Overview
Work History
Skills
Timeline
Generic

Victor Cruz

Galena Park,TX

Overview

3
3
years of professional experience

Work History

I&E Technician

Reddit Services
Longview, Louisiana
04.2024 - Current
  • Developed and managed preventive maintenance program using Type system to manage and document maintenance activities.
  • Contributed to successful plant expansion projects by providing expert knowledge on I&E design requirements and specifications.
  • Implemented energy-efficient solutions that resulted in cost savings for the organization without compromising operational efficiency or quality standards.
  • Partnered with installer to troubleshoot and resolve instrumentation and electrical equipment and automation issues.
  • Supported new equipment commissioning and start-up processes, ensuring seamless integration into existing I&E infrastructure.
  • Increased production output with proper installation, configuration, and calibration of new equipment.
  • Provided technical support during project planning, ensuring accurate budgeting and timely completion of tasks.
  • Enhanced system efficiency by calibrating and maintaining instrumentation and control devices.
  • Tested wiring and other system parts for electrical flow and function.
  • Installed electrical conduit and wiring for power, controls, and lighting.
  • Replaced faulty wiring, switches and circuit breakers to reduce fire risks, boost service capacity and increase versatility.
  • Tested, troubleshot, and calibrated equipment in shop and field.
  • Installed, adjusted and calibrated electrical equipment and instrumentation to maintain proper performance.
  • Disconnected and removed motors and pumps.
  • Installed electrical wiring through conduits and holes in both flooring and walls.

3rd Year Electrical Apprentice (Terminations)

MMR
Houston, TX
08.2023 - 12.2023
  • Installed and wired electrical transformers, service panels, and circuit breakers.
  • Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
  • Planned layout and installation of electrical wiring, equipment, and fixtures based on specifications and applicable code.
  • Inspected electrical systems, equipment and components to identify hazards, defects, and repair requirements.
  • Used testing instruments such as ohmmeters, voltmeters, ammeters, and multimeters.
  • Read and interpreted electrical, mechanical, and architectural drawings and electrical code specifications for wiring layouts.
  • Tested continuity of circuits in electrical wiring, equipment and fixtures using oscilloscopes.

I&E Technician

Sheppard Services, LLC
Theodore, AL
04.2023 - 08.2023
  • Contributed to successful plant expansion projects by providing expert knowledge on I&E design requirements and specifications.
  • Partnered with installer to troubleshoot and resolve instrumentation and electrical equipment and automation issues.
  • Collaborated with cross-functional teams to optimize plant operations and improve overall performance.
  • Drove continuous improvement initiatives across I&E systems using data-driven approaches to achieve measurable results.
  • Increased production output with proper installation, configuration, and calibration of new equipment.
  • Provided technical support during project planning, ensuring accurate budgeting and timely completion of tasks.
  • Assisted process engineers in identifying root causes of recurring issues within I&E systems, leading to long-term resolutions.
  • Tested wiring and other system parts for electrical flow and function.
  • Installed electrical conduit and wiring for power, controls, and lighting.
  • Replaced faulty wiring, switches and circuit breakers to reduce fire risks, boost service capacity and increase versatility.
  • Tested, troubleshot, and calibrated equipment in shop and field.
  • Performed preventive maintenance tasks to verify proper working condition of electrical panels and conduits.
  • Installed, adjusted and calibrated electrical equipment and instrumentation to maintain proper performance.
  • Disconnected and removed motors and pumps.
  • Installed electrical wiring through conduits and holes in both flooring and walls.
  • Inspected equipment for defects and safety hazards and completed necessary repairs.
  • Interpreted blueprints, schematics, drawings, and layouts to complete repairs.

3rd Year Electrical Apprentice

Petterson Electric I&E
Humble, Texas
11.2022 - 04.2023
  • Installed conduit, EMT
  • Installed lighting fixtures following standard procedures
  • Ensured compliance with all applicable codes related to the installation of electrical systems
  • Installed conduit for new construction projects
  • Connected wires to circuit breakers, transformers, outlets, or other components
  • Read blueprints and schematics to determine layout of electrical wiring and equipment placement
  • Conducted routine maintenance and repairs on mechanical systems and industrial equipment
  • Prioritized and organized tasks to efficiently accomplish service goals
  • Installed conduit systems including EMT, rigid conduit, flexible conduit
  • Worked with a variety of materials including PVC conduits, copper wiring, aluminum wiring and MC cables
  • Ran cable trays for power distribution from main panels to branch circuits
  • Pulled wires through conduit runs using fish tapes or pull strings when necessary
  • Dug trenches and created holes to pull conduit and install supports
  • Pulled insulated wires or cables through conduits to complete circuits

2nd Year Electrical Apprentice

Higdon Construction
Houston,TX
10.2021 - 11.2022
  • Installed conduit, pvc
  • Worked on ground
  • Under grown conduit
  • Installed junction boxes
  • Installed cable tray
  • Installed tubing
  • Terminations
  • Skilled at working independently and collaboratively in a team environment.
  • Worked under supervision of journeyman electrician to learn trade and develop electrical knowledge.
  • Terminated wiring and connected circuits with correct techniques.
  • Pulled EMT and PVC conduit wire according to plans and code requirements.

1st Year Electrical Apprentice

Contech
Houston, TX
06.2021 - 10.2021
  • Work on EMT, ridged, pvc, tubing
  • Removed old wires from structures safely without damaging them
  • Installed junction boxes, switches, outlets and other electrical components
  • Installed junction boxes according to local building codes for support purposes
  • Pulled wires through conduits or other passageways using a wire puller tool
  • Dug trenches and created holes to pull conduit and install supports
  • Worked with a variety of hand tools such as wire strippers and crimpers
  • Installed conduit for new wiring
  • Worked on high voltage switchgear projects involving transformer hookups and terminations up to 15kv level
  • Installed conduit, wire and motor controls

Skills

  • Installing conduit
  • Grounding
  • Install cable tray
  • Terminations
  • Install tubing
  • Running PVC for grounding
  • Operating heavy equipment Such as JLG skid steer
  • Troubleshooting
  • Calibrations
  • Read prints
  • I&E technician

Timeline

I&E Technician

Reddit Services
04.2024 - Current

3rd Year Electrical Apprentice (Terminations)

MMR
08.2023 - 12.2023

I&E Technician

Sheppard Services, LLC
04.2023 - 08.2023

3rd Year Electrical Apprentice

Petterson Electric I&E
11.2022 - 04.2023

2nd Year Electrical Apprentice

Higdon Construction
10.2021 - 11.2022

1st Year Electrical Apprentice

Contech
06.2021 - 10.2021
Victor Cruz