Summary
Overview
Work History
Education
Skills
Timeline
Generic

Solomon Valentine

Stockton,CA

Summary

Disciplined professional focused on completing highest quality construction work. Skilled builder with manual dexterity, depth perception, and reading and math skills to add value to diverse job site roles. Committed to learning skilled trades and to long-range career in field.

Overview

1
1
year of professional experience

Work History

Demolition Worker

Central Valley demolition
Modesto , Illinois
01.2024 - 12.2024

Read blueprints, remove walls, remove cabinets, remove concrete, and removing debris.

  • Provided guidance and instruction to laborers working on demolition projects.
  • Followed environmental guidelines when disposing of debris from demolition sites.
  • Worked productively as lead or helping team member to drive customer satisfaction.
  • Removed debris remaining after natural disasters such as floods.
  • Demolished walls, floors, and other components of buildings using hand tools and power tools.
  • Stripped structures of valuable and reusable materials.
  • Separated recyclable material such as metal beams and piping for salvage or reuse.
  • Operated equipment with strong focus on safety and ground communication.
  • Inspected building structures to identify potential safety hazards.
  • Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
  • Cleared rubble from demolition sites after completion of work.
  • Operated heavy equipment such as backhoes, bulldozers, and jackhammers to demolish buildings.
  • Used correct equipment and techniques to demolish buildings smoothly and avoid damaging nearby structures.
  • Hauled out damaged materials and followed correct disposal processes to minimize environmental problems from chemicals or unsafe materials.
  • Monitored noise levels at job sites to ensure compliance with local regulations.
  • Worked closely with construction crews to coordinate efforts between demolition and new construction projects.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Performed basic maintenance on equipment used during demolition activities.
  • Inspected sites before and after construction projects.
  • Cleaned up worksites following completion of jobs in order to maintain a safe environment.
  • Conducted daily inspections of tools and machinery used during demolitions.
  • Wore protective equipment such as respirators and special suits for optimal protection from site hazards.

Education

High School Diploma -

Stockton Adult School
Stockton, CA

Skills

  • Noise control
  • Asbestos abatement
  • Aerial lift operation
  • Asbestos removal
  • Selective demolition
  • Site preparation
  • Safety regulations compliance
  • Heavy machinery operation
  • Concrete cutting
  • Crew coordination

Timeline

Demolition Worker

Central Valley demolition
01.2024 - 12.2024

High School Diploma -

Stockton Adult School
Solomon Valentine