of personal responsibility
Proven ability to learn quickly and adapt to new situations
Commissioning Technician
1 Year 5 Months
Zachry Industrial | 12.2020 - 05.2022
Worked effectively in fast-paced environments
Read blueprints and schematics to interpret building plans
Determined building materials needed for projects
Documented and reported project activities to senior engineer
Worked well in a team setting, providing support and guidance
Self-motivated, with strong sense of personal responsibility
Proven ability to learn quickly and adapt to new situations
Set up for Chen-cleaning and water runs
Setup boundaries for testing, and reinstating piping
Installed internals for check valves, inspected actuated valves and corrected any problems
Preformed pneumatic and hydro testing on piping systems
Completed lube-oil flushes
Setup and completed steam blows for high pressure systems
Hydro Testing Foreman
11 Months
Wood Group | 12.2019 - 11.2020
Created and maintained daily and weekly reports for upper management
Scheduled and oversaw maintenance, repair and installation activities
Monitored safely compliance to maintain strict standards and protect team from harm
Utilized proper tools and materials to adhere to safety guidelines
Supervised team of installers and mechanics to complete work on time and to company standards
Monitored daily progress and work quality to provide guidance and direction to mechanics and installers
Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time
Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job
Structural Welder/Project Lead
5 Months
Zachry Industrial | 08.2019 - 01.2020
Installed and welded steel beams, columns, girders, and other structural elements.
Repaired damaged or defective parts using appropriate welding techniques.
Ensured compliance with safety regulations while performing welding duties.
Maintained a clean work area by removing scraps of metal and other debris from job sites.
Tested different types of welding equipment to ensure optimal performance levels.
Job task supervisor
Pipefitter
4 Months
PCL Construction | 03.2019 - 07.2019
Read blueprints and diagrams to determine the type of pipe and tools needed for each job.
Install, maintain, and repair pipes used in heating, cooling, lubricating, sprinkler systems, manufacturing processes, and waste disposal.
Measure, cut, thread, groove, bend and install piping according to specifications.
Inspect work areas to ensure that they are clean and free from obstructions.
Test plumbing systems for leaks using air pressure gauges or other testing devices.
Repair or replace worn parts such as seals and bearings on pumps and valves.
Adjust flow rates within specified limits by changing valve positions or altering lengths of pipe sections.
Forman
6 Months
Wood Group | 08.2018 - 02.2019
Maintained daily logs of labor and equipment used on-site.
Ensured all workers adhered to company policies and procedures.
Conducted regular performance reviews with crew members.
Provided guidance, direction, and technical assistance to crew members.
Monitored job progress and ensured completion within budget constraints.
Coordinated with other departments to ensure project deadlines were met.
Mechanical Construction Foreman at Pipeline Enviromental Compression IndustriesMechanical Construction Foreman at Pipeline Enviromental Compression Industries