Summary
Overview
Work History
Skills
Timeline
Generic

Timothy Worley

Winlock

Summary

Dynamic Maintenance Technician with a proven track record, excelling in preventive maintenance and mechanical troubleshooting. Recognized for enhancing equipment functionality and minimizing downtime through effective problem-solving and safety awareness. Adept at managing complex repairs and collaborating with teams to optimize operational efficiency.

Overview

6
6
years of professional experience

Work History

Maintenance Technician

Cintas
12.2022 - 01.2024
  • Operated varied hand and power tools to complete repairs.
  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Troubleshot equipment breakdowns and performed preventive maintenance.
  • Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
  • Inspected and maintained equipment to keep items in top working condition.
  • Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
  • Successfully completed complex repair tasks within tight deadlines, minimizing disruptions to daily operations.
  • Improved equipment functionality by conducting regular maintenance checks and repairs.
  • Performed electrical and mechanical repairs of production equipment to minimize downtime.

Power Plant Operator

Golden Valley Electric Assn
02.2018 - 10.2021
  • Improved safety standards by conducting regular inspections and implementing necessary modifications to the power plant layout.
  • Documented plant activities in logs and detailed concerns and issues prior to distributing reports to manager.
  • Ensured accurate record-keeping for inventory management purposes, maintaining adequate stock levels while avoiding excess costs associated with overstocking supplies.
  • Enhanced power plant efficiency by monitoring and adjusting control systems for optimal performance.
  • Increased system reliability by performing routine preventive maintenance on all equipment, minimizing unexpected failures and disruptions.
  • Contributed to the successful completion of various projects within budget constraints while meeting specified deadlines, showcasing strong project management skills.
  • Maintained a safe working environment through strict adherence to safety protocols and ongoing initiatives aimed at reducing workplace hazards.
  • Collaborated with engineering teams on projects to upgrade existing systems or install new components, enhancing overall plant capabilities.

Skills

  • Preventive Maintenance
  • Building maintenance
  • Mechanical troubleshooting
  • Troubleshooting skills
  • Safety awareness
  • Electrical troubleshooting
  • Mechanical repair
  • Parts replacement
  • Equipment installation
  • Tool management
  • Lockout and tagout procedures
  • Industrial equipment
  • Electrical panels
  • Maintenance scheduling

Timeline

Maintenance Technician

Cintas
12.2022 - 01.2024

Power Plant Operator

Golden Valley Electric Assn
02.2018 - 10.2021
Timothy Worley