Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
7
7
years of professional experience
Work History
Superintendent
Valfair Construction
501 E US HWY 80 Forney TX 75126
05.2020 - Current
Enhanced project efficiency by streamlining communication between team members and stakeholders.
Implemented safety protocols for reduced workplace accidents and improved employee wellbeing.
Developed comprehensive budgets and schedules to ensure timely project completion within allocated
Established effective quality control measures for consistent delivery of high-quality construction projects.
Mentored junior staff, leading to increased productivity and improved teamwork throughout the organization.
Conducted regular site inspections to maintain compliance with industry regulations and standards.
Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
Managed multiple simultaneous projects while maintaining strict deadlines and adhering to budget constraints.
Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
Reviewed plans and inspected ongoing construction to keep work in line with project goals.
Managed complete construction process to maximize quality, cost-controls and efficiency.
Maintained safety onsite and upheld all OSHA regulations.
Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
Resolved conflicts between staff and customers swiftly and professionally.
Trained workers in proper methods, equipment operation and safety procedures.
Inspected equipment and tools used for safe operation.
Provided feedback to workers on job performance and safety procedures.
Investigated and reported on accidents, injuries and near-miss incidents.
Documented construction and extraction workers' hours, wages and other pertinent information.
Assisted in recruiting and hiring new construction and extraction workers.
Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
Electrician
Ari-Tex Electric
1010 S Greenville Ave Allen, TX 75002
08.2017 - 05.2020
Improved electrical system safety by conducting thorough inspections and identifying potential hazards.
Enhanced energy efficiency by recommending and installing upgraded electrical components in residential and commercial properties.
Provided exceptional customer service through clear communication, accurate estimates, and timely project completion.
Reduced downtime for clients by quickly diagnosing and repairing complex electrical issues.
Assisted in the design phase of various projects, providing input on optimal lighting layouts, power distribution plans, and equipment specifications.
Developed strong working relationships with clients through consistent professionalism, reliability, and transparency during projects.
Fabricated custom and replacement parts according to specifications, using hand tools.
Prevented breakdown of systems by routinely inspecting and replacing old wiring and cleaning circuits.
Studied building schematics to determine location of wiring and equipment.
Spliced, joined and connected wire to fixtures and other electrical components.
Installed safety and distribution components for electrical systems, such as switches, resistors and circuit-breaker panels.
Replaced and repaired lighting fixtures and electrical control and distribution equipment.
Connected wires to circuit breakers, transformers or other components.
Repaired or replaced wiring, equipment and fixtures using hand tools and power tools.