Tile Setter
Thomas Tile
- Used power wet saws and tile cutters to cut tiles to specifications for projects.
- Maintained a safe work environment through proper use of tools, equipment, and adherence to safety protocols.
- Reviewed blueprints and specifications to determine labor and materials that would be required to complete tiling project.
- Prepared surfaces for tiling using appropriate materials such as cement board or waterproof membrane to ensure long-lasting installations.
- Ensured accurate alignment of tiles using leveling systems for professional results that exceeded clients'' expectations.
- Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
- Assisted clients in selecting grout colors that complemented their chosen tile design, enhancing overall aesthetics of the finished project.
