Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Victor Galan

Dallas,TX

Summary

Highly motivated, hardworking and dependable concrete super with desire to take on new challenges. Experienced in multifamily and commercial ground up and new addition projects, heavy equipment operation knowledge strong drive to take charge and adapt to change.

Hard-working Site Manager with [Number] years of experience. Educated in OSHA safety requirements and experienced leading team of over [Number] workers. Proficient in carpentry, flooring installation, concrete work, framing, cabinetry, painting, and forklift operation.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Lead Superintendent

Rios Brothers concrete
Fort Worth, TX
06.2024 - 12.2024
  • Supervision of onsite personnel and subcontractors.
  • Overseeing all phases of construction from start to finish.
  • Allocation and scheduling of resources and subs to assigned projects as required.
  • Developing, tracking and updating of project schedules.
  • Daily communication with builders, project managers, inspectors, vendors and other trades.
  • Implementation of company expectations on every project.
  • Tracking of project progress.
  • Surveying and general revision of all phases completed insuring all dimensions and elevations are to spec.
  • Quality control walks with builders and owners.

Superintendent

Largo concrete
Irving, TX
03.2020 - 06.2024
  • Overseeing of daily operations on site and on field coordination during course of projects
  • Development of schedules and budgets
  • Interpretation of construction documents, plans and specifications to field crews and subs.
  • Provided guidance, mentoring and direction to crew members
  • Developed and maintained daily reports
  • Communicated with G.C, architects, engineers, project managers regarding project updates, changes in scope or schedule daily
  • Worked successfully with diverse trades to accomplish goals and address issues and concerns related to our scope and product
  • Assisted with pre pour inspections
  • quality control walks, sub meetings and tool box talks weekly
  • Reporting of project status, site problems and labor status to project manager and general super
  • Assessed work areas for potential hazards or risk
  • Operated heavy equipment in compliance with company operating and safety policies
  • assisted crews with foundation excavations, grading, wall erections, spoil haul off, concrete demo
  • layout of excavations
  • logging of equipment and tool inspection reports aiding in quick repairs
  • Performed work in a timely and cost-effective manner, prioritizing across work orders, staff routines, and service requests
  • Overseen and managed concrete pours ,wall erections, and excavations from start to finish,ensuring adherence to specs and timelines.
  • Completion of day to day duties on time and on schedule
  • Scheduled concrete, concrete pumps, washouts, dumpsters ,equipment and supplies/materials
  • Enforced on time, on budget completion of assigned tasks
  • Assist with completion of punch list
  • Time and attendance tracking and entry daily into Hh2 payroll system
  • Coordinate with project managers, G.Cs
  • implemented company policies to crews and subs.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
  • Collaborated with architects, engineers, and contractors to achieve seamless project execution.
  • Evaluated subcontractor performance regularly, ensuring adherence to contract requirements and maintaining accountability throughout the lifecycle of each project.

Lead Foreman/operator

Osburn contractors
Garland, TX
11.2016 - 03.2020
  • Communicate daily task and goals to field crew
  • Managed crew by focusing on safety, operations and productivity
  • Assisted with layout of tilt panels, footings, slabs, parking lots
  • Performed various carpentry duties based on drawing details and specifications
  • Operated heavy machinery to excavate footings, foundations, grading, trenches, loading rubble and debris
  • Managed the work to ensure that it was completed in compliance with drawings
  • Assisted with concrete pours
  • Communicated superintendent comments and request to field crew

Concrete Finisher

SCR Civil Construction
Richmond, TX
04.2015 - 10.2016
  • Layout of reinforcing and form work per drawing specs
  • And details
  • Drilled/cored for dowel placement and repair
  • Performed various carpentry task
  • Performed elevation and quality checks prior to concrete pours
  • Assisted with placement and finishing of concrete pours
  • Assisted with lane closures on live roads and highways
  • Operated heavy equipment for grading, trenches, demolition of concrete barriers,paving and mow strips
  • Operated skytrak for ctb placement and removal , loading and unloading of material
  • Operated gomaco on concrete barrier pours

Education

Diploma -

Sunset high school
12.2006

Skills

  • Carpentry
  • Concrete Finishing
  • Bluebeam
  • Procore
  • Quickbase
  • Project Coordination
  • Construction Management
  • Osha30
  • Bilingual
  • leadership
  • Mentoring staff
  • Site coordination
  • Schedule development
  • Teamwork and collaboration
  • Attention to detail
  • Flexible schedule
  • Specification and blueprint interpretation

Certification

  • First Aid Certification
  • OSHA10
  • OSHA30

Languages

English
Full Professional
Spanish
Full Professional

Timeline

Lead Superintendent

Rios Brothers concrete
06.2024 - 12.2024

Superintendent

Largo concrete
03.2020 - 06.2024

Lead Foreman/operator

Osburn contractors
11.2016 - 03.2020

Concrete Finisher

SCR Civil Construction
04.2015 - 10.2016

Diploma -

Sunset high school
Victor Galan