Summary
Overview
Work History
Education
Skills
Timeline
Generic

Todd Johnson

Oldtown,ID

Summary

Dedicated construction professional with extensive hands-on experience in residential and commercial projects. Proven track record of delivering high-quality work on time and under budget while adhering to safety protocols. Resourceful team leader skilled in all phases of construction, from demolition to finish carpentry.

Overview

39
39
years of professional experience

Work History

Owner/operator

OFF THE MAP LOGWORKS
Priest River, Idaho
05.2013 - Current
  • Remodeled 30 x 30 commercial ceramic shop into livable 2-bedroom, 1-bath area with kitchen, laundry, living, and dining spaces.
  • I spent 6 months, approx. 800 hrs framing, and finishing a 2 story house for Craig Martin, Hoo Doo Mountain Priest River Idaho.
  • Performed comprehensive home construction tasks, such as plumbing, painting, flooring, drywall work, and finish carpentry.
  • Remodeled bathroom by upgrading plumbing and electrical systems, and custom building vanity and medicine cabinet.
  • Remodeled bathroom and bedroom for Michael Johnson in Nine Mile Falls, WA, completing drywall, painting, texturing, flooring, and installing sink and toilet.
  • Remodel bathroom including tiling in new shower, installing new toilet, paint, and flooring for Karen Stokes Colbert Washington.
  • Ceramic shop, bathroom, and garden all completed for Jeff Purser. Approximately 900 to 1100 hours.
  • 2- 18 inch x 48 inch x 38 inch tall Custom Planters, and custom Chess board for Sarah Henderson Liberty Lake Washington.
  • Also made custom rustic corner shelf, cabinet with checker board, multiple custom birdhouses, and custom picnic table and benches.
  • Since 2020 I have done many jobs small and large, such as 12- 4 x 4 custom dog houses for a now defunct dog boarding business.
  • Installed 3 business signs with James Baldree, Sagle Idaho. Remove old signs prep areas for new run new electrical and install new sign in place.
  • Prep plan and construct raised garden beds and enclosure, approximately 40 x 60.
  • 1 Created a personalized chess board as a unique gift., custom picnic table and benches, multiple custom frames, 4 different shelves, bathroom remodel, garage customization including framing, drywall install and texture, and lighting and garage door install, and a multitude of other carpentry, plumber, electrician, cleaner, fabricator, mind reader and all out magician type services for my parents.
  • 4x8 deck, steps, shelves, electrical, plumbing, basic and complex carpentry and reasoning, and sometimes miracle worker keeping my own home from falling apart.

Carpenter/Demolition Specialist

YOKUM CONSTRUCTION
Priest River, Idaho
01.2010 - 12.2012
  • Completed demo project under budget and ahead of schedule with no punch list items.
  • Performed all phases and levels of carpentry including but not limited to, finish carpentry, flooring, siding, and roofing.
  • Oversaw quality control to check completeness, accuracy and skill of completed work.
  • Maintained high standards of quality workmanship by consistently double-checking completed tasks.
  • Ensured crew adhered to safety standards, protecting personnel, equipment, and surrounding structures.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Operated equipment with strong focus on safety and ground communication.
  • Eliminated hazards on construction sites by ensuring areas were clean and organized.
  • Contributed as lead or supporting team member to enhance customer satisfaction through effective collaboration.

Excavator Operator

COPPER BAY CONSTRUCTION
Nordman, Idaho
02.2005 - 06.2006
  • Followed company policies by performing thorough equipment inspections prior to and after each shift.
  • Operated excavators and construction equipment to achieve precise land grading.
  • Controlled operation of heavy power machinery to complete on-site work.
  • Managed loader and dozer operations to ensure efficient material movement.
  • Loaded and transported dirt, rocks, equipment, and materials to facilitate site operations.
  • Ditched and backfilled steep terrain and side slopes, utilizing vacuum lifters, shaker buckets and hammers.
  • Evaluated excavation and material movement instructions to confirm compliance with project specifications.
  • Observed potential hazards and obstructions to maximize safe working conditions.
  • Observed hand signals, grade stakes and markings to operate machines within performance specifications.
  • Operated heavy equipment in compliance with company's operating safety policies and procedures.
  • Confirmed adherence to safety protocols by team members and followed strict measures to avoid accidents and injuries.

Maintenance Supervisor

HOLIDAY INN
Spokane, Washington
06.2004 - 12.2004
  • Scheduled and executed preventive maintenance programs to ensure optimal equipment functionality.
  • Changed HVAC filters and cleaned condensation drains to perform preventive maintenance on HVAC systems.
  • Collaborated with building managers to identify maintenance needs and develop preventive maintenance schedules.
  • Maintained or repaired specialized equipment or machinery.
  • Inspected grounds and buildings to identify, minimize and correct hazardous property conditions or liability concerns.
  • Maintained clear and safe workspace areas to meet OSHA standards.
  • Read and interpreted equipment and work orders to properly perform required maintenance services.
  • Responded to personnel queries and troubleshooting requests to provide repair services to improve operations.
  • Operated hand and power tools to complete repairs.
  • Set up and operated machine tools to repair or fabricate jigs, fixtures or tools.
  • Replaced wall sockets, ran lines and completed basic carpentry to finish installations.
  • Conducted routine inspections of drives, motors, and belts to maintain operational efficiency.
  • Acquired necessary equipment and supplies from various sources to support maintenance operations.

Carpenter

SWENSON CONSTRUCTION
Seward, Alaska
01.2004 - 06.2004
  • Guided apprentices and trainees through building construction and renovation projects to enhance skill development.
  • Executed a range of carpentry tasks, including framing, installation, and finishing work on various projects., including both rough and finish carpentry.
  • Installed building windows, trim and cabinetry alone or with assistants to meet job deadlines.
  • Installed cabinets, base cabinets and crown molding.
  • Cut timber, panels and other wooden materials according to measured dimensions.
  • Positioned and installed floor joists, trusses and rafters.
  • Anchored and braced forms to complete precise joining.
  • Reviewed jobsite needs with foreman and coordinated construction.
  • Studied blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.
  • Performed inspections, diagnosed issues, and adjusted measurements to ensure project compliance with specifications.
  • Promoted team safety by keeping work areas free of hazards.

Carpenter

PRO BUILDERS
Spokane, Washington
06.2003 - 12.2003
  • Studied blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.
  • Executed diverse carpentry tasks, handling both rough and finish carpentry to meet project requirements.
  • Positioned and installed floor joists, trusses and rafters.
  • Shaped or cut materials to proper measurements using hand tools, machines or power saws.
  • Assessed buildings for structural integrity and ensured compliance with project specifications. and project specifications to determine measurements.
  • Anchored and braced forms to complete precise joining.
  • Conducted regular inspections of work areas to identify hazards and maintain team safety. by keeping work areas free of hazards.

Carpenter

MANNICK CONSTRUCTION
Spokane, Washington
01.2003 - 06.2003
  • Installed and stained oak casings and hardwood floors, enhancing aesthetic appeal and durability.
  • Cut timber, panels and other wooden materials according to measured dimensions.
  • Utilized band, circular, and compound miter saws for precise cutting tasks.
  • Positioned and installed floor joists, trusses and rafters.
  • Assessed buildings and project specifications to establish accurate measurements for construction.
  • Collaborated with foreman to evaluate jobsite requirements and streamline construction coordination.
  • Prioritized work, keeping carpentry jobs on task and within budget.
  • Applied design-specific wood and composite trim according to architectural plans and neighborhood regulations.

Lead Carpenter

CAPSTONE CONSTRUCTION
Spokane, Washington
05.2001 - 12.2001
  • Planned work based on blueprints and individual project specifications.
  • Examined buildings and project specifications to determine measurements.
  • Studied blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.
  • Shaped materials to exact measurements for job requirements with hand tools and power equipment.
  • Performed various carpentry duties, including both rough and finish carpentry.
  • Collaborated with customers to design and create custom entertainment centers, china cabinets, mantels, and kitchen cabinets for residential spaces.
  • Applied design-specific wood and composite trim according to architectural plans and neighborhood regulations.
  • Installed cabinets, base cabinets and crown molding.
  • Measured, cut and installed staircase spindles.
  • Cut and installed tile and hardwood flooring for residential and commercial buildings.
  • Laid and stained oak casings and hardwood floors.
  • Installed building windows, trim and cabinetry alone or with assistants to meet job deadlines.
  • Positioned and installed floor joists, trusses and rafters.
  • Anchored and braced forms to complete precise joining.
  • Contracted and collaborated with specialty sub-contractors for special trade jobs or installations.
  • Conducted detailed inspections to diagnose issues, ensuring adherence to project specifications and quality standards.
  • Repaired or replaced damaged or defective parts using power tools and equipment.
  • Reviewed jobsite needs with foreman to coordinate construction processes and align project execution.
  • Fostered a safe work environment by eliminating potential hazards.
  • Prioritized work, keeping carpentry jobs on task and within budget.
  • Led apprentices and trainees in building construction and renovation.
  • Applied acoustic paneling to ceilings and walls to adjust sound absorption and rebound within rooms.
  • Used band, circular and compound miter saws.

Demolition Specialist/Carpenter

ENGINEERED DEMOLITION
Spokane Valley, Washington
02.2001 - 05.2001
  • Identified and mitigated safety hazards, ensuring employee safety and preventing potential incidents on-site.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Maintained crew safety under various types of weather and working conditions.
  • Executed site activities adhering to green-certified construction practices, contributing to sustainable building efforts.
  • Maintained high standards of quality workmanship, consistently reviewing and verifying work for accuracy and compliance.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Operated equipment with strong focus on safety and ground communication.
  • Read plans, instructions or specifications to determine work activities.
  • Measured, marked or recorded openings or distances to construction layout areas.
  • Positioned, aligned or sealed concrete wall sections or pipes.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.

Carpenter

ARROW CONTRACTING
Spokane, Washington
06.2000 - 09.2000
  • Executed rough and finish carpentry tasks to ensure high-quality workmanship.
  • Applied design-specific wood and composite trim according to architectural plans and neighborhood regulations.
  • Laid and stained oak casings and hardwood floors.
  • Positioned and installed floor joists, trusses and rafters.
  • Anchored and braced forms to complete precise joining.
  • Installed cabinets, base cabinets and crown molding.
  • Shaped or cut materials to proper measurements using hand tools, machines or power saws.
  • Utilized band saw for accurate material cutting, circular and compound miter saws.
  • Reviewed jobsite needs with foreman to coordinate efficient construction processes.
  • Inspected buildings for compliance with specifications and project specifications to determine measurements.
  • Prioritized work tasks to maintain project timelines and adhere to budget constraints.
  • Promoted team safety by keeping work areas free of hazards.

Carpenter/demolition Specialist

DELCON CONSTRUCTION/NORTHWEST REGIONAL SVS
Spokane, Washington
03.1996 - 10.1999
  • Completed demo project under budget and ahead of schedule, achieving quality standards with no punch list items.
  • Managed fieldwork with a team of 12 carrying out construction/demolition abatement projects.
  • Managed crew of up to 15 personnel, scheduling work and delegating tasks to ensure project milestones were met.
  • Oversaw quality control to check completeness, accuracy and skill of completed work.
  • Executed site preparation tasks to eliminate hazards and ensure a safe working environment for construction crews. construction sites to eliminate hazards.
  • Identified safety hazards and risk to employees and corrected deficiencies before major problems occurred.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Maintained crew safety under various types of weather and working conditions.
  • Operated equipment with a strong focus on safety and ground communication.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Tended pumps, compressors or generators to provide power or heat or move materials.
  • Measured, marked or recorded openings or distances to construction layout areas.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Read plans, instructions or specifications to determine work activities.
  • Coordinated phases of construction projects from inception to completion.
  • Collaborated with field engineering and construction to prepare scopes of work for inclusion into bid packages.
  • Kept projects in strict compliance with contract documents and schedules using effective management and problem-solving abilities.
  • Assessed and mitigated materials such as asbestos, mold, lead and silica dust known to cause environmental and health problems.
  • Performed site activities required of green-certified construction practices.
  • Managed fieldwork with a team of 12 carrying out lead abatement projects.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Worked productively as lead or helping team member to drive customer satisfaction.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Assisted in resource planning to enhance project efficiency and productivity. utilization of project personnel, equipment and materials by analyzing upcoming projects and forecasting needs.
  • Assisted with diverse construction challenges to help team and customer.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.
  • Directed vehicles effectively to prevent accidents and maintain smooth operations. passing near, in or around work zones.
  • Inspected sites before and after construction projects.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.
  • Performed demanding physical work over extended periods and modeled positive attitude.

Carpenter/Course Construction

DEER MEADOWS GOLF INC
Davenport, Washington
06.1995 - 08.1995
  • Excavated ground to prepare site for construction of back nine, ensuring proper foundation.
  • Performed various carpentry duties, including both rough and finish carpentry.
  • Examined buildings and project specifications to determine measurements.
  • Led apprentices and trainees in construction and renovation projects, fostering skill development and safety awareness.
  • Promoted team safety by keeping work areas free of hazards.
  • Reviewed jobsite needs with foreman and coordinated construction.
  • Conducted inspections and diagnosed issues, measuring and making adjustments to ensure projects met specifications.
  • Cut timber, panels and other wooden materials according to measured dimensions.
  • Used various carpenter's hand tools, portable power tools and standard measuring instruments.

Building Maintenance

COSTCO WHOLESALE
Seattle, Washington
09.1994 - 12.1994
  • Performed daily inspections and other tasks to maintain clean and safe a clean and safe work environment.
  • Organized and cleaned construction sites to remove hazards. to eliminate hazards.
  • Adhered to safety requirements by operating equipment and appropriately handling material.
  • Applied best safety practices while working at heights and lifting various objects.
  • Controlled traffic passing near, in or around work zones.
  • Lubricated, cleaned or repaired machinery or equipment.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Acquired skills for independent task execution and guided less experienced team members.
  • Coordinated phases of construction projects from inception to completion.
  • Followed build procedures and work instructions to construct varied-size structures.
  • Constructed quality structures to meet prescribed time schedules and budgets.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Maintained inventory by providing an accurate count of products.
  • Transported materials to or from designated areas using hand truck, electric dolly or forklift.
  • Loaded materials and tools into vehicles and unloaded upon arrival at job sites.
  • Implemented site activities that aligned with green-certified construction practices.
  • Used hand tools and power tools to reinforce builds.
  • Read plans, instructions or specifications to determine work activities.
  • Contributed to continuous improvement by suggesting enhancements to supervisors and leads.
  • Complied with quality requirements to meet or exceed production service levels.
  • Operated equipment with strong focus on safety and ground communication.

Prepper/Rugger

BRUNSWICK FAMILY BOATS
Spokane, Washington
06.1987 - 11.1988
  • Installed mooring hardware and railing systems to ensure secure and safe access.
  • Cut openings in decks and hulls for installation of windows, doors, and motor hatches.
  • Operated equipment and adjusted settings to ensure quality standards and compliance with specifications.
  • Sanded and sealed completed finishes according to precise specifications.
  • Used chemicals and solvents to clean equipment after paint applications.
  • Handled and disposed of hazardous waste to protect personnel and preserve environmental habitats.

Education

High School Diploma -

Riverside High
Milan, Washington
06-1986

Skills

  • Project Management
  • Site Management
  • Quality Control
  • Code Compliance
  • Blueprints and Specifications
  • Problem-Solving
  • Problem resolution
  • Selective Demolition
  • Structural Tear-Down
  • Heavy/light Equipment Operation
  • Tool Maintenance
  • Equipment Calibration
  • Installation and Finishing
  • Form construction
  • Materials Salvage
  • Sustainable Practices
  • Safety-First Mentality
  • Safety Procedures
  • Worksite safety
  • Situational Awareness
  • Team coordination
  • Preventive Maintenance
  • Hand and Power Tools
  • Installation and Finishing

Timeline

Owner/operator

OFF THE MAP LOGWORKS
05.2013 - Current

Carpenter/Demolition Specialist

YOKUM CONSTRUCTION
01.2010 - 12.2012

Excavator Operator

COPPER BAY CONSTRUCTION
02.2005 - 06.2006

Maintenance Supervisor

HOLIDAY INN
06.2004 - 12.2004

Carpenter

SWENSON CONSTRUCTION
01.2004 - 06.2004

Carpenter

PRO BUILDERS
06.2003 - 12.2003

Carpenter

MANNICK CONSTRUCTION
01.2003 - 06.2003

Lead Carpenter

CAPSTONE CONSTRUCTION
05.2001 - 12.2001

Demolition Specialist/Carpenter

ENGINEERED DEMOLITION
02.2001 - 05.2001

Carpenter

ARROW CONTRACTING
06.2000 - 09.2000

Carpenter/demolition Specialist

DELCON CONSTRUCTION/NORTHWEST REGIONAL SVS
03.1996 - 10.1999

Carpenter/Course Construction

DEER MEADOWS GOLF INC
06.1995 - 08.1995

Building Maintenance

COSTCO WHOLESALE
09.1994 - 12.1994

Prepper/Rugger

BRUNSWICK FAMILY BOATS
06.1987 - 11.1988

High School Diploma -

Riverside High
Todd Johnson