Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Severen Maack

Tacoma,WA

Summary

Driven and adaptable professional with experience at McMains Roofing, skilled in roof installation and demonstrating exceptional teamwork. Achieved project completion ahead of tight schedules through proficient use of power tools and a strong commitment to safety procedures. Excelled in maintaining high customer satisfaction and workplace safety across diverse projects.

Overview

10
10
years of professional experience

Work History

Roofing Laborer

McMains Roofing
01.2016 - 10.2020
  • Removed old roofing material and properly disposed of all debris to maintain clean, organized work sites.
  • Performed job duties at low, medium, and advanced heights on regular basis while observing safety protocols to avoid possibility of accidents and falls.
  • Completed residential and commercial projects with tight schedules by working effectively with fellow team members.
  • Maintained good physical fitness in order to maintain proper balance on inclined surfaces and at high levels off ground.
  • Ensured customer satisfaction by maintaining a clean work area and promptly addressing concerns.
  • Expedited task completion through proficient use of hand tools, power tools, and other specialized equipment.
  • Demonstrated adaptability in working with various roofing types such as asphalt shingles, metal, or slate for diverse projects requirements.
  • Promoted safe working conditions through regular equipment maintenance and hazard identification.

Gutter Installer

S&S Gutters
03.2014 - 06.2016
  • Maintained a safe working environment by adhering to safety protocols and guidelines while installing gutters.
  • Erected scaffolding and ladders to reach gutter heights.
  • Installed downspouts, elbows and materials in existing and new construction homes.
  • Upheld quality standards for all completed installations by closely following manufacturer guidelines for material handling and assembly processes.

Order Picker

National Oak Distributors Inc.
03.2011 - 05.2013
  • Prepared orders by processing requests, pulled materials from warehouse, packed boxes, and prepared shipments.
  • Collaborated with team members to ensure timely completion of orders during peak demand periods.
  • Excellent communication skills, both verbal and written.
  • Reduced order processing time with the use of RF scanning equipment and inventory management software.

Education

GED -

Highline College
DesMoines, WA
05.2010

Skills

  • Roof Installation
  • Roof repair
  • Debris Removal
  • Safety Procedures
  • Team Player
  • Quick Learner
  • Power Tools Operation
  • Workplace Safety
  • First Aid Training

References

i Have been doing side work for Joe holder for the last few months. Tasks included - painting, roof repairs, Moss removal, and landscaping and gutter  installation.

his phone number is 253-686-0170


Timeline

Roofing Laborer

McMains Roofing
01.2016 - 10.2020

Gutter Installer

S&S Gutters
03.2014 - 06.2016

Order Picker

National Oak Distributors Inc.
03.2011 - 05.2013

GED -

Highline College
Severen Maack