Summary
Overview
Work History
Education
Skills
Professional Projects
Timeline
Generic

Vaibhav Khakkar

Canton,MI

Summary

Experienced Manufacturing Engineer with a proven track record in the automotive industry. Demonstrated expertise in lean manufacturing, process layouts, product development, and error-proofing techniques. Skilled at overseeing manufacturing programs and ensuring smooth operations. Utilizes strategic planning and problem-solving skills to drive productivity improvements. Known for fostering team collaboration and promoting a culture of continuous improvement. Holds a Master of Science (MS) in Manufacturing Engineering from Wayne State University.

Overview

12
12
years of professional experience

Work History

Manufacturing Program Manager

Quality Metalcraft
08.2021 - Current
  • Worked as Manufacturing Program Manager (Rivian, Lucid, Zoox, GM, FCA & Ford)
  • Lead Program Kickoff with launch and plant team
  • Perform Design Reviews with Engineer Team for Fixture, Assembly, Die and Cell Layout
  • Provide Manufacturing process guidance to estimating and quoting operations
  • Managing new engineering changes
  • Performing Financial Calculation
  • Providing Engineering inputs for Manufacturing process
  • Co-ordination with Customer, Supplier, Supply Chain, Production & Quality team
  • Lead Engineering Changes for All Program Management Team and Provide Engineering support
  • Providing and processing detail timeline for customer
  • Keeping track of timeline and open issue from suppliers
  • Collaborated with engineering teams to design customized solutions for unique client requirements, resulting in increased customer satisfaction rates.
  • Continuously improved manufacturing processes through regular performance evaluations, root cause analyses, and corrective action implementation.

Manufacturing and Processes Engineer

Quality Metalcraft
01.2017 - 07.2021
  • Area Spot welding manufacturing and process (Building 4)
  • Designing fixture for new product manufacturing using CATIA V5
  • Re-Designing fixture for current product to reduce downtime and quality alerts
  • Robot Programming for cell setup and part setup
  • Remodeling Cell Layout for improving production
  • Maintain production cycle and keeping downtime low
  • Analysis and root cause of downtime
  • Maintain weekly and daily robotic downtime and production data
  • Red Rabbits Error proofing procedures
  • Cycle time and time studies for weld cells
  • Kaizen implementation and 5s on weld cells
  • Area Prototype manufacturing and process (Building 2)
  • Developing layout for prototype product launch
  • Kaizen on manual re-spot area
  • Providing detail cycle time studies on each process
  • Implementation of time studies to reduce cycle time
  • Providing visual management and visual aid on manufacturing process

Engineering Intern, Machine Component Division

Bharat Forge
01.2013 - 12.2013
  • Quality checked using magna flux machine for crankshaft and inspected cracks to avoid failures
  • Mechanical design of clamps and fixture for Magna-Flux machines
  • Eliminated damage to the crankshaft on machine and improved life cycle of meshed wired plates
  • Implemented 5S in Machine Component Division, maximized resource allocation, and improved working condition on 11 lines
  • Recalibrated Super Finishing Machine to reduce oil consumption
  • Improved filtration of oil to maximize life cycle and quality of super finishing

Education

Master of Science - Manufacturing Engineering

Wayne State University
Detroit, Michigan
05.2017

Specialization - Mechanical Systems Design

Symbiosis International University
Pune, Maharashtra
05.2014

Skills

  • CAD Designing
  • Robotic
  • PLC
  • Plant Layouts
  • Manufacturing Procedure Optimization
  • Error Proofing process
  • Preventative Maintenance
  • Robotics Simulation
  • FANUC programming
  • NACHI programming
  • Draft Sight
  • Catia part design
  • Drafting tools
  • Solidworks
  • Process Mapping
  • Validation
  • Pneumatic system
  • Spot welding
  • Arc welding
  • Clinching
  • Riveting
  • Torquing
  • Adhesive system
  • Sheet metal stamping
  • Hydraulics systems

Professional Projects

  • Rivian, EDV Skateboard (Engineering Kick off, Processing, Design buyoff, Cell Manufacturing and Implementation), RT1 Skid Plate (Design Buyoff, Cell Manufacturing and Implementation), Pedal Bracket (Design Buyoff, Cell Manufacturing and Implementation)
  • Zoox, Zoox Chassis Component 10 different parts (Engineering Kick off, Processing, Design buyoff, Cell Manufacturing and Implementation)
  • Lucid, Lucid Air and Sapphire Component 18 different assemblies (Engineering Kick off, Processing, Design buyoff, Cell Manufacturing and Implementation)
  • Ford, Oil Pan Mustang (Design Buyoff, Cell Manufacturing and Implementation), 8 Mig parts for Ford F250 (Cell Manufacturing and Implementation)
  • GM, GM Bolt Line 12 Assemblies (Engineering Kick off, Processing, Design buyoff, Cell Manufacturing and Implementation), GM Volt line (Manufacturing and Lean updates), GM Corvette Floor (Manufacturing and Lean updates), GM CT 6 20 Assemblies (Manufacturing and Lean updates)

Timeline

Manufacturing Program Manager

Quality Metalcraft
08.2021 - Current

Manufacturing and Processes Engineer

Quality Metalcraft
01.2017 - 07.2021

Engineering Intern, Machine Component Division

Bharat Forge
01.2013 - 12.2013

Specialization - Mechanical Systems Design

Symbiosis International University

Master of Science - Manufacturing Engineering

Wayne State University
Vaibhav Khakkar