Summary
Overview
Work History
Education
Skills
Accomplishments
Software
Timeline
Generic

VENKATA GANESH BODDAPATI

MANAGER MECHANICAL MAINTENANCE
Doha

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

14
14
years of professional experience
7
7
years of post-secondary education

Work History

Acting Supervisor / Senior Technician Mechanical

Q Terminals
Qatar
04.2017 - Current


  • Ensure on timely completion of preventive maintenance as per schedule of all equipment to increase equipment reliability and to reduce equipment downtime.
  • Recording of all activities in CMMS and analyzing the data to identify gaps in maintenance process and training needs .
  • Taking steps to improve maintenance process by practicing LEEN management & by reviewing work orders .
  • Ensure 5S is adhered to at all work locations.
  • Ensuring good communication between maintenance and operations department to ensure smooth operations.
  • Self-motivated, with a strong sense of personal responsibility.
  • Ensuring proper feedback and communication transparency is maintained throughout the maintenance crew.



Assistant Manager

ADANI
MUNDRA
01.2014 - 03.2017
  • Ensure the highest quality level in terms of maintenance, readiness and repair, as well as to maintain the operational viability of the terminal facility and all operations handling equipment.
  • Monitoring and developing maintenance staffs to ensure technical skills are maintained, and that a transfer of that knowledge is made whenever appropriate.
  • Ensuring good communications through technical group and related interactions so that activities are running smoothly on a regular basis.
  • Ensuring good communication between maintenance and operations department to minimize equipment downtime.
  • Overseeing the administrative requirements of the Workshop, including warranty obligations, inspection records, manual updates, equipment defect reports, maintenance services, policies, procedures, and practices.
  • Reviewing and recommending updates to maintenance services policies and procedures to ensure quality, reliability, and efficiencies.
  • Briefing daily activities to the General Manager and seeking advice as required.
  • Defined clear targets and objectives and communicated to other team members.

Maintenance Engineer

L & T
Chennai
12.2011 - 01.2014


  • Ensuring availability and reliability of all plant equipment.
  • Carrying out breakdown analysis and failure analysis and taking corrective measures or modifications to reduce the down time.
  • Condition monitoring of lifting equipment’s accessories and lifting gears.
  • Carrying out inspection of wire ropes as per ISO standards and replacing the same as per rejection factors
  • Preparing diesel consumption report and man power utilization report on daily basis.
  • Inspection and maintenance of critical components like brakes & Twist locks as per OEM standards.

Maintenance Executive

Visakha Container Terminal Pvt Ltd
Visakhapatnam
12.2008 - 12.2011
  • Ensuring availability and reliability of all plant equipment.
  • Carrying out breakdown analysis and failure analysis and taking corrective measures or modifications to reduce the down time.
  • Condition monitoring of lifting equipment’s accessories and lifting gears.
  • Carrying out inspection of wire ropes as per ISO standards and replacing the same as per rejection factors
  • Preparing diesel consumption report and man power utilization report on daily basis.
  • Inspection and maintenance of critical components like brakes & Twist locks as per OEM standards.

Education

Bachelor of Science - Mechanical Engineering

Sharda Institute of Technology & Management
Andhrapradesh
06.2004 - 01.2011

Skills

    Maintenance Management

undefined

Accomplishments

  • Achieved 50% Wrench time by accurate planning & Scheduling of all maintenance Activities.
  • Reduced overtime from 40% to 2% by implementing planning, scheduling and Reliability centered maintenance strategy.
  • Supervised a team of 20 staff members.
  • Collaborated with team of 4 in the commissioning of 8 Quay Cranes and 26 RTG's.
  • Used Microsoft Excel to develop inventory tracking spreadsheets.

Software

MS Office

Maximo

Auto Cad

Timeline

Acting Supervisor / Senior Technician Mechanical

Q Terminals
04.2017 - Current

Assistant Manager

ADANI
01.2014 - 03.2017

Maintenance Engineer

L & T
12.2011 - 01.2014

Maintenance Executive

Visakha Container Terminal Pvt Ltd
12.2008 - 12.2011

Bachelor of Science - Mechanical Engineering

Sharda Institute of Technology & Management
06.2004 - 01.2011
VENKATA GANESH BODDAPATIMANAGER MECHANICAL MAINTENANCE