Summary
Overview
Work History
Education
Skills
Timeline
Generic

Steven Balon

Sparta Township,NJ

Summary

Dynamic Project Manager with extensive experience at Holy Name Hospital, excelling in construction management and regulatory compliance. Proven track record in enhancing workflow and operational efficiency, alongside strong team leadership and problem-solving skills. Adept at negotiating contracts and maintaining safety protocols, ensuring successful project execution and satisfaction.

Overview

22
22
years of professional experience

Work History

Project Manager/Maintenance

Holy Name Hospital
Teaneck, USA
08.2017 - Current
  • Managed design and procurement of materials for various new construction projects.
  • Fix stuck operating room dummy waiter for surgical tools to ensure efficiency.
  • Constructed pressure rooms, modified refrigeration trucks for morgue storage, and adhered to PPE standards.
  • Completed assigned repair tickets promptly to maintain operational flow.
  • Relocated doctor offices to optimize space and accessibility.
  • Executed all requests from doctors and staff to enhance workflow.

Maintenance/COMIN

Ikea
Paramus, USA
05.2009 - 08.2017
  • Operated workshop to fulfill showroom setup requirements.
  • Independently set up showroom displays to enhance product visibility.
  • Monitored building systems including AC and fire equipment for optimal functionality.
  • Cleaned lighting and fan fixtures to maintain aesthetic appeal.
  • Installed hardwood flooring to improve showroom environment.
  • Covered dual departments during staffing shortages to ensure seamless operations.

Carpenter

Balon Construction
Elmwood Park, USA
08.2008 - 05.2009
  • Executed painting projects utilizing diverse colors and techniques.
  • Orchestrated installation of cabinets, countertops, sinks, and accessories in kitchens.
  • Managed comprehensive bathroom renovations including tile work, vanities, tubs, and light fixtures.
  • Completed installation of wood doors while demonstrating knowledge of metal door systems.
  • Specialized in flooring installation, encompassing tile, hardwood, linoleum, and engineered materials.
  • Ensured compliance with town ordinances and building codes throughout project execution.
  • Served as job site leader, overseeing daily operations and coordinating team efforts.

Carpenter

Exceptional Contracting
Fairfield, USA
08.2005 - 08.2008
  • Executed painting projects utilizing various colors and techniques.
  • Managed kitchen renovations, including cabinet and countertop installation with sink accessories.
  • Oversaw bathroom remodels, incorporating tile, vanities, tubs, medicine cabinets, toilets, and waterproofing.
  • Completed installation of wooden doors with knowledge of metal options.
  • Installed flooring solutions such as tile, hardwood, linoleum, and engineered materials.
  • Constructed custom closets and cabinetry to meet client specifications.
  • Led job sites as foreman, ensuring adherence to safety protocols.
  • Ensured compliance with town ordinances, building codes, and regulations.

Carpenter Helper/Apprentice

Balon Construction
Elmwood Park, USA
07.2003 - 07.2005
  • Executed painting projects using various colors and techniques.
  • Installed cabinets, countertops, sinks, and accessories in kitchens.
  • Completed tile installations, vanities, tubs, and light fixtures in bathrooms.
  • Managed installation of wood doors with knowledge of metal door applications.
  • Laid tile, hardwood, linoleum, and engineered flooring efficiently.

Education

Forklift, High-low, Box Trucks, Snow Blower
Operator and Repair Technician

Skills

  • Project management
  • Construction management
  • Regulatory compliance
  • Equipment maintenance
  • Building renovations
  • Team leadership
  • Workflow improvement
  • Problem solving
  • Effective communication
  • Time management
  • Safety protocols
  • Processes and procedures
  • Contract negotiation expertise
  • Staff training and motivation
  • Project feedback data
  • Creative thinking
  • Progress reporting

Timeline

Project Manager/Maintenance

Holy Name Hospital
08.2017 - Current

Maintenance/COMIN

Ikea
05.2009 - 08.2017

Carpenter

Balon Construction
08.2008 - 05.2009

Carpenter

Exceptional Contracting
08.2005 - 08.2008

Carpenter Helper/Apprentice

Balon Construction
07.2003 - 07.2005

Forklift, High-low, Box Trucks, Snow Blower
Steven Balon