Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Key Engineering Projects

Sunil Pradkhan

Newport News Shipbuilding (HII)
BROOKLYN,NY
2
Languages
1
Certification
4
years of professional experience

Mechanical engineer II specializing in HVAC optimization and industrial ventilation for large-scale facilities. Proven ability to re-engineer legacy systems, enhancing energy efficiency and reliability. Extensive experience with ASHRAE standards, hydronic systems, and load modeling. Dedicated to providing comprehensive engineering solutions from analysis through commissioning.

Work History

Mechanical Engineer II

2 Years 10 Months
Newport News Shipbuilding (HII) | 12.2023 - Current
  • Conducted HVAC and mechanical evaluations to identify inefficiencies in industrial systems.
  • Performed engineering calculations for airflow distribution, heat loss, and load modeling.
  • Developed optimization strategies for ventilation staging and hydronic integration.
  • Generated technical reports to enhance decision-making quality.
  • Supported commissioning efforts through TAB execution and performance validation.
  • Collaborated with operations, maintenance, and engineering teams to implement system improvements.

Commissioning Engineer

2 Months
TMG | 06.2026 - 08.2026

*Building Codes & Standards: IBC, IMC, IPC, NEC (NFPA 70)
*Inspection & Testing: MEP Inspection, HVAC TAB Verification, NDT/NDE, QA/QC Field Audits
*Field Software: Bluebeam Revu, AutoCAD, Facility Grid
*Documentation: Punch Lists, Daily Field Log
*Code & Regulatory Compliance: International Building Code (IBC), International Mechanical Code (IMC), International Plumbing Code (IPC), National Electrical Code (NEC/NFPA 70).
*Quality Assurance & Control (QA/QC): Field auditing, non-conformance reporting (NCR), defect tracking, punch list management, specification compliance.
*Structural & Systems Inspection: MEP (Mechanical, Electrical, Plumbing) systems, HVAC ductwork and air balance, fire protection and life safety systems.
*Testing & Diagnostic Procedures: Non-Destructive Testing (NDT/NDE), hydrostatic pressure testing, thermal imaging/infrared thermography, visual inspection (VT).

Mechanical Engineer

4 Months
Mission Technologies (HII) | 03.2023 - 07.2023
  • Facilitated mechanical system design, analysis, and engineering documentation
  • Conducted system evaluations and component-level analysis to enhance performance
  • Aided engineering problem-solving to drive system performance improvements

Education

Bachelor of Science - Mechanical Engineering

City College of New York | New York, NY

Skills

HVAC design and industrial ventilation
Airflow analysis
Hydropic systems
SolidWorks 3D models
Mechanical system design
MathWorks MATLAB
Energy modeling
ASHRAE 62.1 compliance
TRACE 700 proficiency
Simulation software expertise

Certification

OSHA 10

Languages

Russian
Native/ Bilingual
English
Full Professional

Timeline

Commissioning Engineer

TMG
06.2026 - 08.2026Read More

Mechanical Engineer II

Newport News Shipbuilding (HII)
12.2023 - CurrentRead More

Mechanical Engineer

Mission Technologies (HII)
03.2023 - 07.2023Read More

City College of New York

Bachelor of Science from Mechanical Engineering
Read More

Key Engineering Projects

Industrial HVAC Recommissioning & ACH Optimization
Evaluated 3.76M ft³ welding facility at 5 ACH; identified >15× over-ventilation vs. ASHRAE 62.1. Separated process/envelope ventilation, validated airflow/ACH, modeled heat loss, and applied fan affinity laws. Implemented 1.1–5 ACH staged strategy. Results: 30–50% heating and 60–70% fan-energy reduction.

HVAC Energy Modeling & Load Reduction
Built ventilation-driven load model; identified >90% load from ventilation. Developed ACH/load/energy curves and annual MMBtu/therm models. Results: Reduced load 32,000 → 22,000 MMBtu/year per bay without capital investment.

Ventilation Compliance & IAQ Engineering
Performed ASHRAE 62.1 VRP calculations and ACH benchmarking. Applied ACGIH principles to evaluate dilution vs. source capture and linked IH sampling to HVAC conditions. Delivered code-compliant, performance-based ventilation strategy.

Air Distribution Optimization & System Rebalancing
Analyzed 30+ zones and ~13,000+ CFM capacity; identified dominant ~50% load zone. Rebalanced dampers/VAV and corrected pressurization. Results: ±10% airflow balance, improved IAQ and comfort without CapEx.

HVAC & Hydronic System Modernization
Integrated HVAC, hydronic risers, VAV, and exhaust systems across multi-floor renovation. Mitigated variable-flow conflicts and supported TAB, BAS, and functional testing. Delivered stable integrated systems.

Domestic Water System Optimization
Replaced galvanized piping with PVC and redesigned layout to reduce pressure loss. Eliminated corrosion risks, improved maintainability, reliability, and lifecycle performance.

Industrial Ventilation Assessment
Led welding/pickling evaluation; validated source capture vs. dilution ventilation and developed airflow verification methodology. Standardized analysis and defined next-phase validation strategy.

Sunil Pradkhan