Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Uriel Castillo

Luling,TX

Summary

Experienced with managing and coordinating construction projects from inception to completion. Utilizes effective leadership to ensure all tasks are executed efficiently and safely. Track record of fostering team collaboration and problem-solving to achieve project goals.

Overview

17
17
years of professional experience

Work History

Construction Foreman

West Hill Paving and Concrete Inc
San Marcos, TX
01.2021 - 05.2024
  • Supervised field crews to maximize quality and work efficiency.
  • Studied and interpreted blueprints to plan construction phases and team assignments.
  • Reduced safety incidents by implementing and enforcing strict safety guidelines and protocols.
  • Verified and submitted team timesheets.
  • Interacted with employees to demonstrate high standards and mitigate issues effectively.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Consistently met deadlines under pressure through diligent time management abilities.
  • Inspected work for compliance with applicable regulations and job specifications.
  • Ensured timely completion of projects by developing and maintaining schedules for work progress.
  • Coordinated dump truck operations for material transportation.
  • Confirmed equipment availability and fuel readiness for daily use.
  • Assessed spatial dimensions to coordinate plant orders for upcoming workday.
  • Operated various construction equipment including mini excavator, skid steer, rollers, and paving machine.
  • Concrete side
  • Contributed to successful completion of concrete-related assignments.
  • Calculated dimensions to determine concrete requirements.
  • Placed forms and rebar in specified locations for concrete.
  • Executed concrete smoothing and leveling processes.

Mechanical Engineer

San Marcos Air
San Marcos, TX
07.2018 - 01.2021

• Ensured all required materials were ready for daily operations.

• Reviewed construction drawings to mark positions for air ducts and straps.

•Assembled air ducts for installation.

• Ensured correct placement of air ducts in specified zones.

• Ensured airtight integrity by sealing air duct corners.

• Facilitated communication with crane operator for rooftop air unit installation.

• Verified functionality of equipment at day's end.

Construction Worker

Cribly Enterprise
San Antonio, TX
08.2015 - 03.2018
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Excavated footing for retaining walls.
  • Used skid steer to haul dirt from excavation area, and brought pallets of materials near the wall.
  • Manually placed each cinderblock for retaining wall and used skid steer to fill back of wall with gravel after every third row.
  • Operated a packing machine to compact the gravel.
  • Also laid brick pavers in different designs or formats
  • Put fine grade of sand for brick pavers, and used packing machine to tighten bricks
  • Swept remaining sand up and removed it, then run a blower



Floor Hand

Luling Well Service
Luling, TX
06.2007 - 06.2015
  • Aided in pipe handling tasks, such as lifting, moving, and connecting pipes during drilling operations.
  • Moved or relocated materials and equipment required for drilling tool assembly to and throughout work site.
  • Carried out general manual labor activities to aid site productivity.
  • Assisted in rig-up and rig-down procedures, ensuring timely project completion.
  • Showcased strong physical stamina throughout long shifts while remaining alert and focused on completing assigned tasks efficiently.
  • Enhanced drilling efficiency by maintaining and repairing equipment as needed.
  • Completed job tasks accurately under challenging weather conditions, demonstrating adaptability and resilience.
  • Provided assistance in assembly and disassembly of drilling rig and equipment.
  • Ensured smooth operations by performing routine maintenance on drilling equipment and machinery.
  • Executed daily operations quickly and accurately, achieving productivity targets.
  • Performed minor repairs on drilling equipment and tools to limit operational disruptions.

Education

None -

Luling High School
Luling, TX
05.2007

Skills

    Operate mini excavator, skid steer, rollers, packers, paving machine,

Languages

Spanish
Full Professional

Timeline

Construction Foreman

West Hill Paving and Concrete Inc
01.2021 - 05.2024

Mechanical Engineer

San Marcos Air
07.2018 - 01.2021

Construction Worker

Cribly Enterprise
08.2015 - 03.2018

Floor Hand

Luling Well Service
06.2007 - 06.2015

None -

Luling High School